The Statement of Purpose Mba Program PDF

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

The Statement of Purpose (MBA Program)

Ever since I visited the Indian Oil Refinery in Panipat, I have been fascinated with the process of
converting crude oil into petrol, kerosene and other oil derivatives. This inclination has driven
me to pursue a career in the oil & energy sector. My vast experience in this industry has
provided me with the holistic view of the business besides technical know how. With MBA, I
intend to enhance my business knowledge and build upon my managerial aptitude.

I work as an Electrical Design Engineer for Samsung Engineering India, a subsidiary of


Samsung Engineering Co. Ltd., South Korea, which is an EPC & PM company for Oil & Gas,
Petrochemical and Fertilizer projects. My job includes activities such as front end engineering
design(FEED), pre-bid engineering & detail design engineering of the electrical aspects of these
projects.

In the first year of my employment, I was entrusted to represent the electrical design
engineering team at a petrochemical site in Dahej SEZ, Gujarat, where I co ordinated with
m

multiple stakeholders such as client (ONGC), project management consultant(EIL), vendors,


co

sub contractors, licensor and construction team simultaneously. The fact that I was still naive as
e.

compared to the highly experienced employees of the above stakeholders and was leading a
team of 10 personnel for precommisioning activities made it a highly challenging task. I
di

successfully delivered a dynamic monitoring model for tackling construction problems by


preventing delay in schedule. Construction site query resolutions are high-on-risk and high-
ir

onpressure, leaving no room for error. A small negligence can incur heavy loss, both in terms of
ub

life and property. Dealing with these difficult situations has honed my decision-making skills and
made me a better troubleshooter. I was appreciated by the Project Manager for clearing punch
ed

points and achieving mechanical completion on time.

During the detail engineering of West Qurna Project, Iraq, which was jointly executed by both
India design office and Seoul Head Office, I along with my team came up with a proposal of
replacing the circuit breaker assembly for high voltage motor protection with switch-fuse-
contactor units, which, although was not strictly as per client specification, had the potential of
substantial cost savings. After this proposal received clearance from India office, I was
handpicked by upper management to be deputed to Seoul HO to present this cost saving
engineering solution to the client. This proposal was agreed by client & implemented in the
project on profit sharing basis. Negotiating with clients on changes in contracts considering the
impact on overall project executionhas honed my analytical, negotiation and presentation skills.
Furthermore, my tenure at Seoul HO has helped me gain invaluable experience of working in a
multicultural and multiethnic work environment.

My consistent and exemplary work performance at India design centre, Seoul Head Office and
project construction site have earned me a place in the top 10% employees of the Electrical
department and I was promoted to the techno-managerial position of Senior Engineer in the
year 2016. I am presently leading a team of 15 members including junior engineers, draftsmen
and document controllers.

ThisKorean
study sourcework culturebyhas
was downloaded instilled from
100000822695933 in me the values
CourseHero.com of proactively
on 10-06-2022 catering
21:42:58 GMT -05:00 to the client

1/2
https://www.coursehero.com/file/168053982/the-statement-of-purpose-mba-programpdf/
requirements which lead to project commisioning even before the schedule delivery, resulting in
increased credibility. My stint in Samsung has, on one hand, nurtured my leadership abilities
and on the other hand, made me conversant with the art of stakeholder management,
manpower management, client consulting and working across domains in a cross functional &
cross cultural work environment.

m
co
e.
di
ir
ub
ed

This study source was downloaded by 100000822695933 from CourseHero.com on 10-06-2022 21:42:58 GMT -05:00

2/2
https://www.coursehero.com/file/168053982/the-statement-of-purpose-mba-programpdf/
Powered by TCPDF (www.tcpdf.org)

You might also like