Wastewater Management Ref:

Sewage Treatment Plant Project Date: October 2, 2018

Project Name: Wil Tower 2 Encore Category: 3, Design Dev't


Location: Eugenio Lopez Jr. Drive, Diliman, Quezon City Bldg Type: Residential/Commercial

Project Description
Project Timeline:
Projected Turn-Over: Occupancy Rate:

Residential Units: 513 units Commercial Area: 0 m2


Studio Type 378 units Retail 0 m2
1-Bedroom 135 units Restaurants 0 m2
2-Bedroom - units Supermarket 3900.57 m2
3-Bedroom - units

Amenities
2 2
EE/Auxiliary Rm. - m Game Room - m
2 2
Res'l Lobby - m Admin Office - m
2 2
Mail Rm. - m Sec. Office - m
2
Toilet - m
2
Function Room - m
2
Fitness Gym - m

Capacity and Treatment Process


Location: Plant Orientation:
Scheme: Phasing
Total Capacity: 220.00 cmd Computed Capacity: 195 cmd
Required Area: 180 m2 Available Area: m2
Required Depth +
6.00 m
Maintenance: Available Depth:
Type of Treatment Process:

Use of STP: Domestic/Commercial Access:


Influent Sewer Config.: Effluent Discharge Pt.:

Wastewater Quality

Parameter Unit Phase 1 Design Values Remarks


BOD mg/L 400.00
COD mg/L 600.00
TSS mg/L 200.00
Oil/Grease mg/L 100.00
pH 0 6.0 - 9.0
Color PCU 150.00