i) M/s Energy United Pvt. Ltd Grid Connected Rooftop Solar Power Plant at
ii) M/s Solex Energy ltd residential buildings in CAPEX mode at various
All Across 29.08.20 29.08.2 locations in Bihar,
2 Bihar Central and State BREDA 11.25 19.11.2018 24.10.2018 NA NA - - - 11.25 …. …. …. N/A N/A …. …. …. …. …. …. …. …. …. …. …. …. ….
Bihar State 18 018
583 kW (commissioned)
M/s Avaada Energy Pvt Ltd Grid Connected Floating Solar PV Power Projects at
NBPDCL 18 months Govt.Water Bodies.
Circle, 23.08.20 23.08.2 22.01.20 26.06.202 Rs. 4.15 within
4 Bihar State BREDA 2 02.09.2019 27.11.2019 NA NA - - - 2 MW …. …. 2 …. NBPDCL 25 yrs …. In Process In Process …. …. …. …. ….
Dharbhang 19 019 20 0 per unit effective date
a of PPA
i) M/s Sea Buildtech 1 to 10 kWp 50650 Grid Connected Rooftop Solar Photovoltaic (PV)
ii) M/s Mitcon Consultancy /kWp Power Plants in CAPEX mode at various Govt.
iii) M/s Kor Energy buildings in Bihar,
All Across 23.08.20 23.08.2 iv) M/s Husk Power 04.02.20
5 Bihar State BREDA 10 04.09.2019 14.09.2019 NA NA - - - 10 …. …. N/A N/A …. …. …. …. …. …. …. …. …. …. …. …. ….
Bihar State 19 019 v) M/s Katyani Energy 20
vi) M/s Claro Energy
vii) M/s Solex Energy
M/s Gensol Engineering Ltd. 300 kW to 500 kW Grid Connected Floating Solar
Photovoltaic (PV) Power Plant under CAPEX model
in the State of Bihar.
All Across 17.02.20 17.02.2 upto
6 Bihar State BREDA 0.3 to 0.5 25.02.2020 05.03.2020 NA NA - - - 17.08.20 …. …. N/A N/A …. …. …. …. …. …. In Process In Process …. …. …. …. ….
Bihar State 20 020 500 kWp
20
i) M/s Aar Ess Exim 1 to 10 kWp 48620 Grid Connected Rooftop Solar Photovoltaic (PV)
ii) M/s REIL /kWp Systems under CAPEX Model for Estimated 07 MW at
iii) M/s Energy United various Government Building in the State of Bihar
All Across 20.02.20 20.02.2 iv) M/s SRCIL Energy Limted 02.07.20
7 Bihar State BREDA 7 03.03.2020 29.05.2020 NA NA - - - 7 …. …. N/A N/A …. …. …. …. …. …. In Process In Process …. …. …. …. ….
Bihar State 20 020 v) M/s Claro Energy 20
vi) M/s Solex Energy
i) Dudhwa Power Industries i) 11 to 100 kWp Installation of Grid Connected Rooftop Solar
ii) Mechatronik Technologies 37,500 /kWp Photovoltaic PV Systems under CAPEX model for
Pvt Ltd ii) 101 and above Estimated Capacity of Category B 10 MW and
iii) Solex Energy Limited 35,500 /kWp Category C 05 MW at various Government Building
iv) Harikurpa Solar & in the State of Bihar
Engineering
v) Oneindig Technologies Pvt
Ltd
vi) Energy United India Pvt.
All Across 21.08.20 21.08.2 Ltd
9 Bihar State BREDA 15 03.09.2020 06.10.2020 NA NA - - - ….. …. …. …. N/A N/A …. …. …. …. …. …. …. ….. …. …. …. …. ….
Bihar State 20 020 vii) Lukrative Solar Solutions
viii) Suryam International