RISK DESCRIPTION
SECTION 1
Description: (Item: 1) Building(s): Block A at Rose Hall, Little River PO, Montego Bay, St. James - constructed of
Reinforced Concrete Block walls with Concrete Slab roof.
Sum Insured $2,412,425.40
Description: (Item: 2) Building(s): Block B at Rose Hall, Little River PO, Montego Bay, St. James - constructed of
Reinforced Concrete Block walls with Concrete Slab roof.
Sum Insured $2,412,425.40
Description: (Item: 3) Building(s): Block C at Rose Hall, Little River PO, Montego Bay, St. James - constructed of
Reinforced Concrete Block walls with Concrete Slab roof.
Sum Insured $2,412,425.40
Description: (Item: 4) Building(s): Block D at Rose Hall, Little River PO, Montego Bay, St. James - constructed
of Reinforced Concrete Block walls with Concrete Slab roof.
Sum Insured $2,412,425.40
Description: (Item: 5) Building(s): Block E at Rose Hall, Little River PO, Montego Bay, St. James - constructed of
Reinforced Concrete Block walls with Concrete Slab roof.
Sum Insured $2,124,987.48
Printed On: August 12, 2022 @ 09:05:07 By: AP24,Head Office/; Form ID: 0
Pg 1 of 5
THE SCHEDULE OF POLICY PSP-1020543
CONSEQUENT ON TRANSACTION NB - 4285075
May 30, 2022 at 12:01 AM to May 29, 2023 at 11:59 PM
Description: (Item: 6) Building(s): Block F at Rose Hall, Little River PO, Montego Bay, St. James - constructed of
Reinforced Concrete Block walls with Concrete Slab roof.
Sum Insured $3,535,113.12
Description: (Item: 7) Building(s): Block G at Rose Hall, Little River PO, Montego Bay, St. James - constructed
of Reinforced Concrete Block walls with Concrete Slab roof.
Sum Insured $2,252,374.74
Description: (Item: 8) Building(s): Block H (Commisary) at Rose Hall, Little River PO, Montego Bay, St. James -
constructed of Reinforced Concrete Block walls with Concrete Slab roof.
Sum Insured $49,928.34
SECTION 3
Description: (Item: 9) Miscellaneous: Pool at Rose Hall, Little River PO, Montego Bay, St. James
Sum Insured $49,285.34
SECTION 4
Description: (Item: 10) Money : Money belonging to the insured or held in trust
Loss Limit $3,500.00
Printed On: August 12, 2022 @ 09:05:07 By: AP24,Head Office/; Form ID: 0
Pg 2 of 5
THE SCHEDULE OF POLICY PSP-1020543
CONSEQUENT ON TRANSACTION NB - 4285075
May 30, 2022 at 12:01 AM to May 29, 2023 at 11:59 PM
EXCESS
Hurricane, Cyclone, Tornado, Windstorm, Storm, Tempest, Earthquake, Volcanic Eruption and Flood (including overflow of the sea)
caused by these perils -2% of Sum Insured per item of the schedule or 0.25% of the Total Sum Insured per location/ category,
whichever is greater
Any other insured perils excluding Fire and Lightning -1% of claim, minimum US$100.00 maximum US$2,000.00
LIMITS OF LIABILITY
1 Personal & Public Liability
Claim or series of claims for bodily injury or property damage during any one policy period 200,000.00
2 Employer's Injury
Bodily Injury or Death to Employees any one period of insurance 200,000.00
3 Tenant's Liability
Tennants for damage to the property rented, not exceeding 10% of Sum Insured any one period
4 Property Owners Liability
Maximum amount payable by the company for claims against the property owner any one period 200,000.00
Extensions:
19. Thirty (30) Days Cancellation Notice – Ten (10) days for non-payment of premium
20. Thirty (30) Days Claims Notification
21. Unoccupancy Clause – 30 days
22. Wide Description Clause
23. Windstorm Cover for external fixtures, awnings, fixed equipment, gates and fences – included in sum insured
24. Workmen's Clause
25. Works and Permits
Conditions:
1) Installation of Fire Hose reels for the fire hydrants within 120 days of inception of coverage
2) Completion of roof replacement within 12 months of inception of coverage
Recommendations:
- Fire Hydrants to be tested at least once per year.
- Hose reels when installed to be inspected at least twice per year
- Fire Extinguishers to be installed on each floor of each Block
- Each apartment to be equipped with smoke detectors
Printed On: August 12, 2022 @ 09:05:07 By: AP24,Head Office/; Form ID: 0
Pg 4 of 5
THE SCHEDULE OF POLICY PSP-1020543
CONSEQUENT ON TRANSACTION NB - 4285075
May 30, 2022 at 12:01 AM to May 29, 2023 at 11:59 PM
Authorized Signature
Printed On: August 12, 2022 @ 09:05:07 By: AP24,Head Office/; Form ID: 0