FPSTGP-11-CI-01-PP-001 Plot Plan For MB-04 (Equipment Foundation Layout) (Rev.B)
FPSTGP-11-CI-01-PP-001 Plot Plan For MB-04 (Equipment Foundation Layout) (Rev.B)
FPSTGP-11-CI-01-PP-001 Plot Plan For MB-04 (Equipment Foundation Layout) (Rev.B)
G
F
F
E
E
PLOT PLAN FOR MB-04
(EQUIPMENT FOUNDATION LAYOUT)
D
D
C
C
B
B
NOTES: PT. PERTAMINA EP REGION 2 ZONA 7 APPROVED OWNER: JOB NO :
OPERATION SURFACE FACILITIES PROJECT :
HSSE OPR PEMBANGUNAN FIRE PROTECTION SYSTEM (FPS) DI
CHECKED APPROVED PERTAMINA EP MB-04 DAN GAS GATHERING STATION TEGAL PACING
Engineering Construction QAQC & Fac. Integrity Manager FIELD TAMBUN
REVISION
TITLE :
A
A
CONTRACTOR: COVER SHEET
ISSUED FOR APPROVAL TS UMM RRM PLOT PLAN FOR MB-04
B 14/06/2022 Date: Date: Date: Date: Date: (EQUIPMENT FOUNDATION LAYOUT)
PT. RAMAI JAYA ABADI
NO. DOCUMENT NO. TITLE A 07/06/2022 ISSUED FOR REVIEW TS UMM RRM APPROVED APPROVED AS NOTED
GENERAL SUPLIER & CONTRACTOR
AN
BAT
JEM
KONDENSAT KONDENSAT
STORAGE
WATER
TOWER
WATER
TANK
OFFICE
STORAGE
SEPARATOR TANK
SUNGAI
STORAGE CITARUM
G
G
TOWER HEADER
MANIFOLD
ACCESS TO
TANK LOCATION
STORAGE
SEPARATOR TANK BALONG
FLARE
BALONG
BALONG
F
F
HEADER
MANIFOLD
E
E
AREA SUMUR AREA SUMUR
(MB-09, MB-10, MB-11)
D
D
(MB-07, MB-08)
C
C
B
B
FLARE
BALONG
BALONG
NOTES: PT. PERTAMINA EP REGION 2 ZONA 7 APPROVED OWNER: JOB NO :
OPERATION SURFACE FACILITIES PROJECT :
HSSE OPR PEMBANGUNAN FIRE PROTECTION SYSTEM (FPS) DI
CHECKED APPROVED PERTAMINA EP MB-04 DAN GAS GATHERING STATION TEGAL PACING
FOUNDATION DETAIL FOR HYDRANT BOX,
3 FPSTGP-11-CI-01-GA-005 FIRE HYDRANT, FIRE MONITOR & PIPE Engineering Construction QAQC & Fac. Integrity Manager FIELD TAMBUN
REVISION
SUPPORT
STRUCTURAL PLAN & DETAIL FOR
2 FPSTGP-11-CI-01-GA-002 TITLE :
A
A
WATERPOND MB-04
CONTRACTOR: PLOT PLAN FOR MB-04
FOUNDATION PLAN AND DETAIL FOR
1 FPSTGP-11-CI-01-GA-001 WATERPOND MB-04 B 14/06/2022 ISSUED FOR APPROVAL TS UMM RRM Date: Date: Date: Date: Date: (EQUIPMENT FOUNDATION LAYOUT)
PT. RAMAI JAYA ABADI
NO. DOCUMENT NO. TITLE A 07/06/2022 ISSUED FOR REVIEW TS UMM RRM APPROVED APPROVED AS NOTED
GENERAL SUPLIER & CONTRACTOR
KONDENSAT
WATER
STORAGE
TOWER
TANK
OFFICE
STORAGE
SEPARATOR TANK
HEADER
MANIFOLD
G
G
AREA SUMUR AREA SUMUR
(MB-07, MB-08) (MB-09, MB-10, MB-11)
FLARE
BALONG
BALONG BALONG
F
F
E
E
D
D
C
C
B
B
NOTES: PT. PERTAMINA EP REGION 2 ZONA 7 APPROVED OWNER: JOB NO :
OPERATION SURFACE FACILITIES PROJECT :
HSSE OPR PEMBANGUNAN FIRE PROTECTION SYSTEM (FPS) DI
CHECKED APPROVED PERTAMINA EP MB-04 DAN GAS GATHERING STATION TEGAL PACING
FOUNDATION DETAIL FOR HYDRANT BOX,
3 FPSTGP-11-CI-01-GA-005 FIRE HYDRANT, FIRE MONITOR & PIPE Engineering Construction QAQC & Fac. Integrity Manager FIELD TAMBUN
REVISION
SUPPORT
STRUCTURAL PLAN & DETAIL FOR
2 FPSTGP-11-CI-01-GA-002 TITLE :
A
A
WATERPOND MB-04
CONTRACTOR: PLOT PLAN FOR MB-04
FOUNDATION PLAN AND DETAIL FOR
1 FPSTGP-11-CI-01-GA-001 WATERPOND MB-04 B 14/06/2022 ISSUED FOR APPROVAL TS UMM RRM Date: Date: Date: Date: Date: (EQUIPMENT FOUNDATION LAYOUT)
PT. RAMAI JAYA ABADI
NO. DOCUMENT NO. TITLE A 07/06/2022 ISSUED FOR REVIEW TS UMM RRM APPROVED APPROVED AS NOTED
GENERAL SUPLIER & CONTRACTOR
KONDENSAT
WATER
STORAGE
TOWER
TANK
OFFICE
STORAGE
SEPARATOR TANK
HEADER
MANIFOLD
G
G
AREA SUMUR AREA SUMUR
(MB-07, MB-08) (MB-09, MB-10, MB-11)
FLARE
BALONG
BALONG BALONG
F
F
E
E
D
D
AREA SUMUR
(MB-09, MB-10, MB-11)
C
C
B
B
NOTES: PT. PERTAMINA EP REGION 2 ZONA 7 APPROVED OWNER: JOB NO :
OPERATION SURFACE FACILITIES PROJECT :
HSSE OPR PEMBANGUNAN FIRE PROTECTION SYSTEM (FPS) DI
CHECKED APPROVED PERTAMINA EP MB-04 DAN GAS GATHERING STATION TEGAL PACING
FOUNDATION DETAIL FOR HYDRANT BOX,
3 FPSTGP-11-CI-01-GA-005 FIRE HYDRANT, FIRE MONITOR & PIPE Engineering Construction QAQC & Fac. Integrity Manager FIELD TAMBUN
REVISION
SUPPORT
STRUCTURAL PLAN & DETAIL FOR
2 FPSTGP-11-CI-01-GA-002 TITLE :
A
A
WATERPOND MB-04
CONTRACTOR: PLOT PLAN FOR MB-04
FOUNDATION PLAN AND DETAIL FOR
1 FPSTGP-11-CI-01-GA-001 WATERPOND MB-04 B 14/06/2022 ISSUED FOR APPROVAL TS UMM RRM Date: Date: Date: Date: Date: (EQUIPMENT FOUNDATION LAYOUT)
PT. RAMAI JAYA ABADI
NO. DOCUMENT NO. TITLE A 07/06/2022 ISSUED FOR REVIEW TS UMM RRM APPROVED APPROVED AS NOTED
GENERAL SUPLIER & CONTRACTOR
KONDENSAT
WATER
STORAGE
TOWER
TANK
OFFICE
STORAGE
SEPARATOR TANK
HEADER
MANIFOLD
G
G
AREA SUMUR AREA SUMUR
(MB-07, MB-08) (MB-09, MB-10, MB-11)
FLARE
BALONG
BALONG BALONG
KONDENSAT
WATER
STORAGE
TOWER
F
F
TANK
OFFICE
STORAGE
TANK
E
E
D
D
C
C
B
B
NOTES: PT. PERTAMINA EP REGION 2 ZONA 7 APPROVED OWNER: JOB NO :
OPERATION SURFACE FACILITIES PROJECT :
HSSE OPR PEMBANGUNAN FIRE PROTECTION SYSTEM (FPS) DI
CHECKED APPROVED PERTAMINA EP MB-04 DAN GAS GATHERING STATION TEGAL PACING
FOUNDATION DETAIL FOR HYDRANT BOX,
3 FPSTGP-11-CI-01-GA-005 FIRE HYDRANT, FIRE MONITOR & PIPE Engineering Construction QAQC & Fac. Integrity Manager FIELD TAMBUN
REVISION
SUPPORT
STRUCTURAL PLAN & DETAIL FOR
2 FPSTGP-11-CI-01-GA-002 TITLE :
A
A
WATERPOND MB-04
CONTRACTOR: PLOT PLAN FOR MB-04
FOUNDATION PLAN AND DETAIL FOR
1 FPSTGP-11-CI-01-GA-001 WATERPOND MB-04 B 14/06/2022 ISSUED FOR APPROVAL TS UMM RRM Date: Date: Date: Date: Date: (EQUIPMENT FOUNDATION LAYOUT)
PT. RAMAI JAYA ABADI
NO. DOCUMENT NO. TITLE A 07/06/2022 ISSUED FOR REVIEW TS UMM RRM APPROVED APPROVED AS NOTED
GENERAL SUPLIER & CONTRACTOR
SEPARATOR STORAGE
KONDENSAT
STORAGE
TANK
OFFICE
WATER
TOWER
SEPARATOR TANK
HEADER
MANIFOLD
G
G
AREA SUMUR AREA SUMUR
(MB-07, MB-08) (MB-09, MB-10, MB-11)
FLARE
BALONG
BALONG BALONG
HEADER
F
F
MANIFOLD
E
E
D
D
C
C
B
B
NOTES: PT. PERTAMINA EP REGION 2 ZONA 7 APPROVED OWNER: JOB NO :
OPERATION SURFACE FACILITIES PROJECT :
HSSE OPR PEMBANGUNAN FIRE PROTECTION SYSTEM (FPS) DI
CHECKED APPROVED PERTAMINA EP MB-04 DAN GAS GATHERING STATION TEGAL PACING
FOUNDATION DETAIL FOR HYDRANT BOX,
3 FPSTGP-11-CI-01-GA-005 FIRE HYDRANT, FIRE MONITOR & PIPE Engineering Construction QAQC & Fac. Integrity Manager FIELD TAMBUN
REVISION
SUPPORT
STRUCTURAL PLAN & DETAIL FOR
2 FPSTGP-11-CI-01-GA-002 TITLE :
A
A
WATERPOND MB-04
CONTRACTOR: PLOT PLAN FOR MB-04
FOUNDATION PLAN AND DETAIL FOR
1 FPSTGP-11-CI-01-GA-001 WATERPOND MB-04 B 14/06/2022 ISSUED FOR APPROVAL TS UMM RRM Date: Date: Date: Date: Date: (EQUIPMENT FOUNDATION LAYOUT)
PT. RAMAI JAYA ABADI
NO. DOCUMENT NO. TITLE A 07/06/2022 ISSUED FOR REVIEW TS UMM RRM APPROVED APPROVED AS NOTED
GENERAL SUPLIER & CONTRACTOR
KONDENSAT
WATER
STORAGE
TOWER
TANK
OFFICE
STORAGE
SEPARATOR TANK
HEADER
MANIFOLD
G
G
AREA SUMUR AREA SUMUR
(MB-07, MB-08) (MB-09, MB-10, MB-11)
FLARE
BALONG
BALONG BALONG
F
F
E
E
D
D
C
C
B
B
NOTES: PT. PERTAMINA EP REGION 2 ZONA 7 APPROVED OWNER: JOB NO :
OPERATION SURFACE FACILITIES PROJECT :
HSSE OPR PEMBANGUNAN FIRE PROTECTION SYSTEM (FPS) DI
CHECKED APPROVED PERTAMINA EP MB-04 DAN GAS GATHERING STATION TEGAL PACING
FOUNDATION DETAIL FOR HYDRANT BOX,
3 FPSTGP-11-CI-01-GA-005 FIRE HYDRANT, FIRE MONITOR & PIPE Engineering Construction QAQC & Fac. Integrity Manager FIELD TAMBUN
REVISION
SUPPORT
STRUCTURAL PLAN & DETAIL FOR
2 FPSTGP-11-CI-01-GA-002 TITLE :
A
A
WATERPOND MB-04
CONTRACTOR: PLOT PLAN FOR MB-04
FOUNDATION PLAN AND DETAIL FOR
1 FPSTGP-11-CI-01-GA-001 WATERPOND MB-04 B 14/06/2022 ISSUED FOR APPROVAL TS UMM RRM Date: Date: Date: Date: Date: (EQUIPMENT FOUNDATION LAYOUT)
PT. RAMAI JAYA ABADI
NO. DOCUMENT NO. TITLE A 07/06/2022 ISSUED FOR REVIEW TS UMM RRM APPROVED APPROVED AS NOTED
GENERAL SUPLIER & CONTRACTOR