Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Well Construction Equipment

Schlumberger Overseas S.A


Industrial Area, Doha
P.O Box 8746
Doha, Qatar
+974 4497 9373
www.cameron.slb.com

Certificate of Conformance-Addendum
Certificate Issuing Date: 07 Sep 2022 Sales Order Number: 6200257981

Customer Name: GDI, QATAR Work Order: FSO 7031077 (WCE 22021)
Recertification FSO 4925090 (DBL BOP)

Customer PO: IDPO 4513613279

This is an addendum to the Certificate of Conformance of New Manufacturing or Repair/Remanufacture of Drilling


Equipment listed below. The purpose of this addendum is to establish the date in which the customer takes
possession of the equipment and/or successfully complete a commissioning of a BOP stack. The recertification
period of the equipment starts from the date this Addendum is issued as described in EB902D (latest revision).
Please note this addendum does not affect the product’s warranty which is specified in the contract of sale. In the
case of a CoC Suspension, this Addendum denotes the length of time the equipment was in preservation and will
indicate the time when the next recommended inspection will be as described in EB902D.
Cameron a Schlumberger company certifies that the item(s) described herewith is (are) in conformance with the
requirements of the above Purchase Order Number and fully comply with applicable Cameron specifications in effect
at the date the Addendum is issued. All related documentation in support of the above statement is retained on file by
the company for a minimum of 10 years from date the Addendum is issued and can be made available to the
purchaser upon request.
Cameron a Schlumberger company through this media declares that, to the extent of its knowledge, the product(s)
listed below is/are Free from Asbestos when delivered from the Company, including any fittings, equipment, cables,
gaskets, glands, packings, brake lining, insulation.
Equipment
Item Rev OEM Serial Number or Heat
#
Part Number Description Qty Number Notes
# Number
(ERN)
01 2372867-131 01 ASSY 'U' BOP 13-5/8 10K DOUBLE 01 1130999350001 - -
CAVITY, W/ API BX-159 FLANGED TOP
AND BOTTOM, W/ FOUR 4-1/16 API 10K Upper LH Bonnet Assy:
BX-155 FLANGED OUTLETS, W/ NBA PN: 2113666-70-02 Rev.07
625 INLAY ON ALL RING GROOVES, W/ SN: 4925090-1
STD BONNETS ON UPPER CAVITY, Upper RH Bonnet Assy:
W/ LBS BONNETS AND TANDEM PN: 2113666-70-01 Rev.07
BOOSTER ON LOWER CAVITY, SN: 4925090-2
W/ MANUAL LOCKING SCREWS,
(W/ 4130 BODY MATERIAL AND QPQ LOWER LH Bonnet Assy:
BONNET COMPONENTS) PN: 2113667-70-02 Rev 10,
PER API 16A 3RD ED, T-20. SN: 4925090-3
LOWER RH Bonnet Assy:
PN: 2113667-70-01
SN: 4925090-4

Schlumberger-Private

CMEL -AD-Q-030 Rev 2


Well Construction Equipment
Schlumberger Overseas S.A
Industrial Area, Doha
P.O Box 8746
Doha, Qatar
+974 4497 9373
www.cameron.slb.com

Certificate of Conformance-Addendum
Additional Endorsements Endorsement Report Notes on Scope of Addendum
(if applicable) Number/License Number (if
applicable)
- -
1. Recertification date: 14-Mar-2022
- -
2. Delivery Date: 07-Sep-2022
Is this a CoC Suspension?
No  Yes  (If yes, please specify which EB procedure was applied 3. Preservation Period (If Applicable):
and COC freeze as per SP-1060-32).
1) BOP Assembly was re-certified in Mar –
2022 and long-term preservation was
done until Aug-2022

2) As per Cameron EB-902D


recommended seal change frequency is
every 30 months intervals.

3) This CoC Addendum is valid for 5 years


from the date of issue.

All documents and inspection reports to support this certificate of conformance have been verified to the
best of my knowledge to be true and correct

Anash Ahamed 07-Sep-2022

FIRST NAME, MIDDLE INITIAL, LAST HANDWRITTEN SIGNATURE QUALITY STAMP (If applicable) Date signed
NAME (MM/DD/YYYY)

Schlumberger-Private

CMEL -AD-Q-030 Rev 2

You might also like