R00000.00-DR-384 - Daily Report (07-May-2022) (12649)

You might also like

Download as pdf
Download as pdf
You are on page 1of 23
jsSeaslad van bia REGEC ARAL! Daily Report No: R00000.00-DR-384 Date: 07 / May / 2022 Weather Condition: Clear Project: Lusail Security Complex ‘Owner: Public Work Authority (ASHGHAL) 4+ Contractor / Sub-Contractors: 4-1 Contractor: Al-Aali International Temperature Degree: 28.4° Employee Staff: 2- Manpower on Site Ne. Title ee x pie: “ne 4 _| Project Manager 4 Chargehands 4 2_| MEP Manager 1 Carpenters Ls 3. | Consiucton Manager 1 Carpenter helpers 3 4 _| Technical Manager 1 Scaffolders 32 5 | stakehotcer 1 Stl Fikors 2» 6 | Gcengneer 2 ‘Masons @ 7_| aS Engineer 4 Helos 220 @_| Planning Engineer 2 Survey Helpers 2 @| Technical Ofce Engnoers 2 Equipment Operators 40_| Chi Ste Engineers 2 Ske Eletican 2 44_| ElecincalEnginears 2 Plumbers 6 42_| Mechaneal Enoinoer 2 Elecrilans 101 [43 | iM manager ah ‘AC Technicians 52 [44 [a1 coordinator 1 Bak work (SubEon) 10 | 45. | Foremen 6 Plaster work (Subcom) 25 46._| Secretary 1 Painter (Subcom) 25 7_| Draughtsman 2 Weterrooing work 15 48 | Document Conirolor 1 Boundary wal work 10 [FT surveyor 1 False coling work 10 2)_| Store Keepers Helpers 5 Fire hing werk 10 21_| Drivers 4 Porcelain work A 15 2 | Ofie Bays 2 ‘urna windows 10 23 | Time keeper Ee 1 Marble work 5 Sub Total a Sub Total 798. Total 43 Total 796 EGEC-QA-CS-R-410 05-Dec17 Rev. 00 4/23 [ i ny EGEC patel elisa 3- Safety Department: 4. Visitors: Sr 5 Night | Morning or S is Title pen ern aes Title No. | Remarks | HSE wanager 4 2_| HSE Engineer 4 3_| OSE Coorsinator 1 | Nurse 4 5__| Nursing Assistant 1 Perec 6_| HSE Officers 2 7_| Environmental Oficer 1 8 _| biting Supervisor 1 | Safely Crew 10 40. | Secunty 2 14_| Watchman 2 Sub Total 2 2 Sub Total 0 Total 29 Total Total Staffs: 72 Manpower Grand Total: 868 5 Equipment: ‘5-1 Equipment delivered to the site by Contractor: Ser. ‘Type of Equipment Unit | Quant Working Status Remarks jours 4 | Boneat No. 3 10 ‘Active 2 | Fork No. 2 10 active 3 | shower No. 1 10 ‘ative 4 | Mobile Crane No. 1 40 ‘ative 3 | Roller Compactor No. 1 10 ‘ative 6 | sce No. 1 10 active 7_| Excavator No. 2 10 ‘ative 5-2 Equipment delivered to the site by Client: Ser. ‘Type of Equipment Unit | Quantity | working Status Remarks 1 EGEC-OACS-R-10 05-Dec17 Rev. 00 2123, Parry Perrryarey 5-3 Equipment utilized Q EGEC ctor ncta eaten ARAL! Type of Equipment Unit | Quantity | Worle Status Remarks 4 | Bobcat No 5 ‘0 Active On progress 2_| Feri No. 2 10 ‘ative (n progress 3 | shower No 7 70 ative On progress 4_| Mobite Grane No. 1 10 ‘ative (n progress 5 _| Roller Compactor No 1 18 ative On progrens 6 | vce No. 1 ‘0 Active (n progress 7_| Excavator No 2 70 ‘aative (On progress 6- Delivered Material: 6-1 Delivered Material by Contractor: Approval | Storage Description Unit | Quantity | Ret. | ABProval | Storage | Remarks. 4, | None 6-2 Delivered Material by Client: = Approval | Storage s Description Unit | Quantity | Ret. | Approval | Storage 1 Remarks 1 | None 6-3 Material Utilized : E ‘Approval | Storage Ser. Description Unit | Quantity | Ref, | APPFOVAl| Storage | Remarks 4 7- Plant, equipment and tools brought on to or removed from site including hired plant Plant/ Equipment Too! : Storage Ser. ee Unit | Quantity | Ref, | Storage Remarks 1 EGEC-OA-CS-R-10 05-Dec17 Rey. 00 3123, =n EGEC AALI Denar eserves The Boot ictaanrenconcm acre ZGRA FERRARA, 8- Working Activities: Location % of Ser Activities Block Poor oe Status wok lone FIRE STATION BUILDING: ZONE 1 1 | Block Work-Parapet-Part02 | Fire Station Building Ongoing | 60% 2__| Plastering Work Part Fire Station Building | —_FF Ongoing | 05% 3-_| Plastering Work Part Fire Staion Building | __ SF Ongoing | 20% 4 | Plastering Work Part2 Fire Station Building | FF Ongoing | 80% 5_| Plastering Work Part2 Fire Staion Bulding | SF Ongoing | 60% 6 | Screed work ~ Part 2 e ‘SF ‘Ongoing 7__| uae preparation forsee | Fre stauonauning | __SF Ongoing a | Surface preparation for plaster | Fir Staion Bullaing | External Ongoing | 80% 9. | Sues PePaaIONTOTPISIS= —TFrestaton ung | SF oeaand 40 | Plaster work Part 1 External Ongoing | 40% 11_| Painting work ~ Part 1 (stucco) GF a Ongoing 60% 42_ | Painting work Part 2 (stucco) or Ongoing | 60% 13 | Painting work - Part 1 (stucco) Fire Station Building FF | ‘Ongoing 60% 414 | Painting work-Part2 (stucco) | Fire Station Building Ff Ongoing 45. | Painting work—Partt-Texture | Fire Staion Bulling | External Ongoing | 50% 16 | False ceiling work ~ Part 1 Fire Station Building OF ‘Ongoing 47_| False cling work Part ing | FF Ongoing 18 | False ceiling work - Part 2 ling = ‘Ongoing 19 | False ceiling work ~ Part 2 Fire Station Building FF 7 7 ‘Ongoing 20_| Porcelain work Part 4 Fire Station Bulling | GF ongoing | 21 | Porcelain work-Part2 Fire Station Building | GF Ongoing 22_| Porcelain work Part 2 Fire Station Building | __ FF Ongoing | 30% Bag) Soe erator Fire Station Bulding | _ Rooftop Ongoing a | Cable paling for ACS Fire Staion Bullng |p Srgaing 25, | Cable paling Yor BMS Fire Staion Baling | pp Gnecing | osx, 25. | Cable paling for Telecom & CCTV | Fire Station Buling | pp ‘rgoing | — 70% ar | Beatie rooms Fire Staion Buling | gr ‘oneeing | a5 25 | Eialie rooms Fire Staton Building |p ‘Grgoing 29 | Beatle rooms Fire Staion Bulling | gp ‘necing 3p | TOF ream Fire Staion Bulling |g ‘ongoing | pox, a1 | DF rooms Fire Staion Bulla |p ‘racing = | WF eons Fire Staion Bullaing | gp ‘reaing 23 | Mechanical Draege work rat waa inang | eam Season | 34 | Mechanical Drainage Work Fire Staion Bulking | __FF Onacing | 71% 35, | Mechanical Chiled Water Fire Station Bulling | FF Ongoing | 71% EGEC-QA-CS-R-10 05-Dee-17 Rev. 00 4123 om (&Y EGEC Seale epLatialy bbe AAL! 36, | Mechanical Fire Fighting Fite Station Building |___GF Ongoing | 71% 37 | Mechanical Chiled water Fire Station Building | __GF ‘Ongoing | 70% 38 | Mechanical Fire Fighting Fire Station Building | 1F ‘Ongoing | 74% 29. | Mechanical chilled water Fire Station Building oF Ongoing 68% 40_| Mechanical Fire Fighting Fire Staion Building | 2F Ongoing | 76% eee tiatan a2 SS | Fire Station Buitaing GF Ongoing ah 42_| Mechanical WallChipping EWS [ie stavon uiding | __FF Ongoing | 0% 43_| Mechanical Water Supply Works | Fire Staton Building | GF Ongoing | 85% 44 | Mechanical Water Supply Works | Fire Station Building | FF Ongoing | 8% 45 | Mechanical Water Supply Works | Fire Station Building | SF Ongoing | 3% 46 | Drainage works Fire Station Building | __ GF Ongoing | 85% 47_| Mechanical externa storm water _| Fite Station Building Ongoing | 90% SR instalation of AC ducts Fire Station Building | pp Ongoing Installation of ventilation ducts eae FF nee PREVENTIVE SECURITY BUILDING: ZONE 1 50, | Surtae preparationfor laser | Prvenlveseeurly | eyamat Ongoing | 70% 1 | Proster Work Preventive Seem) | extemal Ongoing | 60% EE ravens tame Pema | or eeaal | Le $3_| Panna work- swoco raven Seu") | pp Ongoing | 00% 54 | Painting work-stucco Preventive Seeuiy | ae Ongoing | 60% 55 | Painting work Texture raven S077 | Exar Ongoing | 5% 36) | Fase caling work Provenuve Security | gr Ongoing 57_| False celing work Prervoliee Beato, | Fe Ongoing 8 Fatee cling work ava SEY | Ongoing 39) | Porcelain work Proventve Secuniy |g ‘Ongoing | 20% @0_ | Porcelain work Preventive Seauriy [ Fp Ongoing | 40% 61_| Surace preparation forwaterproot | Preventive Securly | Rooftop Ongoing | Cable pulling For ACS revenue Saaurly | ge ‘necing 63. | Mechanical - Drainage Work reve | Ongoing | oH G4 | Mochanical- Drainage work | ‘Proventve Security | op Ongoing | 65% os. | Racha WaTcHppne BPne | Prva SHCIRY | gp Gace 8) | Mechanical water auppty works | Preventive Seeuily | op ongoing | 65% 67_| Mechanical water supply works | Preventive Seeuriy | Fp, gp Ongoing | 85% 8 | Mechanical Fire Fighting ee ae ‘Ongoing | 78% 69. | Mechanical Fire Fighting Proventive Security | Fe Ongoing | 78% 70_| Mechanical Fre Fighting Provenive Seeuriy | ap Onocing | 7% 71_| Mechanical Ghitlea Water Femi ae ara ‘ongona | 77% EGEC-OACS-R-10 05-Dec-17 Rev. 00 5/23, Mase ata ns Sys obatal SERAD ERORTERAE chanical Ghnea water i=F | Preventive Secu : 72. | Mechanical Chited Water Fi ns oF Ongoing | 70% 73_| Mechanica Water Suppiy Provenve Seri | ap ongoing | 77% Mechanial Wall Chipping & Pipe | Preventive Securiy = 74 | Installation Bldg. Lian Ongoing am ‘GUARO HOUSE:2: ZONE 1 Ze | Cable paling for ACS Guard House fe ‘Ongong Fe. | Cable paling YorTotecom & CCTV | Guard House ‘Ongena 77_| Mechanical Water Suppiy Guard House Ongoing | se ‘SUBSTATION: ZONE Guard House ae 78. Painting work Stucco ue oF Ongoing | 90% ‘Accommodation 78. | Painting work Stucco om Fe Ongoing | 90% ‘Accommodation 80, | Painting work Stucco feos sF Ongcing | 90% ‘Aeconmodaon 81. | Flee celing wore Accor oF Ongoing | 18% ‘Accommodation 82 | False coling work Accor Fe ‘Ongoing | 15% ‘Accommodation 33) | Feteecoting work barrett oF Ongoing | 18% ccomnmodaToR 34 | Porcelain work cocoon oF Ongoing | 60% ‘Aeconmodaon 85 | Porcelain work a Fe Ongoing | 0% ‘Accommodation 28, | Porcelain work scoot SF Ongoing | 60% Aeconmodaton 87 | Fixing aluminum window frames | Aceon oF Ongoing | 90% ‘Accommodation 88 | Fixing sluminumwindowtrames | Accamm FF Ongoing | 90% 28 | Fixing aluminumwindow trames | Actammodaton SF Ongoing | 90% ‘Surface preparation for ‘Accommodation meres pens 90 | waterproofing building Risotto Cage ble pal Tor ACS ‘Accommodation ‘ong6Ig ot building = — ©2 | Mechanical Fire Fighting trix | Aceammodaton oF Ongoing | 08% ‘Accommodation: oe ‘Mechanical Fire Fighting building = Ongoing = | Mechanical Fire ing nn gee goin, 94 | Mechanical Fir Fighting aan oF Ongoing | 60% 95 | Mechanical Chilled Water Aeccuimoaaton oF Ongoing | 80% ‘Accommodation 96 | Mechanical Chea Water | Asgom 1F Ongoing | 81% ‘Accommodation 97) | Mechanical drainage work = Extemal Ongeing | 0% Mechanical drainage fst Assormrodation oF Ongoing | 9% 98 | Mechanical Drainage Work Accommodaion SF Ongoing | 89% 400 | Mechanical water supply eel or Ongoing | 05% 401 | Mechanical water supply ‘Accommodation FF Ongoing | 98% | Mechanical Drainage & Water ‘Accommodation - oe 102 Supply Installation in Wall building he Ongoing bai 103 | Mechanical water supplyinwa__ | Aggommodaion FF Ongoing | 05% 704) | mechanical wator supply decommodalt SF Ongoing | 02% EGEC-QA-CS-R-10 05-Dec-17 - Rev. 00 923 vee gata ne a EGEC eisai = oa ARAL! Teal] ae Siping earings an Resooaion -F Ongoing | orm 100 | CHW pie insulation fararmotiion oF ongsing | esx 107 | CHW pipe insulation fesmnmodeton FF Onasing | oox 408 | installation of ventilation duet | Aczommodation 7 Oraoing | osx 109 | istaition of FO fecommodaton ‘onscing | sex 40 | ieulaion ved oconmodeen onacing | eax 112 | rw pipe insulation 7 * ‘onacing | sen WORKSHOP BUILDING: ZONE 2 118 | Plaster work Workshop Bulag | _ eterna Ongong | 0% 7A | suraceproparaon tor pater | Worksop uing | _ externa Orgone | 40% 416 | Patntng work- Texture Workshop Bung | _ External Ongoing | 40% 716 | Instaation of oyfoam Workshop Bung | _ Rooftop Ongoing | 20% 417 | Water leak test Workshop Building | Upper roof Ongoing 99% 118 | Fixing insulation tam Workshop Bung | _ Rooftop Ongoing | 05% sng | Cable pling fr ACS Sananer eae | ae os a | Cie pang Tor BS Workshop Bulag | ee Sei a, a4 | lo pling for Toacon ECCT | Workaop Bulag | ge is — yg 72 | Wectorical water eupply work | Workshop Buling Ongcing | 4% 428 | Mechoncal re ging work | Workehor Bulding Onacing | 4% 72 | Mechanical hited water work | Workshop Buldng Ongoing | 8% GUARD HOUSE-1: ZONE 2 125 | Plaster work Guaravowse | tntema ongoing | tem sag | Cale pling TOFACS Guard House Sia san | Cae pang TOTES Guard House onaog sae | Cae paling Tor Taecom ECCT | — Giar Wouse a FE ocharca cranoge wore Genrd owes _| Cinder Ongoing | 88% 130 | Mechanical water supply works Fi Guard House ‘Ongoing 31% POLICE STATION BUILDING: ZONE 3 482 | Paing work- Stucco oles Staton or Ongeing | 75% 498 | Paitng work Stucco Folios Staton F Ongoing | 75% 134 | False ceing wrk rata oF Cagcig BE Fig duminumviniowtames | _Palce sexton or Ongoha 496 | Fring auminum windowtames | Police Siaton fF nacing 437 | instalation of peyfoam oice Staton | poottop ach 188 | Porcelain work Poles Sion or Ongoing | 55% EGEC-AACS-R-10 05-D90-17 Rev. 00 7123 Q EGEC mise ayia bb cn] RAL! Police Station = Tiel Porcetan work ea ga FF oneeing | 0% 1 | Watrproot membrane —iratiner | PoFC@ SiC Roortap ongoing | 80% 14 | War eakage test coop Paice sate Rootiop Ongeing | _ 80% Cb paling for ACE Potee Staton aa ee: Building * ab paling Or ENS Pat Sato ay ae Building rF 98% 444 | Mechanical Drainage Works Fate atom | extemal Ongeing | 88% 145 | Mechanical Drainage Works Potce siaon oF Ongoing | ae nr Batce Sston rae arenas she ea Sn FF Ongoing | 78% itecanial ie sialon Wai} — Pots Staton = 147 | for W.S & Drainage Building | » tegen om 148 | Wall chipping for drainage pipes Fotos Station Ongoing 99% 149 | Wetor Suppy First Fc ae | ase ongora | 82% 150 | Mechanical Chited Water Fate siaion oF ongoing | em 481 | Mechanica! Child Water Foes Siaton 1F ‘Ongoing | 22% Hchanial Fe Fghiing Pipe alc siaton aa 152 | installation Building * | Oseetng oe Police Station T 159 | Mechanical Fe Fighting ce sa F Ongcing | et ‘Mechanical Water Supply Pole Station e rons 154 | installation. Building or Ongotes ee oo Palcesiaton ro Fighing Fit Fx ee sat oF Ongoing | a0 16 | Weer Supp Wal Chipping Fate siaion °F Ongoing | 94% 457 | Duct supporting Fale sition * ‘onscing | awn 458 | instalation of AC dct Potce sion oF onaeing | aan Pace sation = nao 159 | insuaion veo ee sat 70% 160 | instalation of ventilation duct Pate siaton oF onseing | aa 484 | inetalation of vention duct Pate siaton F Onasing | ane atceSaton Ono 162 | rw pie sutton ie iat oh 188 | Duct support xing Pate Saton Onacing | eax DRILL TOWER: ZONE 3 1 sl DarTower | Eternal Ongoing | 70% 105 | surace preperation for paster Dri Tower oF ieee 466 | Prasor work ori Tower oF Ongena | 88% 10 | Plaster work britTower | External Ongoing | 80% 488 | Paitng work DritTower | extemal ongoing | atm Fear work DriTower oF ope Bo surace pepnatontorwatenrcot | __orTower | upper root ongoing 171 | Firefighting pipe instalation Driltower Ongcing | 70% ara | Cable paling or ACS rower = apie aga Cable ping Tor BNE ower - a ae ara | Cable paling Tor Teaco & GoW} Drone _ oe 0% EGEC-A.CS-R-10 06-000-17 Rev. 00 8123 Q EGEC paola ot alenly bee RAL! GUARD HOUSE-3 175 | Surtace preparation for plaster Guard House | _tnteral Ongoing 176 Wire paling oright and | Guard House ‘ngeing | soy, 477 | Cable pulling for fire alarm Gerdieees Sao 90% Ae | Coble puna for pubic attiess | OUeMTHOURE ‘onesie | com 479 | Cable pling for ACS Gaara House Ongoing 420 | C2816 pling or BUS Guard Hoe ‘ongorig | oom er | Cable paling Tor Telcom BCC | Guard House ‘ongoing 482 | Mechanical water supply works ‘Guard House Ongoing | 6% BOUNDARY WALL 493, | nstaling footing offence, Beams | Boundary wall Ongoing | 85% 404 | Fixing seo once Boundary wall Ongoing | 60% PUMP ROOM 4 485 | Surtaco proparation for plaster Pump Room 4 ‘ngeing 4186 | Surface preparation forwaterpoot | Pump Room’ Ongoing a7 | Cable paling for ACS Pump Room ‘onacing qae | Cable paling Tor BMS Pump Room oF nga sae | Cable paling Tor Tolecam ECCT | — Pump Room = Ongoing PUMP ROOM 2 190 | Surface preparation for plaster Pump Room | Internal Ongoing 191 | Surface preparation for plast | Pump Room 2, External ‘Ongoing az | Eekesl=Wire pug origand | Porp Roomz ‘ongoing | Foy, 193 | Cable pulling for fire alarm Papas ar bail 194 | Cable pulling for public address: Pump Room 2 ae 70% | os | Cable pling TorACS Pammp Roam ongoing os | Cable paling or BMS Pump Room? ‘ong0%g sor | Cable paling Tor Telecom & CCTV | — Pump Room ‘ongoing | — pom ‘COMMUNICATION ROON 498 | Surface preparation for plaster Communication | internat Ongoing 490 | Plaster work Communication” | External Ongoing | 5% 200 | Painting work Texture Conmaniertion” [extemal Ongoing | 0% zo | Esesl=Vire bg TGR an |— Communicator an 202 | Cable puling for Fre alarm Sommentorton Onacing | 80% 203 | Cable pulling for public address Senso tt Ongoing oe Joa | Cable paling Tor ACS ormreston org gos | C2000 pling Tor BUS armreton ‘Ong os | Cae pling Tor Telcom & COTW | Carman ora | ao | ETS. ROOM | EGEC-OACS-R10 05-Dee-17 Rev.00 9123 om” (Y EGEC saan Bea AAL! 4023 207 | Surface preparation for plaster ETS Room Internal Ongoing 99% 208 | Plaster work ETS Room External Ongoing 208 | Plaster work ETS Room Internal Ongoing oe ao | Electrical Wire paling ori ETS Room ‘Ongoing wm power, 211 | Cabie pulling for fre alarm Be ‘Ongoing 80% 242 | Cable pulling for public address ron ‘Ongoing 90% 213 | Cable pulling for ACS ETS Room ‘ongaing 214 | Cable palling for BMS ; ETS Room Ongoing 215 | Cable pulling Tor Telecom & COTV ETS Room ‘Ongoing =" CAR PARK SHADE 246 | Casting footing Car park shade Ongoing 40% EXTERNAL WORK Waterproofing for wail (membrane- a ies ‘Storm Water tank 4 Ongoing 95% 218 | Waterproofing for wall ‘Storm Water tank 2 Ongoing 60% 219 | Back filing ‘Storm Water tank 1 Ongoing 220 | Back filing Storm Water tank 2 Ongoing 224 | Fixing eurbstone External Works ‘Ongoing 15% 222 | External light External Works. Saueinns 40% 223 | extemal ELV External Works ‘Ongoing 30% 224 | Extornal power cable External Works Ongsing 9. Expected Working Activities Tomorro zi Location Acts Block Floor, Zone Sane FIRE STATION BUILDING: ZONE 4 Block Work -Parapet Fire Station Building Ongoing 2 | Plastering Work Part | Fire Station Building FF Ongoing 3. Plastering Work ~ Part | Fire Station Buliding | SF Ongoing 4 | Plastoring Work ~ Part2 Fire Station Building FF Ongoing 5 _| Plastoring Work Part2 Fire Station Bullding | SF Ongoing 6 | Screed work Part 2 Fire Station Building | SF Ongoing 7 _| Surfers preparation fr BAST | re station Bulldng | __SF gona ‘Surface proparation for plaster : yg) Suriace prepara Fire Station Building | _Extern: ‘Ongoing | Surface preparation for plaster 9 Surface prep a Fie Station Bung | _ SF ‘oraoho [40 | Plaster work —Part 1 Station Building | External Ongoing 41 | Painting work Part 1 (stucco) Station Building | GF Ongoing EGEC-OA-CS-R-10 05-Dec-17 Rev. 00 EGEC cetera opdserl bb end RAL 11123 12 | Painting work - Part 2 (stucco) Fire Station Building or | ‘Ongoing 43. | Painting work—Partt (stucco) | Fire Station Bulléing | FF ‘Ongoing 44 | Pointing work—Part 2 (stucco) | Fire Station Building | __-FF Onaeing 45. | Painting work—Port Texture | Fire Station Building | _ External ‘Ongeing 46_| Fase celing work Part Fire Station Bulaing | GF ongeing 47_| False eelling work Part 1 Fire Station Building FF Ongoing 478 | False caling work Pant 2 Fire Station Bulding | __ OF Onosing 49__| False colling work Part 2 Fire Station Building | ___FF Ongoing 20 | Porcelain workPart 1 Fire Station Building | __ OF Ongoing 21 | Porcelain work Part 2 Fire Station Building oF Ongoing 22 | Porcelain work ~Part 2 Fire Station Building FF a Ongoing 23_ | Surace preparation for Firestation Buiaing | _ Root op Ongeing 2a Gable pulling for ACS Fire Staion Bulldng | pp Ongoing 25 | Cable palling Tor BS Fie Staion Bulaing | pr Ongar 25 | Cable pulling for Telecom & CCTV | Fir Staion Bulling | pr ‘Ongaing ay | Ehetie room Fie Staion Balding | ge ‘Onacing 2a | Fletrierooms Fire Station Bulding | pp ‘Ongar 7p | Elsie rooms Fie Sialon Building | gp ‘onesie 30 | DF rooms Fie Station Bulling | gp ‘Ongar 31 | DF rooms Fire Station Building = ‘Ongoing 32 | DF rooms Fie Staion Bulling | 5p ‘reaina 33. | Mechanical Drainage work Fire Station Bulding | _ External ‘Ongoing 24 | Mechanical Drainage Work Station Bulaing | __ FF Ongoing 35, | Mechanical hitea Water Fire Staion Bulding | __FF Ongoing 36. | Mechanical Fire Fighting Fire Station Building | GF Ongoing 37 | Mechanical Chilled water Fire Station Building GF Ongoing 38 | Mechanieal Fire Fighting Fire Station Bulging | 4 Ongoing 36_ | Mechanical chit water Fire Station Bulaing | __2F Ongoing 40_| Mechanical Fire Fighting Fire Station Bulaing | __2F Ongoing a1 | Mechanical wal CHerPg&WS | rise Staton Buicing | OF Ongoing | 12 Mechanical Wal Chipping WS | Fre saion Buicing |__FF Ongoing 43 | Mechanical Wat Supply Works | Fire Station Building | _GF Ongoing 44 | Mechanical Water Supply Works | Fie Station Bulding | FF Ongoing 45 | Mechanical Water Supaly Works | Fite Station Building | SF Ongoing 46 | Drainage works Fire Station Bulcing | GF Ongoing 47 | Mechanical extemal storm water | Fire Station Building “Ongoing 48 | Installation of AC ducts nw FF ne 49 | installation of ventilation ducts Cee ey FF Boaeina ‘PREVENTIVE SECURITY BUILDING: ZONE 4 EGEC-OACS-R-0 5 Dec7 Rev.00 Ea Sqft EGEC aeasial optaisany bie at ARAL! Fava | par = 3 | surtace preparation or plaster was Evora ongoing eg : | Plster work og, External Ongeing vane Soo con $2 Painting work- Stucco ye or mooi aa Fine ea = 58_| Paimtng work Stucco sg. fF Ongeing Frito baa ion S| Painting work Stucco me oF Ongeina Frere Seam ar 35 | Patnng work- Texture ive external ogg ee — $6. | Fase caing work zs oF Ongeing vente Scary 51 | Fase eaing work [Pei FF Ongena | ravete Sacariy — | Fae coling wor | Fenn. oF Ongeing Be Porcatan work Preventive Scuriy | ge meee 1 Fiaeas Soa “ae FP orcntan work [ Pventve FF Onecine 6 | Surtaceprparaton tor watrproot | PPO=TINE SSSI | Root top To 2 Cable pulling or ACS Preventive Secuily | gg ‘Ongoing is From saa oe 8_| Wecharieal Drainage Work ive 1 Onecina 64 | Mocharcal—Dramagework | Prevenuve Secumty | ap egsog Wechavial Wal Chipping & Pipe | Pravenve Soca = $5 installation Bldg. = Ongoing Frvantve Soar 66 | Mechanical water supply works: ‘Bldg, y GF Ongoing Franti Sain =o FS octarca water aupnly works oh Fr oF Ongoing = Freventve Seay ae 68_| Mechanical Fire Fighting is oF Ongoing a oe eb 68_| Woche Fire Fighting ves fF Ongoing Fraentve Soca a 70. | wecharca Fre Fighting ves 2 — : Frei SOF mnt Tt Mechanical Chie Water wes rar Ongoing ai aan 72_| Mechenical Chile Water Fix ves oF ongoing Frente Seciy —s 73 | Mechanical Water Supply Bldg. SF ongoing Mechanical Wall Chipping & Pipe | Preventive Security iat 74 installation Bldg. - Ongoing GUARD HOUSE-2; ZONE 1 Fe ale puna for ACS Guard Rouse 7 nae | Cie pling or Toacon COW | — Guar Tones aaa 77 echareal Water Supsy earl ego SUBSTATION: ZONE 1 Guard House ACCOMMODATION BUILDING: ZONE 2 SaaS 7 | Paining work-Stweco | aga or enor : eam 7B. | Paining work Btucco i | xr enema | aiming work Stueco balan oF =< } — Er Acco or digoing : oc | Fao cating work Accor F ahaa EGECOROSR 0 Wee? ev. 00 12123 REGE Cc Cesial eyLtbaly bbc ARAL! £3, | False celling work pene net SF Ongoing 84 | Porcelain work Egeomootaton oF Ongoing 85, Porcelain work analog FF ‘Ongoing 80. Porcelain work = (ean iien SF ‘Ongoing 87 | Fixing aluminum window frames | Acrommodation oF ‘Ongoing 88 | Fixing aluminum window frames | Actommodation FF ‘Ongoing 89. | Fixing aluminum window frames | Acrommodation SF Ongoing oo_| Sue igpaaion Aeconmoaator ene ohana 1 Cable paling for ACS feconnaaion = Onesing $2 | Mechanical Fire Fighting Fix | Actommodation oF Ongoing 63 | Mechanical Fire Fighting aan 1 Ongoing 84 | Mechanical Fire Fighting ne 2 Ongoing 95 | Mechanical Chied Water pegmenion oF Ongoing 96 | Mechanical Chiea Water Accommodation 1 Ongoing 7_| Mechanical arainage work fecrrnccaton Extemal Ongoing 98 | Mechanical drainage fist fix Snmeeeten GF ‘Ongoing 99 | Mechanical Drainage Work facuneseton SF Ongoing 400 | Mechanical water supply jemstion oF ‘ongoing 401 | Mechanical water supply nal FF Ongoing 402 | Sippy istafotonmn Wall | bulging bal Ongoing 4103 | Mechanical water supply in wal | Ageammodation FF ‘Ongoing 4104 | Mechanical water supply feeenoeetel oF ‘Ongoing 405 Wal chipping for drainage end fecommodaton ie nag 408 | CHW pipe insulation frill oF Onacing 107 | CHW pipe insulation Accommodation FF Ongoing 4108 | instalation of vonttion auet__| Accammedsfon 7 Ongoing 409 | Installation of FO oa oF Ongoing 410 | Insulation VoD eens bal re BT cocoate [essonneanion =F Onasing 112 | CHW pipe insulation fegamnecten SF Onacing (WORKSHOP BUILDING: ZONE? 113 | Plaster work | Workshop Bull External Ongoing 414 | Surtace proparaton for plaster | Workshop Bul External Ongoing 115 | Painting work- Texture Workshop Building | _ External Ongoing 416 | Installation of polyfoam Workshop Building | Rooftop Ongoing 117 | Water leak test Workshop Building Upper roof ‘Ongoing | 418 | Fixing insulation foam Workshop Building | Rooftop Ongoing EGEC-OACS-R-10 05-Dec-17 Rev. 00 13/23 GEC EGEC cal ARAL! Fa ae ranger AOS Warp Buking | op aa a9 | able paling Tr BS Woriarep Balaing| —gp ongoing “124 | Cable palling er Telecom & COTV | Workshop Building Be Gagoing 722 | Mechanical water sappy work | Woop Bung Ongoing 723 | Mechanical tre igming werk | Workshop Butaing Ongoing 424 | Mechanical Chile water work | Workshop Bulg Ongoing GUARD HOUSE-1: ZONE 2 125 | Plaster work Curd House | tntral Ongetng se | Sable paling Tor ACS Guard House Ongoing say | Sable lng Fr BS Guard House ‘Ongena sae | Cable paling ar Ttoson 8 COTY | — Guard House ‘Onger9 12, | wechanicaarainage works uous | Undegrount Onecing FE echenca water supe worn | urd House ongoing POLICE STATION BUILDING: ZONE 3 Paice Siaon 134 | Plastr work fe Si fF Ongoing alice sation 782 | Painting work Stucco ee iat or ongong | 188 | Painting work- Stucco Fale sition °F ee Police Station 7 134 | Fase caing work ce tt oF ‘necng ace siaton 135 | Fing aluminum window ames ice stat oF ‘ongoing ace Staton Een ie it °F : Ongcing 48 | instalation of pyoam Paice Staion | Rooftop Oneeing ace Staion 136 | Porcelain work ce Stal oF asin Paice staan 129 | Porelin work ice iat fF Ongeing 140 | Waterproof membrane atiayer_ | _Poeestaton | Rootiop ont otce Salon 4 | Water eakage test rooftop easton | Rootton Ongoing Gabi paling or ACS Potce Staton Onging 1 oe Sit F able pling Tor BS otce Staion Ongaig fg Building 7 ce Staion “i | echaneal Drainage Works ce Stat Ester a Fates Staton 14. wechenical Drainage Works Hos Sit or Ongoing ote Staton 146 | Mechanical Drainage Works oe Sit FF eae iecharial Pipe sialon in Wa | Pace Staton at 147 | for WS & Drainage Building, i Ongoing 14 | Wal ctiping or ranage pose Hos Si enc oe Staton 149_| Water Supply First Fk oe Sit ore ‘Ongoing Palce sation 450 | Mechanica hile Water | Potee sit oF — 451 | Mechanical Cited Water os Sit Ongoing techanial Fre Fghing ips Pace Staton a 152 | installation Building =. Seog EOEC-OACS-R-10 05:D00-17 Rev. 00 1423 Q EGEC easel aysoaly-hbe at RAL! 785 | techorcal Fie Fghiing Poles Sion a ‘ang Aechanial Wai Supoiy tee Staton — 154 | installation Building - Ongoing ote Staion : 158 | Fite Flgntng Fret Fix sim | or Onecing 486 | Water Supply Wall Chipping oles sition FF npg Fe osctcampotting Pole tn oF ‘ngcing Fotee sialon e ‘ongoing 158 | instalition of AC act os Sit : AE inounton ven Foe San oF Ongcng 460 | instalation of ventlaton duct Pale sation | Ongoing ace sation 7 onesie 101 | instalation of vention auc =a 462 | CHW pipe insulation Fate sition oF ongeing Pace sation ag 163 | Duct support fixing auitieg FF DRILL TOWER: ZONE 3 Zt 184 | Surtace preparation for pastor DaTower | extemal Ongoing BI crisper pier Dai Tower a ont 186 | Praser work Dri Tower oF Ongeing 161 | Plaster work DritTower | External Ongeing 188 | Painting work DaTower | External Ongoing 460 | Serod work Dri Tower Ongoing BN ccriecepropmeiontorwanprect | _BatTomer | Upperraf Ongcing 474 Fie fghtng pipe instalation Driltower ‘ongoing sa Cable paling or ACS Dil ower 7 es sip Cable paling or Daiower = ongoing ‘4 | Calo paling for Teaco & Co | Dri ower = Hagia ‘SuARO House's 418 | Swtece preparation or pasty | varanouse | intemal ongomng ae | Eletica- Wis paling or Tghtand | Guard Vouse ag ioe 17T | Cable pulling for fire alarm: Guard Howe ‘Ongoing 178 | Cable pulling for public address Ganon ‘Ongoing se 7 Sable lng for RCS Soar House nag ‘| Cable paling fr BS ard Wouse oak sex | Cle pling or Trecon BOOTY | — ara Hause ona 182 "Mechanical water supply works Guard House Ongoing BOUNDARY WALL 7a Msaling otingoffance, beans | Sundar wall ae 484. | Fig sto ionce Banded Ongoing PUMP ROOM 1 788 | Surface proparaion for pastor Pamptonme’ | inna Oning BEBE 2eacnprapercton tor watroct | _ Pump Room | _ Rooftop a EGEC-OACS-R-10 06-0007 Rev. 00 15123 Al perry rere) EGEC aha iley bheeal ARAL! ar |] Cable palling for ACS Pump Room 4 i ‘Onacing “58 | Cable palling for BMS Pamp Room oF onecing {a0 | Cable pling Tor Telecom & COTV | — Pump Room? i Onasing PUMP ROOM 2 4190 | Surface preparation for plaster Pump Reom2 | Internat Ongeina 401 Surface preparation for plaster PumpRoom2 | External Onscing a2 | Electrcal= Wire puling oriightand-| — Pump Room Snecing power, 4193 | Cable pulling for fire alarm Fume Room 2 Ongoing 194 | Cable pulling for public address imme naeen Ongoing “9s | Cable pulling for ACS Pump Ream? ‘Onecing 490 | Cable paling for BS Purp Roam 2 ‘Ongoing “or Gable pulling for Telecom & CCTV | Pump Room? ‘Onecing COMMUNICATION ROOM 4198 | Surface preparation for plaster Communication” | tnternat ‘Ongoing 499 | Plaster work Communication” | External onacing 200 | Painting work - Texture (Communteetion. External Ongoing locivial = Wire paling oright and-| — Communication nosing 20% | power, Room c 202 | Cable paling tor fie alarm Communication Ongoing 203 | Cable pulling for public address | Communication Ongsing pos, | Cable pling for ACS Conimunienn ‘Onacing ‘05 | Cable pulling for BMS orimuniaion ~ Ongoing ane | OT paling forTelecam& CCTV | Communiaton ‘onecing ETS. ROOM 207 | Surface proparation for plaster ETS Room Internat Ongoing 208 | Plaster work ETS Room External Onacing 200 | Plaster work ETS Room Internat Ongoing ao | Eleairical- Wie paling orlightand | E.7-$ Room Ongoing power, 211 | Cable pulling for fire alarm ETS Room ‘Ongoing 212 | Cable pulling for public address ieaeoenl Ongoing Zia | Cable pulling for ACS ETS Room ‘onaoine ia | Cable palling for BNS ETS Room Onsoing 2is | Cable pulling forTelecom& CCTV | E:T.S Room ‘ongoing ‘CARPARK SHADE 216 | Casting footing (ar park shade Onscing [EXTERNAL WORK ar | Waterproofing fr wall membrane~ | siorm Water tank Ongoing 218 | Waterproofing for wall Storm Water tank 2 ‘ongoing 219 | Back fing [Storm Water tank 4 EGEC-QA-CS-R-10 05.Dec-17 16/23, EC cetesial opt saanlly bic RES 220 | Back filing ‘Storm Water tank 2 ‘Ongoing 221 | Fixing curbstone External Works Ongoing 222 | External light Extemal Works Sngeleg 223 | External ELV External Works Ongoing 224 | Extornal power cable External Works Ongoing 10-Inspection: Location Ser. Activities. EIGER tee zone Status | Remarks 4 | None 41- Test Performed i Location Ser. Activities BISE eae zetia Status | Remarks 4 | None EGEC-QA-CS-R-10 05-Dec-17 Rev. 00 17123 c==vcnm EGEC Parry penrrerarry jaeasialotiialy bt 12- COVID-19 Update. Total Number of Confimed Case RAL! Total amber af Suspected Cases Total Number of Negative Cases Confirmed Posive Case/s a th lst 24 hours Suspected Case/sin the ast 24 Fours ‘onfieed Negative Case/s nthe last 24 hour 43. Incident Report: None Location: Na Time: Na ‘Type of incident: None No, and Names of injured parsons if any: None Damage caused if any: None Aston tobe taken to prevent similar incident: None Report by Safety Manager: None 44 Verbal Instructions requiring written confirmation None Signature: Name :Eng. EGEC-OA-CS-R-40 05-Dec-17 18/23 Rev. 00 LSHnHhh = > y ‘Surface preparation for waterproofing (GF), Fire Station part 1 ‘Surface preparation for waterproofing (GF), Fire Station part 1 Doha EGEC-OA-CS-R-40 05-Dec-17 | | PAST) Porcelain work (GF), Fire station pert 2 19123 Rev. 00 ES LSnnHih RESEC GEC ny baad Plastering, Police Station building. ‘Surface preparation for GRP plinths. EGEC-QA-CS-R-10 (pears on Ey Lusail Dar) 05-Dec-17 20/23, Parapet plastering, Preventive Security b Rev. 00 donee aw ne veuslal alias bei mmm = FYEGEC pa ing primer, Storm Water tank, nei se i ‘Surface preparation for plaster, Preventive Security building. | APP pie e a as Fixing curbstone, | Fring cutone- EGEC-OA-CS-R-10 05-Dec-17 Rev. 00 2123, REGEC External work Se External work. EGEC-OA-CS-R-10 05-Dec-17 2123 Rev. 00 Rev. 00

You might also like