This document contains 4 monitoring reports from a construction project:
1. A report monitoring the filling of air for branch control valves on different floors and zones, noting conditions, required repairs, and scheduled filling dates.
2. A schedule for dropper work on different floors and zones, noting deficiencies, work periods, and required main power.
3. A status report on pump rooms, noting conditions of jockey, electric, and diesel pumps and their pressures and statuses.
4. A schedule for internal testing of branch control valves on different floors and zones of two areas, noting locations, conditions, work periods, completion times, and required number of workers.
This document contains 4 monitoring reports from a construction project:
1. A report monitoring the filling of air for branch control valves on different floors and zones, noting conditions, required repairs, and scheduled filling dates.
2. A schedule for dropper work on different floors and zones, noting deficiencies, work periods, and required main power.
3. A status report on pump rooms, noting conditions of jockey, electric, and diesel pumps and their pressures and statuses.
4. A schedule for internal testing of branch control valves on different floors and zones of two areas, noting locations, conditions, work periods, completion times, and required number of workers.
This document contains 4 monitoring reports from a construction project:
1. A report monitoring the filling of air for branch control valves on different floors and zones, noting conditions, required repairs, and scheduled filling dates.
2. A schedule for dropper work on different floors and zones, noting deficiencies, work periods, and required main power.
3. A status report on pump rooms, noting conditions of jockey, electric, and diesel pumps and their pressures and statuses.
4. A schedule for internal testing of branch control valves on different floors and zones of two areas, noting locations, conditions, work periods, completion times, and required number of workers.
MONITORING PENGISIAN AIR BRANCH CONTROL VALVE (OPEN BCV)
No. Perincian Kondisi Keterangan Jadwal pengisian
1 BCV Lantai B2 (ZONA A) Terbuka
BCV Lantai B2 (ZONA B) Terbuka
2 BCV Lantai B1 (ZONA A) Terbuka
BCV Lantai B1 (ZONA B) Tertutup Repair ruang Aerocom 05 Oktober 2022
3 BCV Lantai 1 (ZONA A) Tertutup Kitchent Kordinasi tim Kitchen - APG
BCV Lantai 1 (ZONA B) Terbuka
4 BCV Lantai 2 (ZONA A) Terbuka
BCV Lantai 2 (ZONA B) Tertutup Repair titik sprinkler 06 Oktober 2022
5 BCV Lantai 3 (ZONA A) Terbuka
BCV Lantai 3 (ZONA B) Terbuka
6 BCV Lantai 4 (ZONA A) Terbuka
BCV Lantai 4 (ZONA B) Tertutup Repair Cross ducting 07 Oktober 2022
7 BCV Lantai 5 (ALL ZONA) Terbuka
8 BCV Lantai 6 (ALL ZONA) Terbuka 9 BCV Lantai 7 (ALL ZONA) Terbuka 10 BCV Lantai 8 (ALL ZONA) Tertutup Proses pengecekan 08 Oktober 2022 PROYEK : RS HARAPAN KITA PT. AMAR MAJU TEHNIK TANGGAL : 27-Sep-22 REVISI : REV-0
JADWAL PEKERJAAN DROPER
No. Perincian Kekurangan Pengerjaan Main Power
1 Droper lantai 2 zone B as 21 lobby Lift 6 Titik 27 -28 September 2022 2
2 Droper lantai 3 zone B as 21 lobby Lift 15 Titik 28 - 29 September 2022 2 3 Droper lantai 4 zone B as 21 lobby Lift full 4 Droper lantai 5 zone B as 21 lobby Lift full 5 Droper lantai 6 zone B as 21 lobby Lift full 6 Droper lantai 7 zone B as 21 lobby Lift 12 Titik 28 - 29 September 2022 2 7 Droper lantai 8 zone B as 21 lobby Lift full
8 Droper lantai 2 zone A as 28 lobby Lift 4 Titik 27 -28 September 2022 2
9 Droper lantai 3 zone A as 28 lobby Lift full 10 Droper lantai 4 zone A as 28 lobby Lift full 11 Droper lantai 5 zone A as 28 lobby Lift full 12 Droper lantai 6 zone A as 28 lobby Lift full 13 Droper lantai 7 zone A as 28 lobby Lift full 14 Droper lantai 8 zone A as 28 lobby Lift full
PROYEK : RS HARAPAN KITA TANGGAL : 27-Sep-22 REVISI : REV-0
STATUS RUANG POMPA
No. Perincian Kondisi KETERANGAN
1 Jokey Pump STAND BY
TEKANAN 10 BAR
2 ELECTRIC PUMP STAND BY
TEKANAN 9,1 BAR
3 DIESEL PUMP STAND BY
TEKANAN 8 BAR
4 PANEL JOKEY & ELECTRIC PUMP ON
PROYEK : RS HARAPAN KITA PT. AMAR MAJU TEHNIK TANGGAL : 30-Sep-22 REVISI : REV-0
JADWAL TEST INTERNAL OPENING BCV
No. Perincian Lokasi Kondisi Pengerjaan Selesai Pekerja
1 BCV Lantai B2 (Riser Sprinkler AS 21) Zona A Terbuka
2 BCV Lantai B1 (Riser Sprinkler AS 21) Zona A Terbuka 3 BCV Lantai 1 (Riser Sprinkler AS 21) Zona A Tertutup Pukul 08:00 Tgl 01 Oktober 2020 Pukul 12:00 Tgl 01 Oktober 2020 5 Orang 4 BCV Lantai 2 (Riser Sprinkler AS 21) Zona A Terbuka 5 BCV Lantai 3 (Riser Sprinkler AS 21) Zona A Tertutup Pukul 13:00 Tgl 01 Oktober 2020 Pukul 18:00 Tgl 01 Oktober 2020 5 Orang 6 BCV Lantai 4(Riser Sprinkler AS 21) Zona A Tertutup Pukul 19:00 Tgl 01 Oktober 2020 Pukul 22:00 Tgl 01 Oktober 2020 5 Orang 7 BCV Lantai 5 (Riser Sprinkler AS 21) Zona A Tertutup Pukul 08:00 Tgl 02 Oktober 2020 Pukul 12:00 Tgl 02 Oktober 2020 5 Orang 8 BCV Lantai 6 (Riser Sprinkler AS 21) Zona A Tertutup Pukul 13:00 Tgl 02 Oktober 2020 Pukul 18:00 Tgl 02 Oktober 2020 5 Orang 9 BCV Lantai 7 (Riser Sprinkler AS 21) Zona A Tertutup Pukul 19:00 Tgl 02 Oktober 2020 Pukul 22:00 Tgl 02 Oktober 2020 5 Orang 10 BCV Lantai 8 (Riser Sprinkler AS 21) Zona A Tertutup Pukul 08:00 Tgl 03 Oktober 2020 Pukul 12:00 Tgl 03 Oktober 2020 5 Orang
11 BCV Lantai B2 (Riser Sprinkler AS 28) Zona B Terbuka
12 BCV Lantai B1 (Riser Sprinkler AS 28) Zona B Terbuka 13 BCV Lantai 1 (Riser Sprinkler AS 28) Zona B Tertutup Pukul 08:00 Tgl 01 Oktober 2020 Pukul 12:00 Tgl 01 Oktober 2020 5 Orang 14 BCV Lantai 2 (Riser Sprinkler AS 28) Zona B Tertutup Pukul 13:00 Tgl 01 Oktober 2020 Pukul 18:00 Tgl 01 Oktober 2020 5 Orang 15 BCV Lantai 3 (Riser Sprinkler AS 28) Zona B Tertutup Pukul 19:00 Tgl 01 Oktober 2020 Pukul 22:00 Tgl 01 Oktober 2020 5 Orang 16 BCV Lantai 4(Riser Sprinkler AS 28) Zona B Tertutup Pukul 08:00 Tgl 02 Oktober 2020 Pukul 12:00 Tgl 02 Oktober 2020 5 Orang