General Specification: 2017 EDITION (Incorporating Corrigendum No. Gsee02-2017)
General Specification: 2017 EDITION (Incorporating Corrigendum No. Gsee02-2017)
General Specification: 2017 EDITION (Incorporating Corrigendum No. Gsee02-2017)
FOR
ELECTRICAL INSTALLATION
IN
GOVERNMENT BUILDINGS
OF
2017 EDITION
(INCORPORATING CORRIGENDUM NO. GSEE02-2017)
In plant room, switch room or similar area where surface conduits are
installed, socket outlets shall be metalclad or bronze front plate.
Socket outlet and plug for one voltage system shall not be
interchangeable with those for use at other voltage and/or frequency
systems in the same installation.
Photocell device shall comply with BS 667:2005 and shall have good
tolerances in physical dimensions and with no moving parts. An
additional circuitry shall be provided to achieve a delay of at least
30 seconds so as to eliminate switching due to lightning or other short
period changes in illumination.
C4.6.4 Lampholder