NOTES :

DRAWING LIST - STEEL STRUCTURE


KUNINGAN STATION
ACCESS BRIDGE #2

EMPLOYER
MINISTRY OF TRANSPORTATION
DIRECTORATE GENERAL OF RAILWAYS
DIRECTORATE OF RAILWAY INFRASTRUCTURE

Karya Building 11th Floor


Medan Merdeka Barat Street No.8, Jakarta 10110
NOTICED BY

NAME POSITION DATE SIGNATURE

P.P.K.
FERDIAN SURYO A.P PEMBANGUNAN
NIP. 19800215 200712 1 002 PRASARANA
LRT JABODEBEK

MANAGEMENT CONSULTANT

ENDORSED BY

NAME POSITION DATE SIGNATURE

PROJECT
R. MANAI
MANAGER
DEPUTY
A. RAHMAT PROJECT
MANAGER

APPROVED BY

CONSTRUCTION
J. SARRE
MANAGER

YOSHIRO MIKI Station Expert


Steel Structure
LEE KUANG JIE
Expert

TERUYUKI MORITA Super Structure


Expert
GRAHAM S. HARRINGTON Civil Expert

K. M. SEMBIRING
ENGINEER
BURHANNUDIN ABDUL

CONTRACTOR DESIGN & BUILD

PT. ADHI KARYA (Persero) Tbk.


RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA

3B 26-11-2021 ADJUSTMENT DED DRAWING

3A 08-09-2021 APPROVAL DRAWING

REV DATE DESCRIPTION

ENDORSED BY

NAME POSITION DATE SIGNATURE

PROJECT
ARDIANSYAH ASIZ 29-11-2021
MANAGER

CHECKED BY
PROJECT
HENDRYAN ENGINEERING 29-11-2021
MANAGER
DRAWN BY

ARRAZQA DION FADILLAH DRAFTER 26-11-2021

PROJECT

INTEGRATED LIGHT RAIL TRANSIT/LRT


TRAIN DEVELOPMENT IN JABODEBEK
CROSS SERVICES 02 CAWANG - DUKUH ATAS

DED REFERENCE NUMBER

SHOP DRAWING STEEL STRUCTURE


DRAWING TITLE

KUNINGAN STATION
CHECKED BY
ACCESS BRIDGE #2
PT. ARKONIN PT. ADHI KARYA
DRAWING LIST
FIELD SIGN DATE FIELD SIGN DATE

PROJECT MANAGER 27-11-2021 MANAGER ENG 27-11-2021 SCALE SIZE DISCIPLINE REVISION NO.

ARSITEKTUR ENG 27-11-2021 ARSITEKTUR ENG 27-11-2021 NTS A2 STRUCTURE 3B

STRUKTUR ENG 27-11-2021 STRUKTUR ENG 27-11-2021 DRAWING NUMBER DATE

MEP ENG 27-11-2021 MEP ENG 27-11-2021 LRT-CV-ST-DW-L2-STKN-JPO-000 26-11-2021


NOTES :

EMPLOYER
MINISTRY OF TRANSPORTATION
DIRECTORATE GENERAL OF RAILWAYS
BAUT DIRECTORATE OF RAILWAY INFRASTRUCTURE

RING

s
Karya Building 11th Floor

> 5 mm
RING (TIPE NORMAL) Medan Merdeka Barat Street No.8, Jakarta 10110
NOTICED BY
MUR
NAME POSITION DATE SIGNATURE

P.P.K.
FERDIAN SURYO A.P PEMBANGUNAN
NIP. 19800215 200712 1 002 PRASARANA
BAUT
LRT JABODEBEK

RING (MUTU TINGGI)

S
MANAGEMENT CONSULTANT

S
t
S

> 5 mm
RING (MUTU TINGGI)

MUR
ENDORSED BY

NAME POSITION DATE SIGNATURE

PROJECT
R. MANAI
MANAGER

s
GARIS BAUT GARIS BAUT DEPUTY
A. RAHMAT PROJECT
GARIS BAUT MANAGER
g1

APPROVED BY

A
GARIS BAUT
g2

CONSTRUCTION
J. SARRE
g2 g1 g2 g1 g1 g1
MANAGER
g2
YOSHIRO MIKI Station Expert
Steel Structure
LEE KUANG JIE
Expert

TERUYUKI MORITA Super Structure


Expert
GRAHAM S. HARRINGTON Civil Expert

K. M. SEMBIRING
ENGINEER
BURHANNUDIN ABDUL

CONTRACTOR DESIGN & BUILD

PT. ADHI KARYA (Persero) Tbk.


RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA

30 mm BACKING STRIP MUR KEDUA


PLATE 4.5 mm
MUR PERTAMA PLAT DASAR

>
GUSSET PLATE RING
BETON
GAUGE
LINE Dh BETON BERTULANG

3B 26-11-2021 ADJUSTMENT DED DRAWING

3A 08-09-2021 APPROVAL DRAWING

REV DATE DESCRIPTION

ENDORSED BY

NAME POSITION DATE SIGNATURE

BAUT ANGKUR PROJECT


ARDIANSYAH ASIZ 29-11-2021
GUSSET PLATE MANAGER
30 mm

GAUGE BACKING STRIP


PLATE 4.5 mm
CHECKED BY
LINE
PROJECT
HENDRYAN ENGINEERING 29-11-2021
d MANAGER
DRAWN BY

ARRAZQA DION FADILLAH DRAFTER 26-11-2021

PROJECT

GUSSET PLATE INTEGRATED LIGHT RAIL TRANSIT/LRT


GAUGE
TRAIN DEVELOPMENT IN JABODEBEK
LINE
CROSS SERVICES 02 CAWANG - DUKUH ATAS

d : DIAMETER BAUT ANGKUR ( mm )


Dh: DIAMETER LOBANG BAUT ANGKUR < d+2mm DED REFERENCE NUMBER
D : DIAMETER BENGKOKKAN > 3d ( mm )
L : PANJANG BAUT ANGKUR > 35d ( mm )
SHOP DRAWING STEEL STRUCTURE
DRAWING TITLE

KUNINGAN STATION
CHECKED BY
ACCESS BRIDGE #2
PT. ARKONIN PT. ADHI KARYA DRAWING STANDARD
FIELD SIGN DATE FIELD SIGN DATE

PROJECT MANAGER 27-11-2021 MANAGER ENG 27-11-2021 SCALE SIZE DISCIPLINE REVISION NO.

ARSITEKTUR ENG 27-11-2021 ARSITEKTUR ENG 27-11-2021 NTS A2 STRUCTURE 3B

STRUKTUR ENG 27-11-2021 STRUKTUR ENG 27-11-2021 DRAWING NUMBER DATE

MEP ENG 27-11-2021 MEP ENG 27-11-2021 LRT-CV-ST-DW-L2-STKN-JPO-C2-001 26-11-2021


NOTES :

EMPLOYER
MINISTRY OF TRANSPORTATION
DIRECTORATE GENERAL OF RAILWAYS
DIRECTORATE OF RAILWAY INFRASTRUCTURE

A1
B
BB6 A2 KUNINGAN STATION
ACCESS BRIDGE #3
Karya Building 11th Floor
Medan Merdeka Barat Street No.8, Jakarta 10110
A3 A4 NOTICED BY

NAME POSITION DATE SIGNATURE

P.P.K.

BB5 A5 FERDIAN SURYO A.P


NIP. 19800215 200712 1 002
PEMBANGUNAN
PRASARANA

A6 LRT JABODEBEK

B P250 MANAGEMENT CONSULTANT


BB4
A7
A8
ENDORSED BY
BB3 NAME POSITION DATE SIGNATURE

BB2 R. MANAI
PROJECT
MANAGER
DEPUTY

BB1 A. RAHMAT PROJECT


MANAGER

APPROVED BY

CONSTRUCTION
J. SARRE
MANAGER

YOSHIRO MIKI Station Expert


Steel Structure
LEE KUANG JIE
Expert

TERUYUKI MORITA Super Structure


Expert
GRAHAM S. HARRINGTON Civil Expert

K. M. SEMBIRING
ENGINEER
BURHANNUDIN ABDUL

CONTRACTOR DESIGN & BUILD

PT. ADHI KARYA (Persero) Tbk.


RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA

REV DATE DESCRIPTION

ENDORSED BY
KUNINGAN STATION NAME POSITION DATE SIGNATURE

ACCESS BRIDGE #2 I PUTU INDRA PRABAWA PROJECT


29-11-2021
MANAGER

CHECKED BY
PROJECT
HENDRYAN ENGINEERING 29-11-2021
MANAGER
DRAWN BY

ARRAZQA DION FADILLAH DRAFTER 26-11-2021

PROJECT

3D VIEW ISOMETRIC INTEGRATED LIGHT RAIL TRANSIT/LRT


1 KUNINGAN STATION ACCESS BRIDGE #2 TRAIN DEVELOPMENT IN JABODEBEK
SKALA CROSS SERVICES 02 CAWANG - DUKUH ATAS

DED REFERENCE NUMBER

KUNINGAN STATION

3D
ACCESS
VIEW ISOMETRIC
BRIDGE #3
SHOP DRAWING STEEL STRUCTURE
DRAWING TITLE

KUNINGAN STATION
CHECKED BY
ACCESS BRIDGE #2
PT. ARKONIN PT. ADHI KARYA
3D VIEW ISOMETRIC
FIELD SIGN DATE FIELD SIGN DATE

PROJECT MANAGER 27-11-2021 MANAGER ENG 27-11-2021 SCALE SIZE DISCIPLINE REVISION NO.

ARSITEKTUR ENG 27-11-2021 ARSITEKTUR ENG 27-11-2021 N.T.S A2 STRUCTURE 3B

ELEVATION REFERENCE : STRUKTUR ENG 27-11-2021 STRUKTUR ENG 27-11-2021 DRAWING NUMBER DATE
STATION CONCURSE LEVEL = ACCES BRIDGE LEVEL
= FFL ±0.000 = EL +24.418 (FROM KUNINGAN BENCHMARKS) MEP ENG 27-11-2021 MEP ENG 27-11-2021 LRT-CV-ST-DW-L2-STKN-JPO-C2-002 26-11-2021
NOTES :

EMPLOYER
BB5 MINISTRY OF TRANSPORTATION
DIRECTORATE GENERAL OF RAILWAYS
DIRECTORATE OF RAILWAY INFRASTRUCTURE
B

PD2
BB4 004

Karya Building 11th Floor


Medan Merdeka Barat Street No.8, Jakarta 10110
NOTICED BY

NAME POSITION DATE SIGNATURE

P.P.K.
FERDIAN SURYO A.P PEMBANGUNAN
NIP. 19800215 200712 1 002 PRASARANA
LRT JABODEBEK

MANAGEMENT CONSULTANT

ENDORSED BY

NAME POSITION DATE SIGNATURE

PROJECT
R. MANAI
MANAGER
DEPUTY
A. RAHMAT PROJECT
MANAGER

APPROVED BY

CONSTRUCTION
J. SARRE
MANAGER

PD1 YOSHIRO MIKI Station Expert

004 LEE KUANG JIE


Steel Structure
PS1 PS1 PS1 P2B Expert
004 004 004 004 TERUYUKI MORITA Super Structure
Expert
PD4 PD3 GRAHAM S. HARRINGTON Civil Expert
004 004 K. M. SEMBIRING
ENGINEER
BURHANNUDIN ABDUL

CONTRACTOR DESIGN & BUILD

BB3

BB2
PT. ADHI KARYA (Persero) Tbk.
RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA
BB1

PD3
PS1 PS1 PS1
P2B 004 A5' 3B 26-11-2021 ADJUSTMENT DED DRAWING
004 004 004
004 3A 08-09-2021 APPROVAL DRAWING
BASE PLATE & ANCHOR PLAN A1 A2 A3 A4 A5 A6 P250 A7 A8
1 KUNINGAN STATION ACCESS BRIDGE #2 REV DATE DESCRIPTION
SKALA
ENDORSED BY
1 NAME POSITION DATE SIGNATURE

PROJECT
ARDIANSYAH ASIZ 29-11-2021
MANAGER

CHECKED BY
PROJECT
HENDRYAN ENGINEERING 29-11-2021
MANAGER
DRAWN BY

ARRAZQA DION FADILLAH DRAFTER 26-11-2021

PROJECT

INTEGRATED LIGHT RAIL TRANSIT/LRT


TRAIN DEVELOPMENT IN JABODEBEK
CROSS SERVICES 02 CAWANG - DUKUH ATAS

DED REFERENCE NUMBER

SHOP DRAWING STEEL STRUCTURE


DRAWING TITLE

KUNINGAN STATION
CHECKED BY ACCESS BRIDGE #2
PT. ARKONIN PT. ADHI KARYA BASE PLATE AND ANCHOR PLAN
FIELD SIGN DATE FIELD SIGN DATE

PROJECT MANAGER 27-11-2021 MANAGER ENG 27-11-2021 SCALE SIZE DISCIPLINE REVISION NO.

ARSITEKTUR ENG 27-11-2021 ARSITEKTUR ENG 27-11-2021 1 : 150 A2 STRUCTURE 3B

ELEVATION REFERENCE : STRUKTUR ENG 27-11-2021 STRUKTUR ENG 27-11-2021 DRAWING NUMBER DATE
STATION CONCURSE LEVEL = ACCES BRIDGE LEVEL
= FFL ±0.000 = EL +24.418 (FROM KUNGINGAN BENCHMARKS) MEP ENG 27-11-2021 MEP ENG 27-11-2021 LRT-CV-ST-DW-L2-STKN-JPO-C2-003 26-11-2021
NOTES :

EMPLOYER
MINISTRY OF TRANSPORTATION
DIRECTORATE GENERAL OF RAILWAYS
DIRECTORATE OF RAILWAY INFRASTRUCTURE

Karya Building 11th Floor

PD3 DETAIL BASE PLATE KP2 (PD3) PD4 DETAIL BASE PLATE KP3 (PD4) Medan Merdeka Barat Street No.8, Jakarta 10110
NOTICED BY
SCALE
PD2 DETAIL BASE PLATE KP1 (PD2) SCALE NAME POSITION DATE SIGNATURE

PD1 DETAIL BASE PLATE KP1 (PD1) SCALE


SCALE P.P.K.
FERDIAN SURYO A.P PEMBANGUNAN
NIP. 19800215 200712 1 002 PRASARANA
LRT JABODEBEK

MANAGEMENT CONSULTANT

ENDORSED BY

NAME POSITION DATE SIGNATURE

PROJECT
R. MANAI
MANAGER
DEPUTY
A. RAHMAT PROJECT
MANAGER

APPROVED BY

CONSTRUCTION
J. SARRE
MANAGER

YOSHIRO MIKI Station Expert


Steel Structure
LEE KUANG JIE
Expert

TERUYUKI MORITA Super Structure


Expert
GRAHAM S. HARRINGTON Civil Expert

PD1 SECTION 4, BASE PLATE KP1 (PD1) PD2 SECTION 3, BASE PLATE KP1 (PD2) PD3 SECTION 2, BASE PLATE KP2 (PD3) PD4 SECTION 1, BASE PLATE KP3 (PD4) K. M. SEMBIRING
SCALE ENGINEER
SCALE SCALE SCALE BURHANNUDIN ABDUL

CONTRACTOR DESIGN & BUILD

PT. ADHI KARYA (Persero) Tbk.


RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA

3B 26-11-2021 ADJUSTMENT DED DRAWING

3A 08-09-2021 APPROVAL DRAWING

REV DATE DESCRIPTION

M35 DETAIL ANCHOR M-35 (PD1, PD2, & PD3) M25 DETAIL ANCHOR M-25 (PD4) ENDORSED BY

NAME POSITION DATE SIGNATURE


SCALE SCALE

I PUTU INDRA PRABAWA PROJECT


29-11-2021
P2B DETAIL - 01 (P2B)
MANAGER

CHECKED BY
SCALE
PS1 DETAIL - PS1 PROJECT
HENDRYAN ENGINEERING 29-11-2021
SCALE MANAGER
DRAWN BY

ARRAZQA DION FADILLAH DRAFTER 26-11-2021

PROJECT

INTEGRATED LIGHT RAIL TRANSIT/LRT


TRAIN DEVELOPMENT IN JABODEBEK
CROSS SERVICES 02 CAWANG - DUKUH ATAS

DED REFERENCE NUMBER

SHOP DRAWING STEEL STRUCTURE


DRAWING TITLE

M25 DETAIL ANCHOR M-25 (BP.LIFT) KUNINGAN STATION


M25 DETAIL ANCHOR M-25 (PS1) M30 DETAIL ANCHOR M-30 (P2B) SCALE CHECKED BY
P2B POTONGAN - 01 (P2B) SCALE SCALE
ACCESS BRIDGE #2
SCALE
PT. ARKONIN PT. ADHI KARYA DETAIL BASE PLATE & ANCHOR PLAN
PS1 SECTION - PS1 FIELD SIGN DATE FIELD SIGN DATE
SCALE
PROJECT MANAGER 27-11-2021 MANAGER ENG 27-11-2021 SCALE SIZE DISCIPLINE REVISION NO.
FOR REFERENCE ONLY ARSITEKTUR ENG 27-11-2021 ARSITEKTUR ENG 27-11-2021 1:10 & 1:20 A2 STRUCTURE 3B

ELEVATION REFERENCE : STRUKTUR ENG 27-11-2021 STRUKTUR ENG 27-11-2021 DRAWING NUMBER DATE
STATION CONCURSE LEVEL = ACCES BRIDGE LEVEL
= FFL ±0.000 = EL +24.418 (FROM KUNINGAN BENCHMARKS) MEP ENG 27-11-2021 MEP ENG 27-11-2021 LRT-CV-ST-DW-L2-STKN-JPO-C2-004 26-11-2021
NOTES :

PRTL3
008

0000
XXX

CLEARANCE
EMPLOYER

06 06 MINISTRY OF TRANSPORTATION
BB5 DIRECTORATE GENERAL OF RAILWAYS
DIRECTORATE OF RAILWAY INFRASTRUCTURE

B 0000
XXX

0000
XXX
BB4
Karya Building 11th Floor
Medan Merdeka Barat Street No.8, Jakarta 10110
NOTICED BY

NAME POSITION DATE SIGNATURE

P.P.K.
FERDIAN SURYO A.P PEMBANGUNAN
NIP. 19800215 200712 1 002 PRASARANA
0000 LRT JABODEBEK
XXX
SP

0000 MANAGEMENT CONSULTANT


07 07 XXX

ENDORSED BY

NAME POSITION DATE SIGNATURE

DC PROJECT
R. MANAI
005 MANAGER
DEPUTY
A. RAHMAT PROJECT
MANAGER

APPROVED BY

CONSTRUCTION
J. SARRE
MANAGER

PRTL1 PRTL2 YOSHIRO MIKI Station Expert


007 04 05 008 Steel Structure
02 01 LEE KUANG JIE
Expert
01 TERUYUKI MORITA Super Structure
Expert
GRAHAM S. HARRINGTON Civil Expert

K. M. SEMBIRING
ENGINEER
02 BURHANNUDIN ABDUL

CONTRACTOR DESIGN & BUILD

BB3

BB2
PT. ADHI KARYA (Persero) Tbk.
RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA

BB1

3B 26-11-2021 ADJUSTMENT DED DRAWING

3A 08-09-2021 APPROVAL DRAWING

A1 A2 A3 A4 A5 A6 P250 A7 A8 REV DATE DESCRIPTION

ENDORSED BY
CONCOURSE LEVEL PLAN POSITION DATE SIGNATURE
1 KUNINGAN STATION ACCESS BRIDGE #2 04 A5' 03
1 05
NAME

SKALA PROJECT
ARDIANSYAH ASIZ 29-11-2021
MANAGER

CHECKED BY
PROJECT
HENDRYAN ENGINEERING 29-11-2021
MANAGER
DRAWN BY

ARRAZQA DION FADILLAH DRAFTER 26-11-2021

PROJECT

INTEGRATED LIGHT RAIL TRANSIT/LRT


TRAIN DEVELOPMENT IN JABODEBEK
CROSS SERVICES 02 CAWANG - DUKUH ATAS

DED REFERENCE NUMBER

SHOP DRAWING STEEL STRUCTURE


DRAWING TITLE

KUNINGAN STATION
CHECKED BY
ACCESS BRIDGE #2
DC DETAIL CHAMBER PT. ARKONIN PT. ADHI KARYA
CONCOURSE LEVEL PLAN
SKALA FIELD SIGN DATE FIELD SIGN DATE

PROJECT MANAGER 27-11-2021 MANAGER ENG 27-11-2021 SCALE SIZE DISCIPLINE REVISION NO.

ARSITEKTUR ENG 27-11-2021 ARSITEKTUR ENG 27-11-2021 1 : 150 A2 STRUCTURE 3B

ELEVATION REFERENCE : STRUKTUR ENG 27-11-2021 STRUKTUR ENG 27-11-2021 DRAWING NUMBER DATE
STATION CONCURSE LEVEL = ACCES BRIDGE LEVEL
= FFL ±0.000 = EL +24.418 (FROM KUNGINGAN BENCHMARKS) MEP ENG 27-11-2021 MEP ENG 27-11-2021 LRT-CV-ST-DW-L2-STKN-JPO-C2-005 26-11-2021
NOTES :

PRTL3
008

CLEARANCE
EMPLOYER

06 06 MINISTRY OF TRANSPORTATION
BB5 DIRECTORATE GENERAL OF RAILWAYS
DIRECTORATE OF RAILWAY INFRASTRUCTURE

BB4
Karya Building 11th Floor
Medan Merdeka Barat Street No.8, Jakarta 10110
NOTICED BY

NAME POSITION DATE SIGNATURE

P.P.K.
FERDIAN SURYO A.P PEMBANGUNAN
NIP. 19800215 200712 1 002 PRASARANA
LRT JABODEBEK

MANAGEMENT CONSULTANT
07 07

ENDORSED BY

NAME POSITION DATE SIGNATURE

PROJECT
R. MANAI
MANAGER
DEPUTY
A. RAHMAT PROJECT
MANAGER

APPROVED BY

CONSTRUCTION
J. SARRE
PRTL1 PRTL2 MANAGER

007 008 YOSHIRO MIKI Station Expert


Steel Structure
01 04 02 01 05 LEE KUANG JIE
Expert

TERUYUKI MORITA Super Structure


Expert
GRAHAM S. HARRINGTON Civil Expert

K. M. SEMBIRING
ENGINEER
02 BURHANNUDIN ABDUL

CONTRACTOR DESIGN & BUILD

BB3

BB2
PT. ADHI KARYA (Persero) Tbk.
RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA

BB1

3B 26-11-2021 ADJUSTMENT DED DRAWING

3A 08-09-2021 APPROVAL DRAWING


ROOF LEVEL PLAN A2
1 KUNINGAN STATION ACCESS BRIDGE #2
A1 A3 A4 A5 A6 P250 A7 A8 REV DATE DESCRIPTION

SKALA ENDORSED BY

04 A5' 03 1 05 NAME POSITION DATE SIGNATURE

PROJECT
ARDIANSYAH ASIZ 29-11-2021
MANAGER

CHECKED BY
PROJECT
HENDRYAN ENGINEERING 29-11-2021
MANAGER
DRAWN BY

ARRAZQA DION FADILLAH DRAFTER 26-11-2021

PROJECT

INTEGRATED LIGHT RAIL TRANSIT/LRT


TRAIN DEVELOPMENT IN JABODEBEK
CROSS SERVICES 02 CAWANG - DUKUH ATAS

DED REFERENCE NUMBER

SHOP DRAWING STEEL STRUCTURE


DRAWING TITLE

KUNINGAN STATION
CHECKED BY
ACCESS BRIDGE #2
PT. ARKONIN PT. ADHI KARYA
ROOF LEVEL PLAN
FIELD SIGN DATE FIELD SIGN DATE

PROJECT MANAGER 27-11-2021 MANAGER ENG 27-11-2021 SCALE SIZE DISCIPLINE REVISION NO.

ARSITEKTUR ENG 27-11-2021 ARSITEKTUR ENG 27-11-2021 1 : 150 A2 STRUCTURE 3B

ELEVATION REFERENCE : STRUKTUR ENG 27-11-2021 STRUKTUR ENG 27-11-2021 DRAWING NUMBER DATE
STATION CONCURSE LEVEL = ACCES BRIDGE LEVEL
= FFL ±0.000 = EL +24.418 (FROM KUNGINGAN BENCHMARKS) MEP ENG 27-11-2021 MEP ENG 27-11-2021 LRT-CV-ST-DW-L2-STKN-JPO-C2-006 26-11-2021
NOTES :

04 01
PS1 PS1 PS1 M K8 M K7 Z
017 022 017 024 K5
004 004 004 022 016
EMPLOYER
MINISTRY OF TRANSPORTATION
01 DIRECTORATE GENERAL OF RAILWAYS
DIRECTORATE OF RAILWAY INFRASTRUCTURE

BB3
Karya Building 11th Floor
BB2 Medan Merdeka Barat Street No.8, Jakarta 10110
NOTICED BY

NAME POSITION DATE SIGNATURE

P.P.K.

BB1 FERDIAN SURYO A.P


NIP. 19800215 200712 1 002
PEMBANGUNAN
PRASARANA
LRT JABODEBEK

MANAGEMENT CONSULTANT

PS1 PS1 PS1


004 004 004
S M S M
CONCOURSE LEVEL PLAN
PRTL1 KUNINGAN STATION ACCESS BRIDGE #2 PARTIAL 1
A1 023 022 A2 023 022 F K4
SKALA 020 A3 A4 016 ENDORSED BY

NAME POSITION DATE SIGNATURE


04 PROJECT
R. MANAI
MANAGER
DEPUTY
A. RAHMAT PROJECT
MANAGER

APPROVED BY

CONSTRUCTION
J. SARRE
MANAGER

YOSHIRO MIKI Station Expert


Steel Structure
LEE KUANG JIE
Expert

TERUYUKI MORITA Super Structure


Expert
GRAHAM S. HARRINGTON Civil Expert

K. M. SEMBIRING
ENGINEER
BURHANNUDIN ABDUL

CONTRACTOR DESIGN & BUILD

U P O T U O 04 U U T 01
T 025 025 024 025 025 024 025 025 025 PT. ADHI KARYA (Persero) Tbk.
025 RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA

01

3B 26-11-2021 ADJUSTMENT DED DRAWING

BB3 3A 08-09-2021 APPROVAL DRAWING

REV DATE DESCRIPTION

ENDORSED BY

BB2 NAME POSITION DATE SIGNATURE

PROJECT
ARDIANSYAH ASIZ 29-11-2021
MANAGER

CHECKED BY
PROJECT

BB1 HENDRYAN ENGINEERING


MANAGER
29-11-2021

DRAWN BY

ARRAZQA DION FADILLAH DRAFTER 26-11-2021

PROJECT

INTEGRATED LIGHT RAIL TRANSIT/LRT


TRAIN DEVELOPMENT IN JABODEBEK
T U P CROSS SERVICES 02 CAWANG - DUKUH ATAS
025 025 025
ROOF LEVEL PLAN U U U DED REFERENCE NUMBER

PRTL1 KUNINGAN STATION ACCESS BRIDGE #2 PARTIAL 1 A1 025 A2 025 025 A3 A4


SKALA
SHOP DRAWING STEEL STRUCTURE
DRAWING TITLE

04 KUNINGAN STATION
CHECKED BY ACCESS BRIDGE #2
PT. ARKONIN PT. ADHI KARYA CONCOURSE & ROOF LEVEL PLAN
FIELD SIGN DATE FIELD SIGN DATE
PARTIAL 1
PROJECT MANAGER 27-11-2021 MANAGER ENG 27-11-2021 SCALE SIZE DISCIPLINE REVISION NO.

ARSITEKTUR ENG 27-11-2021 ARSITEKTUR ENG 27-11-2021 1 : 150 A2 STRUCTURE 3B

ELEVATION REFERENCE : STRUKTUR ENG 27-11-2021 STRUKTUR ENG 27-11-2021 DRAWING NUMBER DATE
STATION CONCURSE LEVEL = ACCES BRIDGE LEVEL
= FFL ±0.000 = EL +24.418 (FROM KUNGINGAN BENCHMARKS) MEP ENG 27-11-2021 MEP ENG 27-11-2021 LRT-CV-ST-DW-L2-STKN-JPO-C2-007 26-11-2021
NOTES :

B L
019 022

EMPLOYER

AF MINISTRY OF TRANSPORTATION
02 019 DIRECTORATE GENERAL OF RAILWAYS
DIRECTORATE OF RAILWAY INFRASTRUCTURE
AD M S 05 02
K5 AB AC 019 A E S H Z
K7 S 022 023 023 021 024
017 016 018 023 018 018 020

Karya Building 11th Floor


K2 Medan Merdeka Barat Street No.8, Jakarta 10110
015 NOTICED BY

NAME POSITION DATE SIGNATURE

K3 G FERDIAN SURYO A.P


P.P.K.
PEMBANGUNAN
015 016 NIP. 19800215 200712 1 002 PRASARANA
LRT JABODEBEK

MANAGEMENT CONSULTANT

Z
024 J
021
K6 ENDORSED BY

K6 I J K4 K4 K6 017 NAME POSITION DATE SIGNATURE


A3 A4 017 021 021 A5 016 A6 016 P250 A7 017 A8
PROJECT
CONCOURSE LEVEL PLAN
A5' R. MANAI
MANAGER

PRTL2 KUNINGAN STATION ACCESS BRIDGE #2 PARTIAL 2


03 1 05 DEPUTY
SKALA A. RAHMAT PROJECT
MANAGER

APPROVED BY

CONSTRUCTION
J. SARRE
MANAGER

YOSHIRO MIKI Station Expert


Steel Structure
LEE KUANG JIE
Expert

TERUYUKI MORITA Super Structure


Expert
GRAHAM S. HARRINGTON Civil Expert

K. M. SEMBIRING
ENGINEER
BURHANNUDIN ABDUL

CONTRACTOR DESIGN & BUILD


OC
024

U T P U 05
P O T
025 025 025 025 P 025 024
025 025
02 PT. ADHI KARYA (Persero) Tbk.
02 RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA

3B 26-11-2021 ADJUSTMENT DED DRAWING

3A 08-09-2021 APPROVAL DRAWING

REV DATE DESCRIPTION

ENDORSED BY

NAME POSITION DATE SIGNATURE

PROJECT
ARDIANSYAH ASIZ 29-11-2021
MANAGER

CHECKED BY
PROJECT
HENDRYAN ENGINEERING 29-11-2021
MANAGER
DRAWN BY

ARRAZQA DION FADILLAH DRAFTER 26-11-2021

U OC PROJECT
025 024
A4 P O T P T
A3 025 024 A5 A6 025 P250 A7 025 025 A8 INTEGRATED LIGHT RAIL TRANSIT/LRT
A5' TRAIN DEVELOPMENT IN JABODEBEK
ROOF LEVEL PLAN 03 1 05 CROSS SERVICES 02 CAWANG - DUKUH ATAS
PRTL2 KUNINGAN STATION ACCESS BRIDGE #2 PARTIAL 2
SKALA

DED REFERENCE NUMBER

SHOP DRAWING STEEL STRUCTURE


DRAWING TITLE

KUNINGAN STATION
CHECKED BY ACCESS BRIDGE #2
PT. ARKONIN PT. ADHI KARYA
CONCOURSE & ROOF LEVEL PLAN
FIELD SIGN DATE FIELD SIGN DATE
PARTIAL 2
PROJECT MANAGER 27-11-2021 MANAGER ENG 27-11-2021 SCALE SIZE DISCIPLINE REVISION NO.

ARSITEKTUR ENG 27-11-2021 ARSITEKTUR ENG 27-11-2021 1 : 150 A2 STRUCTURE 3B

ELEVATION REFERENCE : STRUKTUR ENG 27-11-2021 STRUKTUR ENG 27-11-2021 DRAWING NUMBER DATE
STATION CONCURSE LEVEL = ACCES BRIDGE LEVEL
= FFL ±0.000 = EL +24.418 (FROM KUNGINGAN BENCHMARKS) MEP ENG 27-11-2021 MEP ENG 27-11-2021 LRT-CV-ST-DW-L2-STKN-JPO-C2-008 26-11-2021
NOTES :

V
023
S Q
023 023

SA 0000

CLEARANCE

CLEARANCE
023 XXX
EMPLOYER
MINISTRY OF TRANSPORTATION
C
06 020 06 BB5 06 06 DIRECTORATE GENERAL OF RAILWAYS
BB5 DIRECTORATE OF RAILWAY INFRASTRUCTURE

B B

Karya Building 11th Floor


0000 Medan Merdeka Barat Street No.8, Jakarta 10110
AA XXX OB
BB4 018 NOTICED BY
BB4 024 NAME POSITION DATE SIGNATURE
A
018
K1 OA FERDIAN SURYO A.P
P.P.K.
PEMBANGUNAN
014 W 024 NIP. 19800215 200712 1 002 PRASARANA
OC LRT JABODEBEK
023 024
N
022 MANAGEMENT CONSULTANT

Q
025
Q
025 Y Q
024 023
0000
AE X XXX
019 022 SP
ENDORSED BY

NAME POSITION DATE SIGNATURE

07 07 07 07 R. MANAI
PROJECT
MANAGER
DEPUTY
A. RAHMAT PROJECT
MANAGER

APPROVED BY

CONSTRUCTION
J. SARRE
MANAGER
P YOSHIRO MIKI Station Expert
025 Steel Structure
LEE KUANG JIE
Expert
AF T Super Structure
TERUYUKI MORITA
019 025 Expert
GRAHAM S. HARRINGTON Civil Expert

T K. M. SEMBIRING
025 BURHANNUDIN ABDUL
ENGINEER

DC CONTRACTOR DESIGN & BUILD


009 U
K O 025
SB 022 024
DC DETAIL CHAMBER
023 SKALA

W
023 PT. ADHI KARYA (Persero) Tbk.
RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA

P
025
O
D 024
AF 020
019 Y
024
3B 26-11-2021 ADJUSTMENT DED DRAWING
AE X
K3 019 E T
3A 08-09-2021 APPROVAL DRAWING

015 022 020 025 REV DATE DESCRIPTION

ENDORSED BY

AC NAME POSITION DATE SIGNATURE


018
PROJECT
ARDIANSYAH ASIZ 29-11-2021
K2 T MANAGER

015 025 CHECKED BY


PROJECT
HENDRYAN ENGINEERING 29-11-2021
MANAGER
DRAWN BY

ARRAZQA DION FADILLAH DRAFTER 26-11-2021

E PROJECT
020
INTEGRATED LIGHT RAIL TRANSIT/LRT
T TRAIN DEVELOPMENT IN JABODEBEK
025 CROSS SERVICES 02 CAWANG - DUKUH ATAS

DED REFERENCE NUMBER


S
023 P SHOP DRAWING STEEL STRUCTURE
J K4 017
021 016 A5 A6 DRAWING TITLE

A5 A6 A5' 03 KUNINGAN STATION


CHECKED BY ACCESS BRIDGE #2
A5' 03
PT. ARKONIN PT. ADHI KARYA
CONCOURSE & ROOF LEVEL PLAN
PARTIAL 3
FIELD SIGN DATE FIELD SIGN DATE

CONCOURSE LEVEL PLAN ROOF LEVEL PLAN PROJECT MANAGER 27-11-2021 MANAGER ENG 27-11-2021 SCALE SIZE DISCIPLINE REVISION NO.

PRTL3 KUNINGAN STATION ACCESS BRIDGE #2 PARTIAL 3 PRTL3 KUNINGAN STATION ACCESS BRIDGE #2 PARTIAL 3 ARSITEKTUR ENG 27-11-2021 ARSITEKTUR ENG 27-11-2021 1 : 150 A2 STRUCTURE 3B
SKALA SKALA
ELEVATION REFERENCE : STRUKTUR ENG 27-11-2021 STRUKTUR ENG 27-11-2021 DRAWING NUMBER DATE
STATION CONCURSE LEVEL = ACCES BRIDGE LEVEL
= FFL ±0.000 = EL +24.418 (FROM KUNGINGAN BENCHMARKS) MEP ENG 27-11-2021 MEP ENG 27-11-2021 LRT-CV-ST-DW-L2-STKN-JPO-C2-009 26-11-2021
NOTES :

PA
025 EMPLOYER
MINISTRY OF TRANSPORTATION
DIRECTORATE GENERAL OF RAILWAYS
PA DIRECTORATE OF RAILWAY INFRASTRUCTURE
025

K7
TL1 017
026
P VA
025 026 Karya Building 11th Floor
Medan Merdeka Barat Street No.8, Jakarta 10110
NOTICED BY

NAME POSITION DATE SIGNATURE

K8 P.P.K.
017 FERDIAN SURYO A.P PEMBANGUNAN
NIP. 19800215 200712 1 002 PRASARANA
LRT JABODEBEK

MANAGEMENT CONSULTANT
VA
026

P2B
004 ENDORSED BY

NAME POSITION DATE SIGNATURE

PROJECT
R. MANAI
MANAGER
DEPUTY
A. RAHMAT PROJECT
MANAGER
SECTION - 01
01 KUNINGAN STATION ACCESS BRIDGE #2 APPROVED BY
SKALA A1 A2 A3 A4 J. SARRE
CONSTRUCTION
MANAGER

YOSHIRO MIKI Station Expert


Steel Structure
LEE KUANG JIE
Expert

TERUYUKI MORITA Super Structure


Expert
P P P P GRAHAM S. HARRINGTON Civil Expert
025 025 025 025
K. M. SEMBIRING
ENGINEER
BURHANNUDIN ABDUL

CONTRACTOR DESIGN & BUILD

PT. ADHI KARYA (Persero) Tbk.


RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA

H H
G 021 K6 H
021 021 021 K6
017 017
K7
017 K5 K3 K2
016 015 015 REV DATE DESCRIPTION

ENDORSED BY

NAME POSITION DATE SIGNATURE

I PUTU INDRA PRABAWA PROJECT


29-11-2021
MANAGER

CHECKED BY
PROJECT
HENDRYAN ENGINEERING 29-11-2021
MANAGER
DRAWN BY

ARRAZQA DION FADILLAH DRAFTER 26-11-2021

PROJECT

INTEGRATED LIGHT RAIL TRANSIT/LRT


TRAIN DEVELOPMENT IN JABODEBEK
CROSS SERVICES 02 CAWANG - DUKUH ATAS

DED REFERENCE NUMBER

A3 A4 A5 A6 1 A7 A8 SHOP DRAWING STEEL STRUCTURE


DRAWING TITLE
A5'
SECTION - 02 KUNINGAN STATION
02 KUNINGAN STATION ACCESS BRIDGE #2 CHECKED BY
SKALA ACCESS BRIDGE #2
PT. ARKONIN PT. ADHI KARYA

FIELD SIGN DATE FIELD SIGN DATE


SECTION - 01 & 02
PROJECT MANAGER 27-11-2021 MANAGER ENG 27-11-2021 SCALE SIZE DISCIPLINE REVISION NO.

ARSITEKTUR ENG 27-11-2021 ARSITEKTUR ENG 27-11-2021 1 : 100 A2 STRUCTURE 3B

ELEVATION REFERENCE : STRUKTUR ENG 27-11-2021 STRUKTUR ENG 27-11-2021 DRAWING NUMBER DATE
STATION CONCURSE LEVEL = ACCES BRIDGE LEVEL
= FFL ±0.000 = EL +24.418 (FROM KUNINGAN BENCHMARKS) MEP ENG 27-11-2021 MEP ENG 27-11-2021 LRT-CV-ST-DW-L2-STKN-JPO-C2-010 26-11-2021
NOTES :

EMPLOYER
MINISTRY OF TRANSPORTATION
DIRECTORATE GENERAL OF RAILWAYS
DIRECTORATE OF RAILWAY INFRASTRUCTURE

Karya Building 11th Floor


Medan Merdeka Barat Street No.8, Jakarta 10110
NOTICED BY

NAME POSITION DATE SIGNATURE

P.P.K.
FERDIAN SURYO A.P PEMBANGUNAN
NIP. 19800215 200712 1 002 PRASARANA
LRT JABODEBEK

Q VB P P MANAGEMENT CONSULTANT
025 026 025 025

VB TL2
026 026 ENDORSED BY

NAME POSITION DATE SIGNATURE

PROJECT
R. MANAI
MANAGER
DEPUTY
A. RAHMAT PROJECT
MANAGER

APPROVED BY

CONSTRUCTION
J. SARRE
MANAGER

YOSHIRO MIKI Station Expert


Steel Structure

B B LEE KUANG JIE


Expert

019 019 TERUYUKI MORITA Super Structure


Expert
W W GRAHAM S. HARRINGTON Civil Expert
K1 023 023 K. M. SEMBIRING
014 BURHANNUDIN ABDUL
ENGINEER

CONTRACTOR DESIGN & BUILD

PT. ADHI KARYA (Persero) Tbk.


RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA

REV DATE DESCRIPTION

ENDORSED BY

NAME POSITION DATE SIGNATURE

I PUTU INDRA PRABAWA PROJECT


29-11-2021
MANAGER

CHECKED BY
PROJECT
HENDRYAN ENGINEERING 29-11-2021
MANAGER
DRAWN BY

ARRAZQA DION FADILLAH DRAFTER 26-11-2021

PROJECT

INTEGRATED LIGHT RAIL TRANSIT/LRT


TRAIN DEVELOPMENT IN JABODEBEK
CROSS SERVICES 02 CAWANG - DUKUH ATAS

SECTION - 03 DED REFERENCE NUMBER

BB5 BB4 03 KUNINGAN STATION ACCESS BRIDGE #2 BB3 BB1 SHOP DRAWING STEEL STRUCTURE
SKALA
DRAWING TITLE

KUNINGAN STATION
CHECKED BY
ACCESS BRIDGE #2
PT. ARKONIN PT. ADHI KARYA

FIELD SIGN DATE FIELD SIGN DATE


SECTION - 03
PROJECT MANAGER 27-11-2021 MANAGER ENG 27-11-2021 SCALE SIZE DISCIPLINE REVISION NO.

ARSITEKTUR ENG 27-11-2021 ARSITEKTUR ENG 27-11-2021 1 : 100 A2 STRUCTURE 3B

ELEVATION REFERENCE : STRUKTUR ENG 27-11-2021 STRUKTUR ENG 27-11-2021 DRAWING NUMBER DATE
STATION CONCURSE LEVEL = ACCES BRIDGE LEVEL
= FFL ±0.000 = EL +24.418 (FROM KUNINGAN BENCHMARKS) MEP ENG 27-11-2021 MEP ENG 27-11-2021 LRT-CV-ST-DW-L2-STKN-JPO-C2-011 26-11-2021
NOTES :

EMPLOYER
MINISTRY OF TRANSPORTATION
DIRECTORATE GENERAL OF RAILWAYS
DIRECTORATE OF RAILWAY INFRASTRUCTURE

TL2 P
026 025
Karya Building 11th Floor
Medan Merdeka Barat Street No.8, Jakarta 10110
NOTICED BY

NAME POSITION DATE SIGNATURE

P.P.K.
FERDIAN SURYO A.P PEMBANGUNAN
NIP. 19800215 200712 1 002 PRASARANA
LRT JABODEBEK

P P MANAGEMENT CONSULTANT
025 025

ENDORSED BY
K4 NAME POSITION DATE SIGNATURE
016
PROJECT
R. MANAI
MANAGER
DEPUTY
A. RAHMAT PROJECT
MANAGER

APPROVED BY

CONSTRUCTION
J. SARRE
MANAGER

YOSHIRO MIKI Station Expert


Steel Structure
LEE KUANG JIE
Expert

TERUYUKI MORITA Super Structure


Expert

K6 GRAHAM S. HARRINGTON Civil Expert

017 K. M. SEMBIRING
ENGINEER
BURHANNUDIN ABDUL

CONTRACTOR DESIGN & BUILD

PT. ADHI KARYA (Persero) Tbk.


RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA

REV DATE DESCRIPTION

ENDORSED BY

NAME POSITION DATE SIGNATURE

BB2 I PUTU INDRA PRABAWA PROJECT


MANAGER
29-11-2021

SECTION - 04 CHECKED BY

04 KUNINGAN STATION ACCESS BRIDGE #2 PROJECT


HENDRYAN ENGINEERING 29-11-2021
SKALA MANAGER
DRAWN BY

ARRAZQA DION FADILLAH DRAFTER 26-11-2021

PROJECT

INTEGRATED LIGHT RAIL TRANSIT/LRT


BB1 BB3 TRAIN DEVELOPMENT IN JABODEBEK
CROSS SERVICES 02 CAWANG - DUKUH ATAS
SECTION - 05
05 KUNINGAN STATION ACCESS BRIDGE #2
SKALA DED REFERENCE NUMBER

SHOP DRAWING STEEL STRUCTURE


DRAWING TITLE

KUNINGAN STATION
CHECKED BY
ACCESS BRIDGE #2
PT. ARKONIN PT. ADHI KARYA

FIELD SIGN DATE FIELD SIGN DATE


SECTION - 04 & 05
PROJECT MANAGER 27-11-2021 MANAGER ENG 27-11-2021 SCALE SIZE DISCIPLINE REVISION NO.

ARSITEKTUR ENG 27-11-2021 ARSITEKTUR ENG 27-11-2021 1 : 100 A2 STRUCTURE 3B

ELEVATION REFERENCE : STRUKTUR ENG 27-11-2021 STRUKTUR ENG 27-11-2021 DRAWING NUMBER DATE
STATION CONCURSE LEVEL = ACCES BRIDGE LEVEL
= FFL ±0.000 = EL +24.418 (FROM KUNINGAN BENCHMARKS) MEP ENG 27-11-2021 MEP ENG 27-11-2021 LRT-CV-ST-DW-L2-STKN-JPO-C2-012 26-11-2021
NOTES :

EMPLOYER
MINISTRY OF TRANSPORTATION
DIRECTORATE GENERAL OF RAILWAYS
DIRECTORATE OF RAILWAY INFRASTRUCTURE

Karya Building 11th Floor


Medan Merdeka Barat Street No.8, Jakarta 10110
NOTICED BY

NAME POSITION DATE SIGNATURE

P.P.K.
FERDIAN SURYO A.P PEMBANGUNAN
NIP. 19800215 200712 1 002 PRASARANA
LRT JABODEBEK

MANAGEMENT CONSULTANT

ENDORSED BY

NAME POSITION DATE SIGNATURE

PROJECT
R. MANAI
MANAGER
DEPUTY
A. RAHMAT PROJECT
MANAGER

APPROVED BY
TL2 Q P
026 VB TL2 CONSTRUCTION
025 026 025 J. SARRE
MANAGER
026
YOSHIRO MIKI Station Expert
Steel Structure
LEE KUANG JIE
Expert

TERUYUKI MORITA Super Structure


Expert
GRAHAM S. HARRINGTON Civil Expert
AE X
019 023 K. M. SEMBIRING
ENGINEER
BURHANNUDIN ABDUL

CONTRACTOR DESIGN & BUILD

W
023

PT. ADHI KARYA (Persero) Tbk.


RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA

K1
014

REV DATE DESCRIPTION

ENDORSED BY

NAME POSITION DATE SIGNATURE

I PUTU INDRA PRABAWA PROJECT


29-11-2021
MANAGER

CHECKED BY
PROJECT
HENDRYAN ENGINEERING 29-11-2021
MANAGER
DRAWN BY

ARRAZQA DION FADILLAH DRAFTER 26-11-2021

PROJECT

INTEGRATED LIGHT RAIL TRANSIT/LRT


TRAIN DEVELOPMENT IN JABODEBEK
CROSS SERVICES 02 CAWANG - DUKUH ATAS

A5 A5' A6 A6 A5 A5' A6 1 DED REFERENCE NUMBER

SECTION - 06 SECTION - 07
06 KUNINGAN STATION ACCESS BRIDGE #2
SKALA
07 KUNINGAN STATION ACCESS BRIDGE #2
SKALA
SHOP DRAWING STEEL STRUCTURE
DRAWING TITLE

KUNINGAN STATION
CHECKED BY
ACCESS BRIDGE #2
PT. ARKONIN PT. ADHI KARYA

FIELD SIGN DATE FIELD SIGN DATE


SECTION - 06 & 07
PROJECT MANAGER 27-11-2021 MANAGER ENG 27-11-2021 SCALE SIZE DISCIPLINE REVISION NO.

ARSITEKTUR ENG 27-11-2021 ARSITEKTUR ENG 27-11-2021 1 : 100 A2 STRUCTURE 3B

ELEVATION REFERENCE : STRUKTUR ENG 27-11-2021 STRUKTUR ENG 27-11-2021 DRAWING NUMBER DATE
STATION CONCURSE LEVEL = ACCES BRIDGE LEVEL
= FFL ±0.000 = EL +24.418 (FROM KUNINGAN BENCHMARKS) MEP ENG 27-11-2021 MEP ENG 27-11-2021 LRT-CV-ST-DW-L2-STKN-JPO-C2-013 26-11-2021
NOTES :

K1B
014

EMPLOYER
MINISTRY OF TRANSPORTATION
DIRECTORATE GENERAL OF RAILWAYS
DIRECTORATE OF RAILWAY INFRASTRUCTURE

Karya Building 11th Floor


Medan Merdeka Barat Street No.8, Jakarta 10110
NOTICED BY

NAME POSITION DATE SIGNATURE

P.P.K.
FERDIAN SURYO A.P PEMBANGUNAN
NIP. 19800215 200712 1 002 PRASARANA
LRT JABODEBEK

MANAGEMENT CONSULTANT

ENDORSED BY

NAME POSITION DATE SIGNATURE

K1B SECTION - K1B R. MANAI


PROJECT
K1A SECTION - K1A SKALA
MANAGER
DEPUTY
SKALA
A. RAHMAT PROJECT
MANAGER

APPROVED BY

CONSTRUCTION
J. SARRE
MANAGER

YOSHIRO MIKI Station Expert

Steel Structure
LEE KUANG JIE Expert

TERUYUKI MORITA Super Structure


Expert
GRAHAM S. HARRINGTON Civil Expert

K. M. SEMBIRING
ENGINEER
BURHANNUDIN ABDUL

CONTRACTOR DESIGN & BUILD

PT. ADHI KARYA (Persero) Tbk.


RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA

3B 26-11-2021 ADJUSTMENT DED DRAWING

3A 08-09-2021 APPROVAL DRAWING

REV DATE DESCRIPTION

ENDORSED BY

NAME POSITION DATE SIGNATURE

ARDIANSYAH ASIZ PROJECT


29-11-2021
MANAGER

CHECKED BY
PROJECT
HENDRYAN ENGINEERING 29-11-2021
MANAGER
DRAWN BY

ARRAZQA DION FADILLAH DRAFTER 26-11-2021

PROJECT
K1A
014 INTEGRATED LIGHT RAIL TRANSIT/LRT
TRAIN DEVELOPMENT IN JABODEBEK
CROSS SERVICES 02 CAWANG - DUKUH ATAS
K1 DETAIL - K1
SKALA

DED REFERENCE NUMBER

SHOP DRAWING STEEL STRUCTURE


DRAWING TITLE

KUNINGAN STATION
CHECKED BY
ACCESS BRIDGE #2
PT. ARKONIN PT. ADHI KARYA DETAIL K1
FIELD SIGN DATE FIELD SIGN DATE

PROJECT MANAGER 27-11-2021 MANAGER ENG 27-11-2021 SCALE SIZE DISCIPLINE REVISION NO.

ARSITEKTUR ENG 27-11-2021 ARSITEKTUR ENG 27-11-2021 1 : 10 A2 STRUCTURE 3B

ELEVATION REFERENCE : STRUKTUR ENG 27-11-2021 STRUKTUR ENG 27-11-2021 DRAWING NUMBER DATE
STATION CONCURSE LEVEL = ACCES BRIDGE LEVEL
= FFL ±0.000 = EL +24.418 (FROM KUNINGAN BENCHMARKS) MEP ENG 27-11-2021 MEP ENG 27-11-2021 LRT-CV-ST-DW-L2-STKN-JPO-C2-014 26-11-2021
NOTES :

K2B K2C
015 015

EMPLOYER
MINISTRY OF TRANSPORTATION
DIRECTORATE GENERAL OF RAILWAYS
DIRECTORATE OF RAILWAY INFRASTRUCTURE

K2C SECTION - K2C


SKALA Karya Building 11th Floor
Medan Merdeka Barat Street No.8, Jakarta 10110
NOTICED BY

NAME POSITION DATE SIGNATURE

P.P.K.
FERDIAN SURYO A.P PEMBANGUNAN
NIP. 19800215 200712 1 002 PRASARANA
LRT JABODEBEK

MANAGEMENT CONSULTANT
K2A
015

K2 DETAIL - K2 ENDORSED BY
SKALA
K2B SECTION - K2B NAME POSITION DATE SIGNATURE
SKALA
PROJECT
R. MANAI
MANAGER
DEPUTY
A. RAHMAT PROJECT
MANAGER

APPROVED BY

CONSTRUCTION
J. SARRE
MANAGER
K2A SECTION - K2A
SKALA YOSHIRO MIKI Station Expert
Steel Structure
LEE KUANG JIE
Expert

TERUYUKI MORITA Super Structure


Expert
GRAHAM S. HARRINGTON Civil Expert

K. M. SEMBIRING
ENGINEER
BURHANNUDIN ABDUL
K3C K3B
015 015
CONTRACTOR DESIGN & BUILD

PT. ADHI KARYA (Persero) Tbk.


RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA

3B 26-11-2021 ADJUSTMENT DED DRAWING

3A 08-09-2021 APPROVAL DRAWING

REV DATE DESCRIPTION

ENDORSED BY

NAME POSITION DATE SIGNATURE

ARDIANSYAH ASIZ PROJECT


29-11-2021
MANAGER

CHECKED BY
PROJECT
HENDRYAN ENGINEERING 29-11-2021
MANAGER
K3C SECTION - K3C DRAWN BY
SKALA
K3A ARRAZQA DION FADILLAH DRAFTER 26-11-2021
015
PROJECT

INTEGRATED LIGHT RAIL TRANSIT/LRT


TRAIN DEVELOPMENT IN JABODEBEK
CROSS SERVICES 02 CAWANG - DUKUH ATAS

DED REFERENCE NUMBER

K3 DETAIL - K3 SHOP DRAWING STEEL STRUCTURE


SKALA
K3B SECTION - K3B DRAWING TITLE
SKALA
KUNINGAN STATION
CHECKED BY
ACCESS BRIDGE #2
PT. ARKONIN PT. ADHI KARYA DETAIL K2 & K3
FIELD SIGN DATE FIELD SIGN DATE

PROJECT MANAGER 27-11-2021 MANAGER ENG 27-11-2021 SCALE SIZE DISCIPLINE REVISION NO.

ARSITEKTUR ENG 27-11-2021 ARSITEKTUR ENG 27-11-2021 1 : 10 A2 STRUCTURE 3B


K3A SECTION - K3A ELEVATION REFERENCE : STRUKTUR ENG 27-11-2021 STRUKTUR ENG 27-11-2021 DRAWING NUMBER DATE
SKALA STATION CONCURSE LEVEL = ACCES BRIDGE LEVEL
= FFL ±0.000 = EL +24.418 (FROM KUNINGAN BENCHMARKS) MEP ENG 27-11-2021 MEP ENG 27-11-2021 LRT-CV-ST-DW-L2-STKN-JPO-C2-015 26-11-2021
NOTES :

K4B
016

EMPLOYER
MINISTRY OF TRANSPORTATION
DIRECTORATE GENERAL OF RAILWAYS
DIRECTORATE OF RAILWAY INFRASTRUCTURE

Karya Building 11th Floor


Medan Merdeka Barat Street No.8, Jakarta 10110
K4B SECTION - K4B NOTICED BY

SKALA NAME POSITION DATE SIGNATURE

P.P.K.
FERDIAN SURYO A.P PEMBANGUNAN
NIP. 19800215 200712 1 002 PRASARANA
LRT JABODEBEK

MANAGEMENT CONSULTANT

K4A
016

ENDORSED BY

NAME POSITION DATE SIGNATURE

PROJECT
R. MANAI
MANAGER
DEPUTY
A. RAHMAT PROJECT
MANAGER
K4A SECTION - K4A APPROVED BY
K4 DETAIL - K4 SKALA
SKALA CONSTRUCTION
J. SARRE
MANAGER

YOSHIRO MIKI Station Expert


Steel Structure
LEE KUANG JIE
Expert

TERUYUKI MORITA Super Structure


Expert
GRAHAM S. HARRINGTON Civil Expert

K. M. SEMBIRING
ENGINEER
BURHANNUDIN ABDUL

CONTRACTOR DESIGN & BUILD

PT. ADHI KARYA (Persero) Tbk.


K5B K5C RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA
016 016

3B 26-11-2021 ADJUSTMENT DED DRAWING

3A 08-09-2021 APPROVAL DRAWING

REV DATE DESCRIPTION

ENDORSED BY

NAME POSITION DATE SIGNATURE

ARDIANSYAH ASIZ PROJECT


29-11-2021
MANAGER

CHECKED BY
PROJECT
HENDRYAN ENGINEERING 29-11-2021
MANAGER
DRAWN BY
K5B SECTION - K5B
SKALA ARRAZQA DION FADILLAH DRAFTER 26-11-2021

PROJECT
K5A
016 INTEGRATED LIGHT RAIL TRANSIT/LRT
TRAIN DEVELOPMENT IN JABODEBEK
CROSS SERVICES 02 CAWANG - DUKUH ATAS
K5C SECTION - K5C
SKALA
K5A SECTION - K5A
SKALA DED REFERENCE NUMBER

SHOP DRAWING STEEL STRUCTURE


DRAWING TITLE

KUNINGAN STATION
K5 DETAIL - K5 CHECKED BY
ACCESS BRIDGE #2
SKALA
PT. ARKONIN PT. ADHI KARYA DETAIL K4 & K5
FIELD SIGN DATE FIELD SIGN DATE

PROJECT MANAGER 27-11-2021 MANAGER ENG 27-11-2021 SCALE SIZE DISCIPLINE REVISION NO.

ARSITEKTUR ENG 27-11-2021 ARSITEKTUR ENG 27-11-2021 1 : 10 A2 STRUCTURE 3B

ELEVATION REFERENCE : STRUKTUR ENG 27-11-2021 STRUKTUR ENG 27-11-2021 DRAWING NUMBER DATE
STATION CONCURSE LEVEL = ACCES BRIDGE LEVEL
= FFL ±0.000 = EL +24.418 (FROM KUNINGAN BENCHMARKS) MEP ENG 27-11-2021 MEP ENG 27-11-2021 LRT-CV-ST-DW-L2-STKN-JPO-C2-016 26-11-2021
NOTES :

K6B
017

EMPLOYER
MINISTRY OF TRANSPORTATION
DIRECTORATE GENERAL OF RAILWAYS
DIRECTORATE OF RAILWAY INFRASTRUCTURE

K6B SECTION - K6B


SKALA

Karya Building 11th Floor


Medan Merdeka Barat Street No.8, Jakarta 10110
NOTICED BY
K6A SECTION - K6A NAME POSITION DATE SIGNATURE
SKALA

P.P.K.
FERDIAN SURYO A.P PEMBANGUNAN
NIP. 19800215 200712 1 002 PRASARANA
LRT JABODEBEK

K6A
017 MANAGEMENT CONSULTANT
K7A
K7B 017
017
K7 DETAIL - K7
SKALA

ENDORSED BY

NAME POSITION DATE SIGNATURE

PROJECT
R. MANAI
MANAGER
K6 DETAIL - K6 DEPUTY
SKALA A. RAHMAT PROJECT
MANAGER

APPROVED BY

CONSTRUCTION
J. SARRE
MANAGER

YOSHIRO MIKI Station Expert


Steel Structure
LEE KUANG JIE
Expert

TERUYUKI MORITA Super Structure


Expert
GRAHAM S. HARRINGTON Civil Expert

K. M. SEMBIRING
ENGINEER
K7B SECTION - K7B BURHANNUDIN ABDUL
SKALA
CONTRACTOR DESIGN & BUILD

K7A SECTION - K7A


SKALA

PT. ADHI KARYA (Persero) Tbk.


RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA

K8B 3B 26-11-2021 ADJUSTMENT DED DRAWING


017 3A 08-09-2021 APPROVAL DRAWING

REV DATE DESCRIPTION

ENDORSED BY

NAME POSITION DATE SIGNATURE

ARDIANSYAH ASIZ PROJECT


29-11-2021
MANAGER

CHECKED BY
PROJECT
HENDRYAN ENGINEERING 29-11-2021
MANAGER
DRAWN BY

ARRAZQA DION FADILLAH DRAFTER 26-11-2021

PROJECT

INTEGRATED LIGHT RAIL TRANSIT/LRT


TRAIN DEVELOPMENT IN JABODEBEK
K8A CROSS SERVICES 02 CAWANG - DUKUH ATAS
017
DED REFERENCE NUMBER
K8B SECTION - K8B
SKALA
SHOP DRAWING STEEL STRUCTURE
K8A SECTION - K8A DRAWING TITLE
SKALA
KUNINGAN STATION
CHECKED BY
ACCESS BRIDGE #2
PT. ARKONIN PT. ADHI KARYA DETAIL K6, K7 & K8
K8 DETAIL - K8 FIELD SIGN DATE FIELD SIGN DATE
SKALA
PROJECT MANAGER 27-11-2021 MANAGER ENG 27-11-2021 SCALE SIZE DISCIPLINE REVISION NO.

ARSITEKTUR ENG 27-11-2021 ARSITEKTUR ENG 27-11-2021 1 : 10 A2 STRUCTURE 3B

ELEVATION REFERENCE : STRUKTUR ENG 27-11-2021 STRUKTUR ENG 27-11-2021 DRAWING NUMBER DATE
STATION CONCURSE LEVEL = ACCES BRIDGE LEVEL
= FFL ±0.000 = EL +24.418 (FROM KUNINGAN BENCHMARKS) MEP ENG 27-11-2021 MEP ENG 27-11-2021 LRT-CV-ST-DW-L2-STKN-JPO-C2-017 26-11-2021
NOTES :

EMPLOYER
MINISTRY OF TRANSPORTATION
DIRECTORATE GENERAL OF RAILWAYS
A1
018 DIRECTORATE OF RAILWAY INFRASTRUCTURE

A2 SECTION - A2
SKALA
A DETAIL A AA1
SKALA
018
Karya Building 11th Floor
AA2 SECTION - AA2
SKALA Medan Merdeka Barat Street No.8, Jakarta 10110
AA DETAIL AA NOTICED BY
A3 SKALA
018 NAME POSITION DATE SIGNATURE
A2 AA2 AA3
018 018 018
P.P.K.
FERDIAN SURYO A.P PEMBANGUNAN
NIP. 19800215 200712 1 002 PRASARANA
LRT JABODEBEK

MANAGEMENT CONSULTANT

A3 SECTION - A3 ENDORSED BY
SKALA NAME POSITION DATE SIGNATURE

PROJECT
AA3 SECTION - AA3 R. MANAI
MANAGER
SKALA DEPUTY
A. RAHMAT PROJECT
MANAGER

APPROVED BY

CONSTRUCTION
J. SARRE
MANAGER
A SECTION-A1 AA1 SECTION - AA1
SKALA SKALA YOSHIRO MIKI Station Expert
Steel Structure
LEE KUANG JIE Expert

TERUYUKI MORITA Super Structure


Expert
GRAHAM S. HARRINGTON Civil Expert

K. M. SEMBIRING
ENGINEER
BURHANNUDIN ABDUL

CONTRACTOR DESIGN & BUILD

PT. ADHI KARYA (Persero) Tbk.


RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA

AC1
018

3B 26-11-2021 ADJUSTMENT DED DRAWING


AC2 SECTION - AC2
AB1 SKALA 3A 08-09-2021 APPROVAL DRAWING
018 REV DATE DESCRIPTION
AC DETAIL - AC ENDORSED BY
SKALA
NAME POSITION DATE SIGNATURE

AB2 SECTION - AB2 ARDIANSYAH ASIZ PROJECT


SKALA 29-11-2021
MANAGER

AC2 AC3
AB DETAIL AB
CHECKED BY
018 018
SKALA PROJECT
HENDRYAN ENGINEERING 29-11-2021
MANAGER
DRAWN BY

AB2 AB3 ARRAZQA DION FADILLAH DRAFTER 26-11-2021


018 018
PROJECT

INTEGRATED LIGHT RAIL TRANSIT/LRT


TRAIN DEVELOPMENT IN JABODEBEK
CROSS SERVICES 02 CAWANG - DUKUH ATAS

DED REFERENCE NUMBER

AC3 SECTION - AC3


SKALA SHOP DRAWING STEEL STRUCTURE
DRAWING TITLE

AB3 SECTION - AB3 AC1 SECTION - AC1 KUNINGAN STATION


SKALA SKALA CHECKED BY
ACCESS BRIDGE #2
PT. ARKONIN PT. ADHI KARYA DETAIL A, AA, AB, & AC
AB1 SECTION - AB1 FIELD SIGN DATE FIELD SIGN DATE
SKALA PROJECT MANAGER 27-11-2021 MANAGER ENG 27-11-2021 SCALE SIZE DISCIPLINE REVISION NO.

ARSITEKTUR ENG 27-11-2021 ARSITEKTUR ENG 27-11-2021 1 : 10 A2 STRUCTURE 3B

ELEVATION REFERENCE : STRUKTUR ENG 27-11-2021 STRUKTUR ENG 27-11-2021 DRAWING NUMBER DATE
STATION CONCURSE LEVEL = ACCES BRIDGE LEVEL
= FFL ±0.000 = EL +24.418 (FROM KUNINGAN BENCHMARKS) MEP ENG 27-11-2021 MEP ENG 27-11-2021 LRT-CV-ST-DW-L2-STKN-JPO-C2-018 26-11-2021
NOTES :

EMPLOYER
MINISTRY OF TRANSPORTATION
AE1
019 DIRECTORATE GENERAL OF RAILWAYS
DIRECTORATE OF RAILWAY INFRASTRUCTURE
AE DETAIL - AE
SKALA

AD1
019

AE2
AD DETAIL - AD 019
SKALA AD2 SECTION - AD2 Karya Building 11th Floor
SKALA Medan Merdeka Barat Street No.8, Jakarta 10110
NOTICED BY
AD2 AD3
019 019 NAME POSITION DATE SIGNATURE

P.P.K.
FERDIAN SURYO A.P PEMBANGUNAN
NIP. 19800215 200712 1 002 PRASARANA
LRT JABODEBEK

MANAGEMENT CONSULTANT

ENDORSED BY

AD3 SECTION - AD3 AE1 SECTION - AE1 AE2 SECTION - AE2 NAME POSITION DATE SIGNATURE
SKALA SKALA SKALA PROJECT
R. MANAI
AD1 SECTION - AD1 MANAGER
SKALA DEPUTY
A. RAHMAT PROJECT
MANAGER

APPROVED BY

CONSTRUCTION
J. SARRE
MANAGER

YOSHIRO MIKI Station Expert


Steel Structure
LEE KUANG JIE
Expert

TERUYUKI MORITA Super Structure


Expert
GRAHAM S. HARRINGTON Civil Expert

K. M. SEMBIRING
ENGINEER
BURHANNUDIN ABDUL

CONTRACTOR DESIGN & BUILD

PT. ADHI KARYA (Persero) Tbk.


RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA

AF1
B1 019
019
3B 26-11-2021 ADJUSTMENT DED DRAWING
AF DETAIL - AF
SKALA 3A 08-09-2021 APPROVAL DRAWING

REV DATE DESCRIPTION


AF2 SECTION - AF2
SKALA ENDORSED BY

B DETAIL - B NAME POSITION DATE SIGNATURE


SKALA
PROJECT
B2 SECTION - B2 ARDIANSYAH ASIZ
MANAGER
29-11-2021
SKALA
CHECKED BY
B3 AF2 AF3
B2 019 019 019
PROJECT
019 HENDRYAN ENGINEERING 29-11-2021
MANAGER
DRAWN BY

ARRAZQA DION FADILLAH DRAFTER 26-11-2021

PROJECT

INTEGRATED LIGHT RAIL TRANSIT/LRT


TRAIN DEVELOPMENT IN JABODEBEK
CROSS SERVICES 02 CAWANG - DUKUH ATAS

AF3 SECTION - AF3


SKALA
DED REFERENCE NUMBER

B3 SECTION - B3
SKALA SHOP DRAWING STEEL STRUCTURE
DRAWING TITLE
AF1 SECTION - AF1
SKALA KUNINGAN STATION
CHECKED BY
ACCESS BRIDGE #2
PT. ARKONIN PT. ADHI KARYA DETAIL AD, AE, AF, & B
FIELD SIGN DATE FIELD SIGN DATE

PROJECT MANAGER 27-11-2021 MANAGER ENG 27-11-2021 SCALE SIZE DISCIPLINE REVISION NO.

B1 SECTION - B1
ARSITEKTUR ENG 27-11-2021 ARSITEKTUR ENG 27-11-2021 1 : 10 A2 STRUCTURE 3B

SKALA ELEVATION REFERENCE : STRUKTUR ENG 27-11-2021 STRUKTUR ENG 27-11-2021 DRAWING NUMBER DATE
STATION CONCURSE LEVEL = ACCES BRIDGE LEVEL
= FFL ±0.000 = EL +24.418 (FROM KUNINGAN BENCHMARKS) MEP ENG 27-11-2021 MEP ENG 27-11-2021 LRT-CV-ST-DW-L2-STKN-JPO-C2-019 26-11-2021
NOTES :

C3
020
C2
020

C1
020

EMPLOYER
D1
020 MINISTRY OF TRANSPORTATION
DIRECTORATE GENERAL OF RAILWAYS
DIRECTORATE OF RAILWAY INFRASTRUCTURE

C3 SECTION - C3
SKALA

D DETAIL-D
SKALA

Karya Building 11th Floor


C1 SECTION - C1 Medan Merdeka Barat Street No.8, Jakarta 10110
SKALA NOTICED BY
D3
020 D2 NAME POSITION DATE SIGNATURE
020
P.P.K.
FERDIAN SURYO A.P PEMBANGUNAN
NIP. 19800215 200712 1 002 PRASARANA
LRT JABODEBEK

MANAGEMENT CONSULTANT

D3 SECTION - D3
SKALA

ENDORSED BY

NAME POSITION DATE SIGNATURE

PROJECT
R. MANAI
MANAGER
DEPUTY
A. RAHMAT PROJECT
MANAGER

APPROVED BY

CONSTRUCTION
J. SARRE
MANAGER
C2 SECTION - C2
DETAIL - C SKALA D1 SECTION- D1 YOSHIRO MIKI Station Expert
C D2 SECTION - D2 SKALA Steel Structure
SKALA LEE KUANG JIE
SKALA Expert

TERUYUKI MORITA Super Structure


Expert
GRAHAM S. HARRINGTON Civil Expert

K. M. SEMBIRING
ENGINEER
BURHANNUDIN ABDUL

CONTRACTOR DESIGN & BUILD

PT. ADHI KARYA (Persero) Tbk.


RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA

F1
E1 020
020
3B 26-11-2021 ADJUSTMENT DED DRAWING
F2 SECTION - F2
SKALA 3A 08-09-2021 APPROVAL DRAWING
F DETAIL - F
REV DATE DESCRIPTION
SKALA
ENDORSED BY

NAME POSITION DATE SIGNATURE

E DETAIL-E ARDIANSYAH ASIZ PROJECT


MANAGER
29-11-2021
SKALA E2 SECTION - E2
SKALA CHECKED BY
F2 F3 PROJECT
020 020 HENDRYAN ENGINEERING 29-11-2021
MANAGER
E3
020 E2 DRAWN BY

020
ARRAZQA DION FADILLAH DRAFTER 26-11-2021

PROJECT

INTEGRATED LIGHT RAIL TRANSIT/LRT


TRAIN DEVELOPMENT IN JABODEBEK
CROSS SERVICES 02 CAWANG - DUKUH ATAS

DED REFERENCE NUMBER


F3 SECTION - F3
SKALA

SECTION- F1
SHOP DRAWING STEEL STRUCTURE
F
E3 SECTION - E3 SKALA DRAWING TITLE
SKALA
KUNINGAN STATION
CHECKED BY
ACCESS BRIDGE #2
PT. ARKONIN PT. ADHI KARYA DETAIL C, D, E, & F
FIELD SIGN DATE FIELD SIGN DATE

PROJECT MANAGER 27-11-2021 MANAGER ENG 27-11-2021 SCALE SIZE DISCIPLINE REVISION NO.

ARSITEKTUR ENG 27-11-2021 ARSITEKTUR ENG 27-11-2021 1 : 10 A2 STRUCTURE 3B


E1 SECTION - E1 ELEVATION REFERENCE : STRUKTUR ENG 27-11-2021 STRUKTUR ENG 27-11-2021 DRAWING NUMBER DATE
SKALA STATION CONCURSE LEVEL = ACCES BRIDGE LEVEL
= FFL ±0.000 = EL +24.418 (FROM KUNINGAN BENCHMARKS) MEP ENG 27-11-2021 MEP ENG 27-11-2021 LRT-CV-ST-DW-L2-STKN-JPO-C2-020 26-11-2021
NOTES :

EMPLOYER
MINISTRY OF TRANSPORTATION
DIRECTORATE GENERAL OF RAILWAYS
DIRECTORATE OF RAILWAY INFRASTRUCTURE
G1
021
H1
021

G DETAIL - G G2 SECTION - G2 H2 SECTION - H2


SKALA SKALA SKALA
Karya Building 11th Floor
H DETAIL - H Medan Merdeka Barat Street No.8, Jakarta 10110
SKALA
NOTICED BY

NAME POSITION DATE SIGNATURE

H3
H2 021 P.P.K.
G3 021 FERDIAN SURYO A.P PEMBANGUNAN
G2 021 NIP. 19800215 200712 1 002 PRASARANA
LRT JABODEBEK
021

MANAGEMENT CONSULTANT

ENDORSED BY

NAME POSITION DATE SIGNATURE


H3 SECTION - H3
SKALA PROJECT
R. MANAI
MANAGER
G3 SECTION - G3 DEPUTY
SKALA A. RAHMAT PROJECT
G1 SECTION - G1 MANAGER

SKALA APPROVED BY
H1 SECTION - H1
SKALA CONSTRUCTION
J. SARRE
MANAGER

YOSHIRO MIKI Station Expert

Steel Structure
LEE KUANG JIE
Expert

TERUYUKI MORITA Super Structure


Expert
GRAHAM S. HARRINGTON Civil Expert

K. M. SEMBIRING
ENGINEER
BURHANNUDIN ABDUL
I1
021 CONTRACTOR DESIGN & BUILD

PT. ADHI KARYA (Persero) Tbk.


RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA

J1
021

DETAIL - J J2 SECTION - J2 3B 26-11-2021 ADJUSTMENT DED DRAWING


J SKALA
SKALA 3A 08-09-2021 APPROVAL DRAWING

I2 SECTION - I2 REV DATE DESCRIPTION


SKALA
ENDORSED BY

NAME POSITION DATE SIGNATURE

ARDIANSYAH ASIZ PROJECT


29-11-2021
I DETAIL - I MANAGER

SKALA CHECKED BY
I2
021 PROJECT
HENDRYAN ENGINEERING 29-11-2021
MANAGER
J3
021 I3 DRAWN BY
J2 021
021
ARRAZQA DION FADILLAH DRAFTER 26-11-2021

PROJECT

INTEGRATED LIGHT RAIL TRANSIT/LRT


TRAIN DEVELOPMENT IN JABODEBEK
CROSS SERVICES 02 CAWANG - DUKUH ATAS

I3 SECTION - I3 DED REFERENCE NUMBER


SKALA

SHOP DRAWING STEEL STRUCTURE


J3 SECTION - J3 DRAWING TITLE
SKALA
J1 SECTION - J1 KUNINGAN STATION
SKALA
I1 SECTION - I1 CHECKED BY
ACCESS BRIDGE #2
SKALA PT. ARKONIN PT. ADHI KARYA DETAIL G, H, I, & J
FIELD SIGN DATE FIELD SIGN DATE

PROJECT MANAGER 27-11-2021 MANAGER ENG 27-11-2021 SCALE SIZE DISCIPLINE REVISION NO.

ARSITEKTUR ENG 27-11-2021 ARSITEKTUR ENG 27-11-2021 1 : 10 A2 STRUCTURE 3B

ELEVATION REFERENCE : STRUKTUR ENG 27-11-2021 STRUKTUR ENG 27-11-2021 DRAWING NUMBER DATE
STATION CONCURSE LEVEL = ACCES BRIDGE LEVEL
= FFL ±0.000 = EL +24.418 (FROM KUNINGAN BENCHMARKS) MEP ENG 27-11-2021 MEP ENG 27-11-2021 LRT-CV-ST-DW-L2-STKN-JPO-C2-021 26-11-2021
NOTES :

EMPLOYER
MINISTRY OF TRANSPORTATION
N1 DIRECTORATE GENERAL OF RAILWAYS
022
DIRECTORATE OF RAILWAY INFRASTRUCTURE

M1
022

N DETAIL - N
N2 SECTION - N2
SKALA
SKALA M DETAIL - M M2 SECTION - M2
SKALA SKALA
Karya Building 11th Floor
Medan Merdeka Barat Street No.8, Jakarta 10110
NOTICED BY

NAME POSITION DATE SIGNATURE

M2 M3
022 022 P.P.K.
N2 FERDIAN SURYO A.P PEMBANGUNAN

022 N3 NIP. 19800215 200712 1 002 PRASARANA


LRT JABODEBEK
022
MANAGEMENT CONSULTANT

ENDORSED BY

NAME POSITION DATE SIGNATURE

PROJECT
R. MANAI
MANAGER

N3 SECTION - N3 M SECTION - M3
N1 SECTION - N1
DEPUTY

SKALA M SECTION - M1 SKALA A. RAHMAT PROJECT


MANAGER
SKALA
SKALA
APPROVED BY

CONSTRUCTION
J. SARRE
MANAGER

YOSHIRO MIKI Station Expert

Steel Structure
LEE KUANG JIE
Expert

TERUYUKI MORITA Super Structure


Expert
GRAHAM S. HARRINGTON Civil Expert

K. M. SEMBIRING
ENGINEER
BURHANNUDIN ABDUL

CONTRACTOR DESIGN & BUILD

PT. ADHI KARYA (Persero) Tbk.


RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA

K1
022
L1
022
K DETAIL - K
SKALA K2 SECTION - K2
3B 26-11-2021 ADJUSTMENT DED DRAWING
SKALA

L2 SECTION - L2
3A 08-09-2021 APPROVAL DRAWING

REV DATE DESCRIPTION


L DETAIL - L SKALA
ENDORSED BY
SKALA
POSITION DATE SIGNATURE
K2 K3 NAME

022 022 ARDIANSYAH ASIZ PROJECT


29-11-2021
MANAGER

L3 CHECKED BY

L2 022 HENDRYAN
PROJECT
ENGINEERING 29-11-2021
022 MANAGER
DRAWN BY

ARRAZQA DION FADILLAH DRAFTER 26-11-2021

PROJECT

INTEGRATED LIGHT RAIL TRANSIT/LRT


TRAIN DEVELOPMENT IN JABODEBEK
CROSS SERVICES 02 CAWANG - DUKUH ATAS

K3 SECTION - K3 DED REFERENCE NUMBER

SKALA
SHOP DRAWING STEEL STRUCTURE
K1 SECTION - K1
DRAWING TITLE
SKALA
L3 SECTION - L3 KUNINGAN STATION
SKALA CHECKED BY
ACCESS BRIDGE #2
L1 SECTION - L1
SKALA PT. ARKONIN PT. ADHI KARYA DETAIL K, L, M, & N
FIELD SIGN DATE FIELD SIGN DATE

PROJECT MANAGER 27-11-2021 MANAGER ENG 27-11-2021 SCALE SIZE DISCIPLINE REVISION NO.

ARSITEKTUR ENG 27-11-2021 ARSITEKTUR ENG 27-11-2021 1 : 10 A2 STRUCTURE 3B

ELEVATION REFERENCE : STRUKTUR ENG 27-11-2021 STRUKTUR ENG 27-11-2021 DRAWING NUMBER DATE
STATION CONCURSE LEVEL = ACCES BRIDGE LEVEL
= FFL ±0.000 = EL +24.418 (FROM KUNINGAN BENCHMARKS) MEP ENG 27-11-2021 MEP ENG 27-11-2021 LRT-CV-ST-DW-L2-STKN-JPO-C2-022 26-11-2021
NOTES :

SB2 S2
023 023

SA2
023

EMPLOYER
SB1 S1
023 MINISTRY OF TRANSPORTATION
023
DIRECTORATE GENERAL OF RAILWAYS
SA1
023 DIRECTORATE OF RAILWAY INFRASTRUCTURE

DETAIL - S SA DETAIL - SA
SB DETAIL - SB S SKALA
SKALA SKALA
Karya Building 11th Floor
Medan Merdeka Barat Street No.8, Jakarta 10110
NOTICED BY

NAME POSITION DATE SIGNATURE

P.P.K.
FERDIAN SURYO A.P PEMBANGUNAN
NIP. 19800215 200712 1 002 PRASARANA

SA1 SECTION - SA1 LRT JABODEBEK

SKALA
S1 SECTION - S1 MANAGEMENT CONSULTANT
SKALA

SB1 SECTION - SB1


SKALA

ENDORSED BY

NAME POSITION DATE SIGNATURE

PROJECT
R. MANAI
MANAGER

SA2 SECTION - SA2


DEPUTY
A. RAHMAT PROJECT
MANAGER
SKALA
APPROVED BY

CONSTRUCTION
S2 SECTION - S2
J. SARRE
MANAGER

SB2 SECTION - SB2 SKALA YOSHIRO MIKI Station Expert


SKALA Steel Structure
LEE KUANG JIE
Expert

TERUYUKI MORITA Super Structure


Expert
GRAHAM S. HARRINGTON Civil Expert

W1 K. M. SEMBIRING
022 BURHANNUDIN ABDUL
ENGINEER

X2 CONTRACTOR DESIGN & BUILD


023

PT. ADHI KARYA (Persero) Tbk.


RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA

W DETAIL - W
SKALA
3B 26-11-2021 ADJUSTMENT DED DRAWING

3A 08-09-2021 APPROVAL DRAWING


W2
023 REV DATE DESCRIPTION

X2 SECTION - X2
ENDORSED BY
X1 SECTION - X1 NAME POSITION DATE SIGNATURE
SKALA SKALA
ARDIANSYAH ASIZ PROJECT
29-11-2021
MANAGER

CHECKED BY
PROJECT
HENDRYAN ENGINEERING 29-11-2021
MANAGER
DRAWN BY

ARRAZQA DION FADILLAH DRAFTER 26-11-2021

PROJECT

INTEGRATED LIGHT RAIL TRANSIT/LRT


TRAIN DEVELOPMENT IN JABODEBEK
X1 CROSS SERVICES 02 CAWANG - DUKUH ATAS
023

DED REFERENCE NUMBER

SHOP DRAWING STEEL STRUCTURE


X DETAIL - X DRAWING TITLE
SKALA
KUNINGAN STATION
CHECKED BY
ACCESS BRIDGE #2
PT. ARKONIN PT. ADHI KARYA DETAIL S, SA, SB, W, & X
FIELD SIGN DATE FIELD SIGN DATE

PROJECT MANAGER 27-11-2021 MANAGER ENG 27-11-2021 SCALE SIZE DISCIPLINE REVISION NO.

ARSITEKTUR ENG 27-11-2021 ARSITEKTUR ENG 27-11-2021 1 : 10 A2 STRUCTURE 3B

W1 SECTION - W1 W2 SECTION - W2 ELEVATION REFERENCE : STRUKTUR ENG 27-11-2021 STRUKTUR ENG 27-11-2021 DRAWING NUMBER DATE
SKALA SKALA STATION CONCURSE LEVEL = ACCES BRIDGE LEVEL
= FFL ±0.000 = EL +24.418 (FROM KUNINGAN BENCHMARKS) MEP ENG 27-11-2021 MEP ENG 27-11-2021 LRT-CV-ST-DW-L2-STKN-JPO-C2-023 26-11-2021
NOTES :

Z2 O2
024
024

Y1 O1
024 024 EMPLOYER
Z1 MINISTRY OF TRANSPORTATION
024 DIRECTORATE GENERAL OF RAILWAYS
DIRECTORATE OF RAILWAY INFRASTRUCTURE

Y DETAIL - Y
SKALA

O DETAIL - O
SKALA
Karya Building 11th Floor
Y2 DETAIL - Z Medan Merdeka Barat Street No.8, Jakarta 10110
024 Z
NOTICED BY
SKALA
NAME POSITION DATE SIGNATURE

P.P.K.
FERDIAN SURYO A.P PEMBANGUNAN
NIP. 19800215 200712 1 002 PRASARANA
LRT JABODEBEK

O1 SECTION - O1 MANAGEMENT CONSULTANT


SKALA
Z2 SECTION - Z2
SKALA

O3
024
ENDORSED BY

NAME POSITION DATE SIGNATURE

Y1 SECTION - Y1 Y2 SECTION - Y2 R. MANAI


PROJECT
MANAGER
SKALA SKALA DEPUTY
A. RAHMAT PROJECT
MANAGER

APPROVED BY

Z1 SECTION - Z1 O2 SECTION - O2 O3 SECTION - O3 J. SARRE


CONSTRUCTION
SKALA SKALA SKALA MANAGER

YOSHIRO MIKI Station Expert


Steel Structure
LEE KUANG JIE
Expert

TERUYUKI MORITA Super Structure


Expert
GRAHAM S. HARRINGTON Civil Expert

K. M. SEMBIRING
ENGINEER
BURHANNUDIN ABDUL
OB2 OC1 CONTRACTOR DESIGN & BUILD
024 024

OA2
024
OC1 SECTION - OC1
OA3 SKALA PT. ADHI KARYA (Persero) Tbk.
024 OB3 RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA
024

OA1 OC2
024 OB1 024
024 OC3
024
3B 26-11-2021 ADJUSTMENT DED DRAWING

3A 08-09-2021 APPROVAL DRAWING

OA2 SECTION - OA2 OB2 SECTION - OB2 REV DATE DESCRIPTION


SKALA SKALA
ENDORSED BY

NAME POSITION DATE SIGNATURE


OA DETAIL - OA
SKALA OC DETAIL-OC OC2 SECTION - OC2 ARDIANSYAH ASIZ PROJECT
29-11-2021
MANAGER
SKALA
SKALA
OB DETAIL - OB CHECKED BY
SKALA PROJECT
HENDRYAN ENGINEERING 29-11-2021
MANAGER
DRAWN BY

ARRAZQA DION FADILLAH DRAFTER 26-11-2021

PROJECT

INTEGRATED LIGHT RAIL TRANSIT/LRT


TRAIN DEVELOPMENT IN JABODEBEK
CROSS SERVICES 02 CAWANG - DUKUH ATAS

OC3 SECTION - OC3


OA3 SECTION - OA3
DED REFERENCE NUMBER
SKALA
OA1 SECTION - OA1 SKALA
SKALA SHOP DRAWING STEEL STRUCTURE
OB1 SECTION - OB1 OB3 SECTION - OB3 DRAWING TITLE
SKALA SKALA
KUNINGAN STATION
CHECKED BY
ACCESS BRIDGE #2
PT. ARKONIN PT. ADHI KARYA DETAIL Y, Z, O, OA, OB, & OC
FIELD SIGN DATE FIELD SIGN DATE

PROJECT MANAGER 27-11-2021 MANAGER ENG 27-11-2021 SCALE SIZE DISCIPLINE REVISION NO.

ARSITEKTUR ENG 27-11-2021 ARSITEKTUR ENG 27-11-2021 1 : 10 A2 STRUCTURE 3B

ELEVATION REFERENCE : STRUKTUR ENG 27-11-2021 STRUKTUR ENG 27-11-2021 DRAWING NUMBER DATE
STATION CONCURSE LEVEL = ACCES BRIDGE LEVEL
= FFL ±0.000 = EL +24.418 (FROM KUNINGAN BENCHMARKS) MEP ENG 27-11-2021 MEP ENG 27-11-2021 LRT-CV-ST-DW-L2-STKN-JPO-C2-024 26-11-2021
NOTES :

EMPLOYER
MINISTRY OF TRANSPORTATION

Q1 DIRECTORATE GENERAL OF RAILWAYS


025 DIRECTORATE OF RAILWAY INFRASTRUCTURE
P1 PA1
025 025

PA2 SECTION - PA2


SKALA

Karya Building 11th Floor


Medan Merdeka Barat Street No.8, Jakarta 10110
Q DETAIL - Q NOTICED BY

P DETAIL - P PA DETAIL - PA SKALA NAME POSITION DATE SIGNATURE

SKALA
SKALA
P.P.K.
FERDIAN SURYO A.P PEMBANGUNAN
NIP. 19800215 200712 1 002 PRASARANA
Q2 LRT JABODEBEK

025
P2 MANAGEMENT CONSULTANT
025
PA25
02

ENDORSED BY

NAME POSITION DATE SIGNATURE

PROJECT
R. MANAI
MANAGER
DEPUTY
A. RAHMAT PROJECT
P2 SECTION - P2 Q2 SECTION - Q2 MANAGER
SKALA SKALA
P1 SECTION - P1 PA1 SECTION - PA1 Q1 SECTION - Q1
APPROVED BY

SKALA SKALA J. SARRE


CONSTRUCTION
SKALA MANAGER

YOSHIRO MIKI Station Expert


Steel Structure
LEE KUANG JIE
Expert

TERUYUKI MORITA Super Structure


Expert
GRAHAM S. HARRINGTON Civil Expert

V2 K. M. SEMBIRING
025 BURHANNUDIN ABDUL
ENGINEER

U2 CONTRACTOR DESIGN & BUILD


025
T1
025
V1
025
U1
025 PT. ADHI KARYA (Persero) Tbk.
RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA

U DETAIL - U V DETAIL - V
SKALA
T2 SKALA
025

3B 26-11-2021 ADJUSTMENT DED DRAWING

3A 08-09-2021 APPROVAL DRAWING

REV DATE DESCRIPTION

ENDORSED BY

NAME POSITION DATE SIGNATURE

ARDIANSYAH ASIZ PROJECT


29-11-2021
MANAGER
T DETAIL - T
SKALA CHECKED BY
PROJECT
V1 SECTION - V1 HENDRYAN ENGINEERING 29-11-2021
U1 SECTION - U1 SKALA MANAGER
SKALA DRAWN BY

ARRAZQA DION FADILLAH DRAFTER 26-11-2021

PROJECT

INTEGRATED LIGHT RAIL TRANSIT/LRT


T1 SECTION - T1 TRAIN DEVELOPMENT IN JABODEBEK
SKALA CROSS SERVICES 02 CAWANG - DUKUH ATAS

T3 DED REFERENCE NUMBER


025
V2 SECTION - V2
SKALA
SHOP DRAWING STEEL STRUCTURE
DRAWING TITLE

KUNINGAN STATION
T2 SECTION - T2 U2 SECTION - U2 CHECKED BY
ACCESS BRIDGE #2
SKALA
T3 SECTION - T3 SKALA PT. ARKONIN PT. ADHI KARYA DETAIL P, PA, Q, T, U, & V
SKALA FIELD SIGN DATE FIELD SIGN DATE

PROJECT MANAGER 27-11-2021 MANAGER ENG 27-11-2021 SCALE SIZE DISCIPLINE REVISION NO.

ARSITEKTUR ENG 27-11-2021 ARSITEKTUR ENG 27-11-2021 1 : 10 A2 STRUCTURE 3B

ELEVATION REFERENCE : STRUKTUR ENG 27-11-2021 STRUKTUR ENG 27-11-2021 DRAWING NUMBER DATE
STATION CONCURSE LEVEL = ACCES BRIDGE LEVEL
= FFL ±0.000 = EL +24.418 (FROM KUNINGAN BENCHMARKS) MEP ENG 27-11-2021 MEP ENG 27-11-2021 LRT-CV-ST-DW-L2-STKN-JPO-C2-025 26-11-2021
NOTES :

VA1
026

EMPLOYER
MINISTRY OF TRANSPORTATION
VA2 DIRECTORATE GENERAL OF RAILWAYS
026 VB1 DIRECTORATE OF RAILWAY INFRASTRUCTURE
026
VA DETAIL - VA
SKALA

VB DETAIL - VB Karya Building 11th Floor


SKALA Medan Merdeka Barat Street No.8, Jakarta 10110
NOTICED BY

NAME POSITION DATE SIGNATURE

VB2 FERDIAN SURYO A.P


P.P.K.
PEMBANGUNAN
026 NIP. 19800215 200712 1 002 PRASARANA
LRT JABODEBEK

MANAGEMENT CONSULTANT

TL1 DETAIL - TL1


SKALA

VB3 SECTION - VB3 ENDORSED BY

SKALA NAME POSITION DATE SIGNATURE

VA2 SECTION - VA2 PROJECT


SKALA VB1 SECTION - VB1 R. MANAI
MANAGER
SKALA DEPUTY
A. RAHMAT PROJECT
MANAGER

APPROVED BY

CONSTRUCTION
J. SARRE
MANAGER

YOSHIRO MIKI Station Expert


VB3 LEE KUANG JIE
Steel Structure
026 Expert

TERUYUKI MORITA Super Structure


Expert
GRAHAM S. HARRINGTON Civil Expert

K. M. SEMBIRING
ENGINEER
BURHANNUDIN ABDUL

CONTRACTOR DESIGN & BUILD

VA1 SECTION - VA1


SKALA PT. ADHI KARYA (Persero) Tbk.
PL DETAIL - PL RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA
SKALA

VB2 SECTION - VB2


SKALA

3B 26-11-2021 ADJUSTMENT DED DRAWING

3A 08-09-2021 APPROVAL DRAWING

REV DATE DESCRIPTION

ENDORSED BY

NAME POSITION DATE SIGNATURE

ARDIANSYAH ASIZ PROJECT


29-11-2021
MANAGER

TL2C CHECKED BY
026 PROJECT
HENDRYAN ENGINEERING 29-11-2021
MANAGER
DRAWN BY

ARRAZQA DION FADILLAH DRAFTER 26-11-2021

PROJECT

INTEGRATED LIGHT RAIL TRANSIT/LRT


TRAIN DEVELOPMENT IN JABODEBEK
CROSS SERVICES 02 CAWANG - DUKUH ATAS

TL2C SECTION - TL2C


SKALA
DED REFERENCE NUMBER

TL2A TL2B
026 026 TL2B SECTION - TL2B
SHOP DRAWING STEEL STRUCTURE
TL2A SECTION - TL2A SKALA DRAWING TITLE

TL2 DETAIL - TL2 SKALA


KUNINGAN STATION
SKALA CHECKED BY
ACCESS BRIDGE #2
PT. ARKONIN PT. ADHI KARYA DETAIL VA,VB, TL1, TL2, & PL
FIELD SIGN DATE FIELD SIGN DATE

PROJECT MANAGER 27-11-2021 MANAGER ENG 27-11-2021 SCALE SIZE DISCIPLINE REVISION NO.

ARSITEKTUR ENG 27-11-2021 ARSITEKTUR ENG 27-11-2021 1 : 10 A2 STRUCTURE 3B

ELEVATION REFERENCE : STRUKTUR ENG 27-11-2021 STRUKTUR ENG 27-11-2021 DRAWING NUMBER DATE
STATION CONCURSE LEVEL = ACCES BRIDGE LEVEL
= FFL ±0.000 = EL +24.418 (FROM KUNINGAN BENCHMARKS) MEP ENG 27-11-2021 MEP ENG 27-11-2021 LRT-CV-ST-DW-L2-STKN-JPO-C2-026 26-11-2021
NOTES :

EMPLOYER
MINISTRY OF TRANSPORTATION
DIRECTORATE GENERAL OF RAILWAYS
DIRECTORATE OF RAILWAY INFRASTRUCTURE

Karya Building 11th Floor


Medan Merdeka Barat Street No.8, Jakarta 10110
NOTICED BY

NAME POSITION DATE SIGNATURE

P.P.K.
FERDIAN SURYO A.P PEMBANGUNAN
NIP. 19800215 200712 1 002 PRASARANA
LRT JABODEBEK

MANAGEMENT CONSULTANT

ENDORSED BY

NAME POSITION DATE SIGNATURE

PROJECT
R. MANAI
MANAGER
DEPUTY
A. RAHMAT PROJECT
MANAGER

APPROVED BY

CONSTRUCTION
J. SARRE
MANAGER

YOSHIRO MIKI Station Expert


Steel Structure
LEE KUANG JIE
Expert

TERUYUKI MORITA Super Structure


Expert
GRAHAM S. HARRINGTON Civil Expert

K. M. SEMBIRING
ENGINEER
BURHANNUDIN ABDUL

CONTRACTOR DESIGN & BUILD

PT. ADHI KARYA (Persero) Tbk.


RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA

3B 26-11-2021 ADJUSTMENT DED DRAWING

3A 08-09-2021 APPROVAL DRAWING

REV DATE DESCRIPTION

ENDORSED BY

NAME POSITION DATE SIGNATURE

ARDIANSYAH ASIZ PROJECT


29-11-2021
MANAGER

CHECKED BY
PROJECT
HENDRYAN ENGINEERING 29-11-2021
MANAGER
DRAWN BY

ARRAZQA DION FADILLAH DRAFTER 26-11-2021

PROJECT

INTEGRATED LIGHT RAIL TRANSIT/LRT


TRAIN DEVELOPMENT IN JABODEBEK
CROSS SERVICES 02 CAWANG - DUKUH ATAS

DED REFERENCE NUMBER

SHOP DRAWING STEEL STRUCTURE


DRAWING TITLE

KUNINGAN STATION
CHECKED BY ACCESS BRIDGE #2
3D VIEW LIFT ISOMETRIC PT. ARKONIN PT. ADHI KARYA 3D VIEW LIFT ISOMETRIC
1 FIELD SIGN DATE FIELD SIGN DATE
SKALA
PROJECT MANAGER 27-11-2021 MANAGER ENG 27-11-2021 SCALE SIZE DISCIPLINE REVISION NO.

ARSITEKTUR ENG 27-11-2021 ARSITEKTUR ENG 27-11-2021 N.T.S A2 STRUCTURE 3B

STRUKTUR ENG 27-11-2021 STRUKTUR ENG 27-11-2021 DRAWING NUMBER DATE

MEP ENG 27-11-2021 MEP ENG 27-11-2021 LRT-CV-ST-DW-L2-STKN-JPO-C2-027 26-11-2021


NOTES :

1B VA 1B
029 030 029

EMPLOYER
MINISTRY OF TRANSPORTATION
DIRECTORATE GENERAL OF RAILWAYS

W DIRECTORATE OF RAILWAY INFRASTRUCTURE

030

1A 1A Karya Building 11th Floor


029 029 Medan Merdeka Barat Street No.8, Jakarta 10110
NOTICED BY

NAME POSITION DATE SIGNATURE

P.P.K.

V FERDIAN SURYO A.P


NIP. 19800215 200712 1 002
PEMBANGUNAN
PRASARANA
LRT JABODEBEK
030
W MANAGEMENT CONSULTANT
1B 030 C SECTION - C
A SECTION - A 029
SKALA SKALA
X X
1B 030 030 1B
029 029 Y WB
V 030 030 V ENDORSED BY

030 030 NAME POSITION DATE SIGNATURE

PROJECT
R. MANAI
MANAGER
DEPUTY
A. RAHMAT PROJECT
MANAGER

APPROVED BY

CONSTRUCTION
W J. SARRE
MANAGER

030 YOSHIRO MIKI Station Expert


Steel Structure
LEE KUANG JIE
Expert

TERUYUKI MORITA Super Structure


Expert
GRAHAM S. HARRINGTON Civil Expert

X 1A K. M. SEMBIRING
029 ENGINEER
030 BURHANNUDIN ABDUL

CONTRACTOR DESIGN & BUILD

1A 1A
029 029

PT. ADHI KARYA (Persero) Tbk.


X RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA

V B SECTION - B 030
030 SKALA
F SECTION - F W
SKALA 030
D SECTION - D
SKALA
1B 3B 26-11-2021 ADJUSTMENT DED DRAWING
029
V 3A 08-09-2021 APPROVAL DRAWING

030 REV

ENDORSED BY
DATE DESCRIPTION

NAME POSITION DATE SIGNATURE

ARDIANSYAH ASIZ PROJECT


29-11-2021
MANAGER

CHECKED BY
PROJECT
HENDRYAN ENGINEERING 29-11-2021
MANAGER
DRAWN BY
PT. FUJI ELEVATOR INDONESIA
ARRAZQA DION FADILLAH DRAFTER 26-11-2021

PROJECT

INTEGRATED LIGHT RAIL TRANSIT/LRT


TRAIN DEVELOPMENT IN JABODEBEK
CROSS SERVICES 02 CAWANG - DUKUH ATAS

1A DED REFERENCE NUMBER

029
SHOP DRAWING STEEL STRUCTURE
DRAWING TITLE

WA CHECKED BY
KUNINGAN STATION
ACCESS BRIDGE #2
030 PT. ARKONIN PT. ADHI KARYA LIFT PLAN
FIELD SIGN DATE FIELD SIGN DATE

E SECTION - E PROJECT MANAGER 27-11-2021 MANAGER ENG 27-11-2021 SCALE SIZE DISCIPLINE REVISION NO.
SKALA ARSITEKTUR ENG 27-11-2021 ARSITEKTUR ENG 27-11-2021 1 : 50 A2 STRUCTURE 3B
ELEVATION REFERENCE :
STRUKTUR ENG 27-11-2021 STRUKTUR ENG 27-11-2021 DRAWING NUMBER DATE
STATION CONCURSE LEVEL = ACCES BRIDGE LEVEL
= FFL ±0.000 = EL +24.418 (FROM KUNINGAN BENCHMARKS) MEP ENG 27-11-2021 MEP ENG 27-11-2021 LRT-CV-ST-DW-L2-STKN-JPO-028 26-11-2021
NOTES :
PT. FUJI ELEVATOR INDONESIA
WB
WB 030
030
F F
028 028

EMPLOYER

E E MINISTRY OF TRANSPORTATION

WA 028 WA 028 DIRECTORATE GENERAL OF RAILWAYS


DIRECTORATE OF RAILWAY INFRASTRUCTURE
030 030

Karya Building 11th Floor


Medan Merdeka Barat Street No.8, Jakarta 10110

D D NOTICED BY

NAME POSITION DATE SIGNATURE


028 028
P.P.K.
FERDIAN SURYO A.P PEMBANGUNAN
NIP. 19800215 200712 1 002 PRASARANA
LRT JABODEBEK

MANAGEMENT CONSULTANT

ENDORSED BY

NAME POSITION DATE SIGNATURE

PROJECT
R. MANAI
MANAGER
DEPUTY
A. RAHMAT PROJECT
MANAGER

APPROVED BY

CONSTRUCTION
J. SARRE
MANAGER
W W W W YOSHIRO MIKI Station Expert

030 030 030 030 LEE KUANG JIE


Steel Structure
Expert

TERUYUKI MORITA Super Structure


Expert
GRAHAM S. HARRINGTON Civil Expert

K. M. SEMBIRING
ENGINEER
BURHANNUDIN ABDUL

C C CONTRACTOR DESIGN & BUILD

028 028

PT. ADHI KARYA (Persero) Tbk.


RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA

3B 26-11-2021 ADJUSTMENT DED DRAWING


Door Height

Door Height
3A 08-09-2021 APPROVAL DRAWING

X X X X REV DATE DESCRIPTION

030 030 030 030 ENDORSED BY

NAME POSITION DATE SIGNATURE

ARDIANSYAH ASIZ PROJECT


29-11-2021
B B CHECKED BY
MANAGER

028 028 PROJECT


HENDRYAN ENGINEERING 29-11-2021
MANAGER
DRAWN BY

ARRAZQA DION FADILLAH DRAFTER 26-11-2021

PROJECT
A A
028 028 INTEGRATED LIGHT RAIL TRANSIT/LRT
TRAIN DEVELOPMENT IN JABODEBEK
CROSS SERVICES 02 CAWANG - DUKUH ATAS

DED REFERENCE NUMBER

SHOP DRAWING STEEL STRUCTURE


DRAWING TITLE

KUNINGAN STATION
CHECKED BY
ACCESS BRIDGE #2
PT. ARKONIN PT. ADHI KARYA LIFT SECTION 1A & 1B
FIELD SIGN DATE FIELD SIGN DATE
1B SECTION 1B
1A SECTION 1A SKALA
PROJECT MANAGER 27-11-2021 MANAGER ENG 27-11-2021 SCALE SIZE DISCIPLINE REVISION NO.

SKALA ARSITEKTUR ENG 27-11-2021 ARSITEKTUR ENG 27-11-2021 1 : 50 A2 STRUCTURE 3B


ELEVATION REFERENCE :
STRUKTUR ENG 27-11-2021 STRUKTUR ENG 27-11-2021 DRAWING NUMBER DATE
STATION CONCURSE LEVEL = ACCES BRIDGE LEVEL
= FFL ±0.000 = EL +24.418 (FROM KUNINGAN BENCHMARKS) MEP ENG 27-11-2021 MEP ENG 27-11-2021 LRT-CV-ST-DW-L2-STKN-JPO-C2-029 26-11-2021
NOTES :

VA2
030

V2 VA1
V1 030 030
030

EMPLOYER
MINISTRY OF TRANSPORTATION
VA DETAIL - VA
SKALA DIRECTORATE GENERAL OF RAILWAYS
VA2 SECTION - VA2 DIRECTORATE OF RAILWAY INFRASTRUCTURE
SKALA
V DETAIL - V
SKALA VA1 SECTION - VA1
SKALA

V2 SECTION - V2
SKALA
V1 SECTION - V1
SKALA Karya Building 11th Floor
Medan Merdeka Barat Street No.8, Jakarta 10110
NOTICED BY

NAME POSITION DATE SIGNATURE


WA2
030
P.P.K.
FERDIAN SURYO A.P PEMBANGUNAN
NIP. 19800215 200712 1 002 PRASARANA
LRT JABODEBEK
W2
030
MANAGEMENT CONSULTANT

ENDORSED BY
WA DETAIL - WA WA1 SECTION - WA1 POSITION DATE SIGNATURE
NAME
SKALA SKALA
W2 PROJECT
030 WA2 SECTION - WA2 R. MANAI
MANAGER
SKALA DEPUTY
A. RAHMAT PROJECT
MANAGER

APPROVED BY
WB1 CONSTRUCTION
W1 030 J. SARRE
MANAGER
030
YOSHIRO MIKI Station Expert
Steel Structure
LEE KUANG JIE
Expert

TERUYUKI MORITA Super Structure


Expert
GRAHAM S. HARRINGTON Civil Expert

K. M. SEMBIRING

W DETAIL - W W2 SECTION - W2 ENGINEER


W1 SECTION - W1 SKALA
BURHANNUDIN ABDUL
SKALA SKALA CONTRACTOR DESIGN & BUILD

WB1 SECTION - WB1


SKALA
PT. ADHI KARYA (Persero) Tbk.
RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA
WB DETAIL - WB
SKALA

Y1 3B 26-11-2021 ADJUSTMENT DED DRAWING


030 3A 08-09-2021 APPROVAL DRAWING

REV DATE DESCRIPTION

ENDORSED BY

NAME POSITION DATE SIGNATURE

ARDIANSYAH ASIZ PROJECT


29-11-2021
Y2 MANAGER
030
CHECKED BY

Y2 SECTION - Y2 HENDRYAN
PROJECT
ENGINEERING 29-11-2021
SKALA MANAGER
DRAWN BY

Y DETAIL - Y ARRAZQA DION FADILLAH DRAFTER 26-11-2021

SKALA
PROJECT

X1
030 INTEGRATED LIGHT RAIL TRANSIT/LRT
TRAIN DEVELOPMENT IN JABODEBEK
CROSS SERVICES 02 CAWANG - DUKUH ATAS

DED REFERENCE NUMBER

SHOP DRAWING STEEL STRUCTURE


DRAWING TITLE
X DETAIL - X
SKALA
X1 SECTION - X1
SKALA Y1 SECTION - Y1 KUNINGAN STATION
SKALA CHECKED BY ACCESS BRIDGE #2
PT. ARKONIN PT. ADHI KARYA DETAIL V, VA, W, WA, WB, X, & Y
FIELD SIGN DATE FIELD SIGN DATE

PROJECT MANAGER 27-11-2021 MANAGER ENG 27-11-2021 SCALE SIZE DISCIPLINE REVISION NO.

ARSITEKTUR ENG 27-11-2021 ARSITEKTUR ENG 27-11-2021 1 : 10 A2 STRUCTURE 3B


ELEVATION REFERENCE :
STRUKTUR ENG 27-11-2021 STRUKTUR ENG 27-11-2021 DRAWING NUMBER DATE
STATION CONCURSE LEVEL = ACCES BRIDGE LEVEL
= FFL ±0.000 = EL +24.418 (FROM KUNINGAN BENCHMARKS) MEP ENG 27-11-2021 MEP ENG 27-11-2021 LRT-CV-ST-DW-L2-STKN-JPO-C2-030 26-11-2021
NOTES :

A
031

EMPLOYER
MINISTRY OF TRANSPORTATION
DIRECTORATE GENERAL OF RAILWAYS
DIRECTORATE OF RAILWAY INFRASTRUCTURE
BB3

BB2

Karya Building 11th Floor


B Medan Merdeka Barat Street No.8, Jakarta 10110
031 NOTICED BY

NAME POSITION DATE SIGNATURE


BB1
P.P.K.
FERDIAN SURYO A.P PEMBANGUNAN
NIP. 19800215 200712 1 002 PRASARANA
LRT JABODEBEK

MANAGEMENT CONSULTANT

CONCOURSE LEVEL PLAN


KUNINGAN STATION ACCESS BRIDGE #2 PARTIAL 1 A1 A2 SCB SCA A3 A4
1 031 031
SKALA

ENDORSED BY

NAME POSITION DATE SIGNATURE

PROJECT
R. MANAI
MANAGER
DEPUTY
A. RAHMAT PROJECT
MANAGER

APPROVED BY

CONSTRUCTION
J. SARRE
MANAGER
SC1 SC2 YOSHIRO MIKI Station Expert
VOID STEEL DECK VOID STEEL DECK
STEEL DECK STEEL DECK Steel Structure
LEE KUANG JIE
Expert

TERUYUKI MORITA Super Structure


Expert
GRAHAM S. HARRINGTON Civil Expert
SHEAR CONNECTOR SHEAR CONNECTOR
D16-200 D16-200 K. M. SEMBIRING
ENGINEER
BURHANNUDIN ABDUL

CONTRACTOR DESIGN & BUILD

PT. ADHI KARYA (Persero) Tbk.


A SECTION - A SCA DETAIL SHEAR CONNECTOR 1 - SCA SCB DETAIL SHEAR CONNECTOR 2 - SCB RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA

SKALA SKALA SKALA


A2

3B 26-11-2021 ADJUSTMENT DED DRAWING

3A 08-09-2021 APPROVAL DRAWING

REV DATE DESCRIPTION

01 7 TYP
ENDORSED BY

POSITION DATE SIGNATURE


7 TYP
NAME

031 ARDIANSYAH ASIZ PROJECT


MANAGER
29-11-2021

SC2 SECTION SHEAR CONNECTOR 2 - SC2 CHECKED BY


SC1 SECTION SHEAR CONNECTOR 1 - SC1 SKALA
PROJECT
SKALA HENDRYAN ENGINEERING 29-11-2021
MANAGER
DRAWN BY

ARRAZQA DION FADILLAH DRAFTER 26-11-2021

PROJECT
LEGEND :
INTEGRATED LIGHT RAIL TRANSIT/LRT
TRAIN DEVELOPMENT IN JABODEBEK
CROSS SERVICES 02 CAWANG - DUKUH ATAS

DED REFERENCE NUMBER

SHOP DRAWING STEEL STRUCTURE


B SECTION - B DRAWING TITLE
KUNINGAN STATION
SKALA
ACCESS BRIDGE #2
A2 CHECKED BY
SLAB PARTIAL #1,DETAIL SCA & SCB,
PT. ARKONIN PT. ADHI KARYA
SECTION SC1 & SC2, & DETAIL - 01
FIELD SIGN DATE FIELD SIGN DATE

PROJECT MANAGER 27-11-2021 MANAGER ENG 27-11-2021 SCALE SIZE DISCIPLINE REVISION NO.

01 DETAIL - 01 ARSITEKTUR ENG 27-11-2021 ARSITEKTUR ENG 27-11-2021 1:100, 1:50, 1:20, 1:10 A2 STRUCTURE 3B

SKALA STRUKTUR ENG 27-11-2021 STRUKTUR ENG 27-11-2021 DRAWING NUMBER DATE

MEP ENG 27-11-2021 MEP ENG 27-11-2021 LRT-CV-ST-DW-L2-STKN-JPO-C2-031 26-11-2021


NOTES :

C EMPLOYER

032 MINISTRY OF TRANSPORTATION


DIRECTORATE GENERAL OF RAILWAYS
DIRECTORATE OF RAILWAY INFRASTRUCTURE

Karya Building 11th Floor


BB3 Medan Merdeka Barat Street No.8, Jakarta 10110

D NOTICED BY

NAME POSITION DATE SIGNATURE


033
BB2
P.P.K.
FERDIAN SURYO A.P PEMBANGUNAN
NIP. 19800215 200712 1 002 PRASARANA
LRT JABODEBEK

MANAGEMENT CONSULTANT
BB1

ENDORSED BY

NAME POSITION DATE SIGNATURE

PROJECT
R. MANAI
MANAGER
DEPUTY
A3 A4 A5 A6 P250 A7 A8 A. RAHMAT PROJECT
MANAGER

CONCOURSE LEVEL PLAN 1 APPROVED BY

1 KUNINGAN STATION ACCESS BRIDGE #2 PARTIAL 2 J. SARRE


CONSTRUCTION
MANAGER
SKALA
YOSHIRO MIKI Station Expert
Steel Structure
LEE KUANG JIE
Expert

TERUYUKI MORITA Super Structure


Expert
GRAHAM S. HARRINGTON Civil Expert

K. M. SEMBIRING
ENGINEER
BURHANNUDIN ABDUL

CONTRACTOR DESIGN & BUILD

02 PT. ADHI KARYA (Persero) Tbk.


RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA
032

3B 26-11-2021 ADJUSTMENT DED DRAWING

3A 08-09-2021 APPROVAL DRAWING

REV DATE DESCRIPTION

ENDORSED BY

02 DETAIL - 02 NAME POSITION DATE SIGNATURE

SKALA PROJECT
ARDIANSYAH ASIZ 29-11-2021
MANAGER

CHECKED BY
PROJECT
HENDRYAN ENGINEERING 29-11-2021
MANAGER
DRAWN BY

ARRAZQA DION FADILLAH DRAFTER 26-11-2021

PROJECT
BB1 BB3 LEGEND :
C SECTION - C INTEGRATED LIGHT RAIL TRANSIT/LRT
SKALA TRAIN DEVELOPMENT IN JABODEBEK
CROSS SERVICES 02 CAWANG - DUKUH ATAS

DED REFERENCE NUMBER

SHOP DRAWING STEEL STRUCTURE


DRAWING TITLE

KUNINGAN STATION
CHECKED BY
ACCESS BRIDGE #2
SLAB PARTIAL #2, SECTION C,
PT. ARKONIN PT. ADHI KARYA
& DETAIL 02
FIELD SIGN DATE FIELD SIGN DATE

PROJECT MANAGER 27-11-2021 MANAGER ENG 27-11-2021 SCALE SIZE DISCIPLINE REVISION NO.

ARSITEKTUR ENG 27-11-2021 ARSITEKTUR ENG 27-11-2021 1:50, 1:20, 1:15, 1:10 A2 STRUCTURE 3B

STRUKTUR ENG 27-11-2021 STRUKTUR ENG 27-11-2021 DRAWING NUMBER DATE

MEP ENG 27-11-2021 MEP ENG 27-11-2021 LRT-CV-ST-DW-L2-STKN-JPO-C2-032 26-11-2021


NOTES :

EMPLOYER
MINISTRY OF TRANSPORTATION
DIRECTORATE GENERAL OF RAILWAYS
DIRECTORATE OF RAILWAY INFRASTRUCTURE

Karya Building 11th Floor


04 Medan Merdeka Barat Street No.8, Jakarta 10110

033 NOTICED BY

NAME POSITION DATE SIGNATURE

P.P.K.
FERDIAN SURYO A.P PEMBANGUNAN
NIP. 19800215 200712 1 002 PRASARANA
LRT JABODEBEK

MANAGEMENT CONSULTANT

ENDORSED BY

NAME POSITION DATE SIGNATURE

03 DETAIL - 03 R. MANAI
PROJECT
MANAGER
SKALA DEPUTY
A. RAHMAT PROJECT
MANAGER

APPROVED BY

CONSTRUCTION
J. SARRE
MANAGER

YOSHIRO MIKI Station Expert


Steel Structure
LEE KUANG JIE
Expert

TERUYUKI MORITA Super Structure


Expert
GRAHAM S. HARRINGTON Civil Expert

K. M. SEMBIRING
ENGINEER

03 BURHANNUDIN ABDUL

CONTRACTOR DESIGN & BUILD


033

PT. ADHI KARYA (Persero) Tbk.


RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA

3B 26-11-2021 ADJUSTMENT DED DRAWING

3A 08-09-2021 APPROVAL DRAWING

REV DATE DESCRIPTION

ENDORSED BY

NAME POSITION DATE SIGNATURE

02 DETAIL-04 ARDIANSYAH ASIZ PROJECT


29-11-2021
SKALA MANAGER

CHECKED BY
PROJECT
HENDRYAN ENGINEERING 29-11-2021
MANAGER
DRAWN BY

ARRAZQA DION FADILLAH DRAFTER 26-11-2021

PROJECT
A8 LEGEND :
INTEGRATED LIGHT RAIL TRANSIT/LRT
TRAIN DEVELOPMENT IN JABODEBEK
CROSS SERVICES 02 CAWANG - DUKUH ATAS

D SECTION - D
SKALA DED REFERENCE NUMBER

SHOP DRAWING STEEL STRUCTURE


DRAWING TITLE

KUNINGAN STATION
CHECKED BY
ACCESS BRIDGE #2
SECTION D, DETAIL 03
PT. ARKONIN PT. ADHI KARYA
& DETAIL 04
FIELD SIGN DATE FIELD SIGN DATE

PROJECT MANAGER 27-11-2021 MANAGER ENG 27-11-2021 SCALE SIZE DISCIPLINE REVISION NO.

ARSITEKTUR ENG 27-11-2021 ARSITEKTUR ENG 27-11-2021 1:50, 1:20 A2 STRUCTURE 3B

STRUKTUR ENG 27-11-2021 STRUKTUR ENG 27-11-2021 DRAWING NUMBER DATE

MEP ENG 27-11-2021 MEP ENG 27-11-2021 LRT-CV-ST-DW-L2-STKN-JPO-C2-033 26-11-2021


NOTES :

EMPLOYER
MINISTRY OF TRANSPORTATION
DIRECTORATE GENERAL OF RAILWAYS
DIRECTORATE OF RAILWAY INFRASTRUCTURE

BB1 BB3 BB4 B BB5

Karya Building 11th Floor


Medan Merdeka Barat Street No.8, Jakarta 10110
NOTICED BY

NAME POSITION DATE SIGNATURE

E FERDIAN SURYO A.P


NIP. 19800215 200712 1 002
P.P.K.
PEMBANGUNAN
PRASARANA
035 LRT JABODEBEK

MANAGEMENT CONSULTANT

A5 ENDORSED BY

NAME POSITION DATE SIGNATURE

PROJECT
R. MANAI
MANAGER
DEPUTY
A. RAHMAT PROJECT
MANAGER

APPROVED BY

CONSTRUCTION
J. SARRE
MANAGER
F YOSHIRO MIKI Station Expert

A6 035 LEE KUANG JIE


Steel Structure
Expert

TERUYUKI MORITA Super Structure


Expert
GRAHAM S. HARRINGTON Civil Expert

K. M. SEMBIRING
ENGINEER
BURHANNUDIN ABDUL

CONTRACTOR DESIGN & BUILD

CONCOURSE LEVEL PLAN


PT. ADHI KARYA (Persero) Tbk.
3 KUNINGAN STATION ACCESS BRIDGE #2 PARTIAL 3

SP
RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA
SKALA

0000
XXX
3B 26-11-2021 ADJUSTMENT DED DRAWING

3A 08-09-2021 APPROVAL DRAWING

REV DATE DESCRIPTION

0000
XXX
ENDORSED BY

0000
XXX
NAME POSITION DATE SIGNATURE

ARDIANSYAH ASIZ PROJECT


29-11-2021
MANAGER

CHECKED BY
PROJECT
HENDRYAN ENGINEERING 29-11-2021
MANAGER
DRAWN BY

ARRAZQA DION FADILLAH DRAFTER 26-11-2021

PROJECT
LEGEND :
INTEGRATED LIGHT RAIL TRANSIT/LRT
TRAIN DEVELOPMENT IN JABODEBEK
CROSS SERVICES 02 CAWANG - DUKUH ATAS

DED REFERENCE NUMBER

SHOP DRAWING STEEL STRUCTURE


DRAWING TITLE

KUNINGAN STATION
CHECKED BY ACCESS BRIDGE #2
PT. ARKONIN PT. ADHI KARYA SLAB PARTIAL #3
FIELD SIGN DATE FIELD SIGN DATE

PROJECT MANAGER 27-11-2021 MANAGER ENG 27-11-2021 SCALE SIZE DISCIPLINE REVISION NO.

ARSITEKTUR ENG 27-11-2021 ARSITEKTUR ENG 27-11-2021 1 : 75 A2 STRUCTURE 3B

STRUKTUR ENG 27-11-2021 STRUKTUR ENG 27-11-2021 DRAWING NUMBER DATE

MEP ENG 27-11-2021 MEP ENG 27-11-2021 LRT-CV-ST-DW-L2-STKN-JPO-C2-034 26-11-2021


NOTES :

05
035

EMPLOYER
MINISTRY OF TRANSPORTATION
DIRECTORATE GENERAL OF RAILWAYS
DIRECTORATE OF RAILWAY INFRASTRUCTURE

Karya Building 11th Floor


Medan Merdeka Barat Street No.8, Jakarta 10110
NOTICED BY

NAME POSITION DATE SIGNATURE

P.P.K.
FERDIAN SURYO A.P PEMBANGUNAN
NIP. 19800215 200712 1 002 PRASARANA
LRT JABODEBEK

MANAGEMENT CONSULTANT

A5 A6 E SECTION - E P250
SKALA

ENDORSED BY

NAME POSITION DATE SIGNATURE

PROJECT
R. MANAI
MANAGER
DEPUTY
A. RAHMAT PROJECT
MANAGER

APPROVED BY

CONSTRUCTION
J. SARRE
MANAGER

YOSHIRO MIKI Station Expert


Steel Structure
LEE KUANG JIE
Expert

TERUYUKI MORITA Super Structure


Expert
GRAHAM S. HARRINGTON Civil Expert

K. M. SEMBIRING
ENGINEER
BURHANNUDIN ABDUL

CONTRACTOR DESIGN & BUILD

PT. ADHI KARYA (Persero) Tbk.


RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA

F SECTION - F
SKALA

3B 26-11-2021 ADJUSTMENT DED DRAWING

3A 08-09-2021 APPROVAL DRAWING

REV DATE DESCRIPTION

BB5 BB4 ENDORSED BY

NAME POSITION DATE SIGNATURE

ARDIANSYAH ASIZ PROJECT


29-11-2021
MANAGER

CHECKED BY
PROJECT
HENDRYAN ENGINEERING 29-11-2021
MANAGER
DRAWN BY

ARRAZQA DION FADILLAH DRAFTER 26-11-2021

PROJECT
LEGEND :
INTEGRATED LIGHT RAIL TRANSIT/LRT
TRAIN DEVELOPMENT IN JABODEBEK
CROSS SERVICES 02 CAWANG - DUKUH ATAS

DED REFERENCE NUMBER

SHOP DRAWING STEEL STRUCTURE


DRAWING TITLE

KUNINGAN STATION
CHECKED BY ACCESS BRIDGE #2
PT. ARKONIN PT. ADHI KARYA SECTION E & F, & DETAIL - 05
FIELD SIGN DATE FIELD SIGN DATE

PROJECT MANAGER 27-11-2021 MANAGER ENG 27-11-2021 SCALE SIZE DISCIPLINE REVISION NO.

ARSITEKTUR ENG 27-11-2021 ARSITEKTUR ENG 27-11-2021 1:25, 1:10 A2 STRUCTURE 3B


05 DETAIL - 05 STRUKTUR ENG 27-11-2021 STRUKTUR ENG 27-11-2021 DRAWING NUMBER DATE
SKALA
MEP ENG 27-11-2021 MEP ENG 27-11-2021 LRT-CV-ST-DW-L2-STKN-JPO-C2-035 26-11-2021