Work Order

Priority: BIOMEDICAL DEPARTMENT PM


Assigned To: NAF ACT #: 96713

Status: Closed Sch. Start Date: 17-04-2022

Asset Tag No: 101290 STD Time: 6


XA04030001
Asset:
Fluoroscopy system,Siemens
Frequency: XA0403BMH

Location:

Area:

Manual No: Serial No : 3448


Date
PM Due Date: Apr 17, 2022 12:00:00 AM Apr 20, 2022 5:00:00 PM
Completed:
Planning Engr.: User Signature:
DUP: STD. Travel Time:
PPM of the fluoroscopy system performed according to the work instruction in the following steps as below.
Generally cleaned the system with soft cloth and blower
checked the table movements
checked the display
Instructions: checked the power system of the system
checked KVa and Ms of the machine
checked the machines with all parameters
finally the system was found in normal working condition.
And the system was handed over to end user.

Procedure(s)
No Data Available

Pending Reason(s)

Date Stock Material Local Material Access Time Short Staff Short Help Other

Labour

Tradesman Type Date Time Start Time End Travel Time Other Time

Fault Codes

1 = Normal Breakdown 2 = User Error 3 = Power Failure 4 = Accessory Failure


Entered By: MAISAM.MEERI Entered On: 14-04-2022 17:04

Description Of Work Performed :

Engineers Comments:

Fault Code:
Tradesman: Engineer:

Last PPM: W.O No.: 96713 Completion Date: Apr 20 2022 5:00PM
Next PPM:

Oct/05/2022 03:43:14 PM Facilities Management Division -FMIC 1