Professional Documents
Culture Documents
Ex. II (Zootech 104), While Pandemic
Ex. II (Zootech 104), While Pandemic
Section: __________________
I. Introduction
II. Objectives
III. Procedure
Hardwares
Umbrella Nail 20 kg
# 4 CW Nail 30 kg
# 3 CW Nail 30 kg
# 2 CW Nail 30 kg
# 1 ½ CW Nail 15 kg
¼ x ½ x14” Post Strap 192 pcs.
½” x 5” Machine Bolts 384 pcs.
1. Using the data above as your standard basis, determine the materials needed for the
construction of a 12,000-broiler capacity house. Calculate the expected cost (estimated) of
materials of a 12,000-broiler capacity house using the prevailing cost of materials in your
place. Note: You can work this in excel if you wish.
List of Materials Needed and Cost for the Construction of 12,000-broiler Capacity House:
Description Quantity
/Unit
Unit Cost Price Description Quantity/Unit Unit C
2. Using the data above as your standard basis, determine the materials needed for the
construction of a 10,000-broiler capacity house. Calculate the expected cost (estimated) of
materials of a 10,000-broiler capacity house using the prevailing cost of materials in your
place. Note: You can work this in excel if you wish.
List of Materials Needed and Cost for the Construction of 12,000-broiler Capacity House:
Description Quantity
/Unit
Unit Cost Price Description Quantity/Unit Unit C