Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

PolicyFax

Someone Please Hold for Pickup at this Location Requested this Information
I Following this cover page are the documents you requested from PolicyFax. We hope you found the service convenient and easy to use, and that the information satisfies your needs.
PolicyFax is a service of The Heartland Institute, a source of research and commentary on public policy issues. Heartland is not affiliated with any political party, business, or foundation. Its activities are tax-exempt under Section 501 (c)3 of the Internal Revenue Code. PolicyFax is made possible by the contributions of nearly 1,000 Heartland donors and members nationwide. PoiicyFax documents offers from 24.hour access by nearly eighty different fax to hundreds think tanks. of

Dial 510/208-8000
Press 1 to order documents.
At the be!ow) &&d document voice prompt, enter your account number (see 01 visa 01 MasterCard umber. Un!ess you a10 an && 0: ,--,,, Yll L, there inwrd5+ /$ 2 $5 &zrgp per ordered.

Press 2 to open an account.


PokyFax accounts
fax numbers. save time by storing your credit card and Opening an account is free. An order form is must open

Please take a moment to complete the Instant Survey form that appears below. Fax it back to us at 708,/202-9799, or mail it to The Heartland Institute at 800 East Northwest Highway #I 080, Palatine, Illinois 60067. Many fhhanks!

sent to you by fax Elected officials and ]ournalists accounts to get free access to PolicyFax

Press 3 for free directories.


Choose 2 cmp!ete directory (abau? ? S pzges) or request subdirectory by using the following two-digit topic codes: 08 Budget 12 Civil Rights 13 Crime 19 Economic Development 20 Economy 21 Education 23 Environment 28 32 65 72 80 81 92 Government Health Care Privatization Regulation Taxes Transportation Welfare a

INSTANT SURVEY:
How would 0 Is this your Will you How you rate this document? 0 Good 0

Document

Excellent first use of PolicyFax? again?

Fair

P00r

q Yes
0 Yes improved? 0 NO

0 NO
0 Maybe

use fo/;cy&w you

would

like to see PolicyFax

Your

Name

[optional)

Part VII: Environment, Energy and Natural Resources W

UTILITY CONSTRUCTION REVIEW ACT

ALECs models Utility Construction Review Act is designed to ensure adequate and reliable electric power supply at the availability of a reasonable cost through reducing risks and uncertainties from the rate review process and encourage utilities to provide new capacity. Key components of the Act include: a provision for certificate review of electric power plants under construction and investment recovery under certain circumstances and a provision for construction progress reports.
Model Le@slation

Section 1. {Short Title.} This act shall be known and may be cited as the Utility Construction Review Act. Section 2. {Legislative findings and declarations.} The Legislature finds and declares that:

(A) An adequate and reliable electric power supply, available at a reasonable cost to the residents, commerce, and industry of the state is necessary to maintain both a healthy economic climate in the state and the general well-being of its residents; and (B) To better assure the required financing for those new electric generating facilities approved to meet increased demand, the procedure for regulatory review of construction costs must be equitable, predictable, and orderly. Section 3. (Definitions.} The following words and phrases when used in this act shall have the meanings given to them in this section unless the context clearly indicates otherwise: Certificate. The certificate of public convenience. and necessity (or insert the appropriate prior (A) authorization by the commission required for the utility to begin facility construction). W
CC)

Commission. The {insert appropriate statepublic

utility commission}.

Facility. An electric generation facility regulated by the commission. Any electric generating utility allowed by state law to cam a regulated return on its

Utility. 0 investment.

Section 4. {Certificate review and investment recovery.) (A) Commission review. When, in the opinion of the commission, changes in the estimate of probable future growth of the use of electricity so indicate, the commission shall commence a review of any certificate previously granted to determine whether the. public convenience and necessity continues to require the facility under construction. If the commission finds that completion of the facility under construction is no longer in the public interest, the commission may modify or revoke the certificate. (B) Investment recovery. If the public utility cancels construction of the facility as a result of the modification or revocation of the certificate, it may recover, over a reasonable period of time, through rates, absent fraud, concealment, or gross mismanagement, the amount of its investment in that facility, along with a reasonable return on the unamortized balance. Recovery may not be challenged on the basis of assumptions regarding probable future growth of the use of electricity. Section 5. (Construction progress reports.] (A) Reporting requirements. The commission shall, at the request of the public utility, maintain an ongoing review of facility construction as it proceeds. The applicant shall submit each year during construction, or at

Volume II: Sourcebook ofAmerican State Legislation I995

72

Part VII: Environment, Energy and Natural Re.wwces

such other periods as the Commission and the public utility mutually agree, a progress report and any revisions in the cost estimates for the construction. Prohibition of subsequent challenges. If the commission approves the consrmction and the cost of @) the portion of the facility under review, that approval forecloses subsequent challenges to the inclusion of that portion of the facility in the public utilitys rate base on the basis of excessive cost or inadequate quality control. Investment recovery. If the commission disapproves of all or part of the construction or cost of the 63 portion of the facility under review, the commission may modify or revoke the certificate. If the public utility cancels construction of the facility as a result of the modifications or revocation of the certificate, the facility may recover, over a reasonable period of time through rates, absent fraud, concealment, or gross mismanagement, the amount of its investment in the facility along with a reasonable return on the unamortized balance, to the extent the construction and the cost were approved previously by the commission. Section 6. (Severability clause.} Section 7. @epealer clause.} Section 8. wffeetive date.}

Volume II: Sourcebook of American State Legislation I995

73