SECTION 24 : GEOTEXTILE
TABLE OF CONTENTS
CONTENTS PAGE
24.1 Geotextile Fascine Mattress ....................................................................... S24-1
24.1.1 General ..................................................................................... S24-1
24.1.2 Geotextile Material..................................................................... S24-1
24.1.3 Timber or Bamboo Fascine Mattress ......................................... S24-1
24.1.4 Installation ................................................................................. S24-2
24.1.5 Initial Fill over Geotextile Bamboo Fascine Mattress.................. S24-2
24.2 Seperator Geotextile over Final Formation level......................................... S24-3
24.2.1 General ..................................................................................... S24-3
24.2.2 Geotextile Material..................................................................... S24-4
24.3 Filter Geotextiles ........................................................................................ S24-4
24.4 Labeling, Packing, Storage and Handling of Materials ............................... S24-4
24.5 Submission ................................................................................................ S24-5
________________________________________________________________________________________________
i
Revised on 6 Oct. 2011
EDTP GEMAS-JOHOR BAHRU TECH. SPEC. FOR ARCH., C&S AND MEP
24.1.1 General
24.1.4 Installation
An initial 500mm thick sand material shall be placed over the geotextile
fascine mattress without the associated use of compaction plant.
Subsequent fill layers using suitable soil fill shall be deposited and
compacted in accordance with the relevant Clauses of the Earthworks
Specifications. The initial fill shall be placed within 7 days of the
placement of geotextile in any one area failing which the geotextile may
be rejected.
________________________________________________________________________________________________
The first 500mm fill over the geotextile bamboo fascine mattress shall be
hard, clean, crushed rock, gravel or sand complying with the
requirements of Table 24-2.
Table 24-2
The fill shall be spread over the geotextile bamboo fascine mattress using
light earthworks plant such as back pushers or swamp dozers and in such
manner as to ensure minimal mudwaves ahead of the filling front. All
equipment for use and the sequence of filling shall be to the agreement of
the S.O.. In the event that the S.O. is of the opinion that mudwaves are
excessive, he may instruct the use of draglines to deposit sand in thin
lifts.
24.2.1 General
________________________________________________________________________________________________
The geotextile shall comply with the requirements given in Table 24-1.
________________________________________________________________________________________________
The product grade, manufacturer's name and lot number shall be printed
directly on the geotextile. The printing shall be part of the manufacturing
process and shall be on a spacing of 2m x 2m.
Rolls shall be stored in a manner which protects them from the elements.
If stored outdoors, they shall be elevated and protected with a waterproof
cover.
24.5 Submission
The S.O. may order the carrying out of tests to check for compliance and
the cost of all testing shall be borne by the Contractor.