Professional Documents
Culture Documents
Hazard Identification and Risk Assessment Hot Work
Hazard Identification and Risk Assessment Hot Work
INITIAL RISK
S.No INITIAL RISK
HAZARDS HARAM / EFFECTS CONTROLS
Severity Probability Risk Severity Probability Risk
Ensure all systems are properly earthed.
Cables are to be buried or elevated.
Inspect the place of work before
leaving for any sign of fire.
Date
30/09/2016 Assessed by M.Hariharan Position Safety Executive Signature
/conversion/tmp/activity_task_scratch/618319056.doc
DSIN 25.24 Hazard Identification and Risk assessment Dürr India Pvt. Ltd. 2 Page(s)
Hazard Identification and risk assessment worksheet Paint and Assembly Systems
PFS, APT, CTS
Version: C Operations
Issued on: 27.01.2014 S.Sridhar 2