South Ghawar Transmission Pipelines

DCL REPORT - South Ghawar Transmission Pipelines


Week Ending: 03 April 2020

Project ID: SASG0001


###
###
###
###
###
###
###
###
###
###
###
###
###
######
###
###
###
###
###
END OF LAST PERIOD
PERIOD ENDING: PROGRESS
PM Manoj Nair PLANT NO. BUDGET ITEM Work Order No.
TO END OF THIS PERIOD
JACOBS - ZATE 03-Apr-20
Ld Engr: Manoj Nair
PERCENT COMPLETE
BUDGET HOURS
STARTING COMPLETION
Submittal TRANSMITTED TO FILE
DATE DATE
Discipline Total
Weightage (%) Weightage (%)
Ext'n Current Performan Revised Performan Control
SHT. REV System Title By DRAWING TITLES Last Week ETC Eng ETC ORIG'L
DRAWING NO. X 60% 90% 100% g or WBS Schedule ID Deliverable Type Progress Milestone Week ce (VNs) (COs) ce (VNs) (COs) EARNED
NO. NO Serial No. - South Ghawar Transmission Pipelines DCL % PROG - Des - Budget

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
New % PROG SCHED ACTUAL SCHED ACTUAL ADD'L ADD'L Budget Budget LETTER
Dwg_No Sht_No Rev_No S30 S60 S90 IFC Ext_NW Ser_No WBS Schd_Id Dwg_Title Dlv_Type Prog_Milestone Last_Prog Progress ETC_EngETC_Des S_Sched S_Actual P P P P P P P P P P P P P P P7P P P P P C_Sched C_Actual B_T_Original B_A_PerfB_A_Revised B_T_Perf B_T_Revised EV Sched_ProgressActual_Progress Letter
SASG0001. SA222925 - SABIC WHB 0% 0% 1195 635 115 115 115 100% 100%
- - - PR SASG0001.PR PROCESS 0% 0% 0 0 115 115 115 100% 100%
PR.EN.200 SASG0001.PR.EN.200 PROCESS - ENGINEERING 0% 0% 0 0 115 0 0 115 115 0 100% 100%
PR.EN.200 0% 0% - -
PR.EN.200 0% 0% 15 15 15 13% 13%
PR.EN.200 0% 0% 30 30 30 26% 26%
PR.EN.200 0% 0% 35 35 35 30% 30%
PR.EN.200 0% 0% 35 35 35 30% 30%
PR.EN.200 0% 0% - -
PR.EN.200 0% 0% - -
PR.EN.200 0% 0% - -
PR.EN.200 0% 0% - -
PR.EN.200 0% 0% - -
PR.EN.200 0% 0% - -
PR.EN.200 0% 0% - -
PR.EN.200 0% 0% - -
PR.EN.200 0% 0% - -
PR.EN.200 0% 0% - -
PR.EN.200 0% 0% - -
PR.EN.200 0% 0% - -
PR.EN.200 0% 0% - -
PR.EN.200 0% 0% - -
PR.EN.200 0% 0% - -
PR.EN.200 0% 0% - -
PR.EN.200 0% 0% - -
PR.EN.200 0% 0% - -
PR.EN.200 0% 0% - -
PR.EN.200 0% 0% - -
PR.EN.200 0% - -
PR.EN.200 0% - -
PR.EN.200 0% - -
PR.EN.200 0% - -
PR.EN.200 0% - -
PR.EN.200 0% - -
PR.EN.200 0% - -
PR.EN.200 0% - -
PR.EN.200 0% - -
PR.EN.200 0% - -

SASG0001.PR.N-
PR.N-EN.200 PROCESS - NON ENGINEERING 0% 0% 0 0 0 0 0 0 0 0 -
EN.200
PR.N-EN.200 0% 0% - -
PR.N-EN.200 0% 0% - -
PR.N-EN.200 0% 0% - -
PR.N-EN.200 0% 0% - -
PR.N-EN.200 0% 0% - -
PR.N-EN.200 0% 0% - -
PR.N-EN.200 0% 0% - -
PR.N-EN.200 0% 0% - -
PR.N-EN.200 0% 0% - -
PR.N-EN.200 0% 0% - -
PR.N-EN.200 0% 0% - -
PR.N-EN.200 0% 0% - -

- - - FA SASG0001.FA FLOW ASSURANCE 0% 0% 0 0 0%


ME.EN.200 SASG0001.ME.EN.200 FLOW ASSURANCE - ENGINEERING 0% 0% 0 0 0 0 0 0 0 0 -
ME.EN.200 0% 0% - -
ME.EN.200 0% 0% - -
ME.EN.200 0% 0% - -
ME.EN.200 0% 0% - -
ME.EN.200 0% 0% - -
ME.EN.200 0% 0% - -
ME.EN.200 0% 0% - -
ME.EN.200 0% 0% - -
ME.EN.200 0% 0% - -
ME.EN.200 0% 0% - -
ME.EN.200 0% 0% - -
ME.EN.200 0% 0% - -
ME.EN.200 0% 0% - -
ME.EN.200 0% 0% - -
ME.EN.200 0% 0% - -
ME.EN.200 0% 0% - -
ME.EN.200 0% 0% - -
ME.EN.200 0% 0% - -

SASG0001.ME.N-
ME.N-EN.200 FLOW ASSURANCE - NON ENGINEERING 0% 0% 1195 635 0 0 0 0 0 0 -
EN.200
ME.N-EN.200 0% 0% - -
ME.N-EN.200 0% 0% - -
ME.N-EN.200 0% 0% - -
ME.N-EN.200 0% 0% - -
ME.N-EN.200 0% 0% - -
ME.N-EN.200 0% 0% - -

- - - ME SASG0001.ME MECHANICAL 0% 0% 0 0 0%
ME.EN.200 SASG0001.ME.EN.200 MECHANICAL - ENGINEERING 0% 0% 0 0 0 0 0 0 0 0 -
ME.EN.200 0% 0% - -
ME.EN.200 0% 0% - -
ME.EN.200 0% 0% - -
ME.EN.200 0% 0% - -
ME.EN.200 0% 0% - -
ME.EN.200 0% 0% - -
ME.EN.200 0% 0% - -
ME.EN.200 0% 0% - -
ME.EN.200 0% 0% - -
ME.EN.200 0% 0% - -
ME.EN.200 0% 0% - -
ME.EN.200 0% 0% - -
ME.EN.200 0% 0% - -
ME.EN.200 0% 0% - -
ME.EN.200 0% 0% - -
ME.EN.200 0% 0% - -
ME.EN.200 0% 0% - -
ME.EN.200 0% 0% - -

SASG0001.ME.N-
ME.N-EN.200 MECHANICAL - NON ENGINEERING 0% 0% 1195 635 0 0 0 0 0 0 -
EN.200
ME.N-EN.200 0% 0% - -
ME.N-EN.200 0% 0% - -
ME.N-EN.200 0% 0% - -
ME.N-EN.200 0% 0% - -
ME.N-EN.200 0% 0% - -
ME.N-EN.200 0% 0% - -

- - - PI SASG0001.PI PIPING 0% 0% 0 0 0%
PI.EN.200 SASG0001.PI.EN.200 PIPING - ENGINEERING 0% 0% 0 0 0 0 0 0 0 0 -
PI.EN.200 0% 0% - -
PI.EN.200 0% 0% - -
PI.EN.200 0% 0% - -
PI.EN.200 0% 0% - -
PI.EN.200 0% 0% - -
PI.EN.200 0% 0% - -
PI.EN.200 0% 0% - -
PI.EN.200 0% 0% - -
PI.EN.200 0% 0% - -
PI.EN.200 0% 0% - -
PI.EN.200 0% 0% - -
PI.EN.200 0% 0% - -
PI.EN.200 0% 0% - -
PI.EN.200 0% 0% - -
PI.EN.200 0% 0% - -
PI.EN.200 0% 0% - -
PI.EN.200 0% 0% - -
PI.EN.200 0% 0% - -
PI.EN.200 0% 0% - -
PI.EN.200 0% 0% - -
PI.EN.200 0% 0% - -
PI.EN.200 0% 0% - -
PI.EN.200 0% 0% - -
PI.EN.200 0% 0% - -
PI.EN.200 0% 0% - -
PI.EN.200 0% 0% - -
PI.EN.200 0% 0% - -
PI.EN.200 0% 0% - -

SASG0001.PI.N-
PI.N-EN.200 PIPING - NON ENGINEERING 0% 0% 1195 635 0 0 0 0 0 0 -
EN.200
Filename: 618429126.xls Page 2 of 9 Print Date/Time: 10/11/2022/17:45:55
###
###
###
###
###
###
###
###
###
###
###
###
###
######
###
###
###
###
###
END OF LAST PERIOD
PERIOD ENDING: PROGRESS
PM Manoj Nair PLANT NO. BUDGET ITEM Work Order No.
TO END OF THIS PERIOD
JACOBS - ZATE 03-Apr-20
Ld Engr: Manoj Nair
PERCENT COMPLETE
BUDGET HOURS
STARTING COMPLETION
Submittal TRANSMITTED TO FILE
DATE DATE
Discipline Total
Weightage (%) Weightage (%)
Ext'n Current Performan Revised Performan Control
SHT. REV System Title By DRAWING TITLES Last Week ETC Eng ETC ORIG'L
DRAWING NO. X 60% 90% 100% g or WBS Schedule ID Deliverable Type Progress Milestone Week ce (VNs) (COs) ce (VNs) (COs) EARNED
NO. NO Serial No. - South Ghawar Transmission Pipelines DCL % PROG - Des - Budget

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
New % PROG SCHED ACTUAL SCHED ACTUAL ADD'L ADD'L Budget Budget LETTER
Dwg_No Sht_No Rev_No S30 S60 S90 IFC Ext_NW Ser_No WBS Schd_Id Dwg_Title Dlv_Type Prog_Milestone Last_Prog Progress ETC_EngETC_Des S_Sched S_Actual P P P P P P P P P P P P P P P7P P P P P C_Sched C_Actual B_T_Original B_A_PerfB_A_Revised B_T_Perf B_T_Revised EV Sched_ProgressActual_Progress Letter
PI.N-EN.200 0% 0% - -
PI.N-EN.200 0% 0% - -
PI.N-EN.200 0% 0% - -
PI.N-EN.200 0% 0% - -
PI.N-EN.200 0% 0% - -
PI.N-EN.200 0% 0% - -
PI.N-EN.200 0% 0% - -
PI.N-EN.200 0% 0% - -
PI.N-EN.200 0% 0% - -
PI.N-EN.200 0% 0% - -
PI.N-EN.200 0% 0% - -
PI.N-EN.200 0% 0% - -
PI.N-EN.200 0% 0% - -
PI.N-EN.200 0% 0% - -
PI.N-EN.200 0% 0% - -
PI.N-EN.200 0% 0% - -

- - - CI SASG0001.CI CIVIL & STRUCTURAL 0% 0% 1195 635 0%


CI.EN.200 SASG0001.CI.EN.200 CIVIL & STRUCTURAL - ENGINEERING 0% 0% 1035 635 0 0 0 0 0 0 -
CI.EN.200 Q - COMMON 0% 0% - -
1 A x x x New General CI.EN.200 GENERAL NOTES - CIVIL WORKSGENERAL NOTES & ABBREVIATI Drawing A07.Blank 0% 0% 15 15 - -
1 A x x x New CI.EN.200 GENERAL NOTES - CIVIL WORKSGENERAL NOTES & ABBREVIATI Drawing A07.Blank 0% 0% 15 15 - -
1 A x x x New CI.EN.200 FOUNDATION DETAILSSOLAR PANEL FOUNDATION Drawing A07.Blank 0% 0% 15 15 - -
1 A x x x New CI.EN.200 FOUNDATION DETAILSLIGHT POLE & SWITCH RACK Drawing A07.Blank 0% 15 15 - -
1 A x x x New CI.EN.200 PLAN AND SECTIONFLARE TIP, LPG BOTTLE, RADIATION TIP Drawing A07.Blank 0% 15 15 - -
1 A x x x New CI.EN.200 FOUNDATION AND STEEL DETAILSINSTRUMENT FIELD JUNCTION Drawing A07.Blank 0% 15 15 - -
1 A x x x New CI.EN.200 FOUNDATION DETAILSMISC. SUNSHADE DETAILS Drawing A07.Blank 0% 15 15 - -
1 A x New CI.EN.200 CALCULATIONS Calculations A07.Blank 0% 200 - -
1 A x x x New
1 A x x x New Q - Line-1 15 15
1 A x x x New FOUNDATION DETAILS PIPE SUPPORT SCHEDULE Drawing A07.Blank 15 15
1 A x x x New FOUNDATION DETAILS PIPE SUPPORT SCHEDULE Drawing A07.Blank 15 15
1 A x x x New FOUNDATION LOCATION PLANSCRAPER LAUNCHER Drawing A07.Blank 15 15
1 A x x x New FOUNDATION LOCATION PLANSCRAPER LAUNCHER Drawing A07.Blank 15 15
1 A x x x New FOUNDATION LOCATION PLANSCRAPER RECEIVER Drawing A07.Blank 15 15
1 A x x x New FOUNDATION LOCATION PLANSCRAPER RECEIVER Drawing A07.Blank 15 15
1 A x x x New FOUNDATION LOCATION PLANMLV STATION - 1 Drawing A07.Blank 15 15
1 A x x x New FOUNDATION LOCATION PLANMLV STATION - 2 Drawing A07.Blank 15 15
1 A x x x New FOUNDATION LOCATION PLANMLV STATION - 3 Drawing A07.Blank 15 15
1 A x x x New FOUNDATION DETAILSHANDLING FACILITY & JIB CRANE Drawing A07.Blank 15 15
1 A x x x New FOUNDATION DETAILSFULL THRUST ANCHOR BLOCK Drawing A07.Blank 15 15
1 A x x x New FOUNDATION DETAILPLATFORM FOUNDATIONS Drawing A07.Blank 15 15
1 A x New BAR BENDING DETAILSCHEDULE Drawing A07.Blank 50
1 A x x x New
1 A x x x New
1 A x x x New Q - Line-2 15 15
1 A x x x New FOUNDATION DETAILS PIPE SUPPORT SCHEDULE Drawing A07.Blank 15 15
1 A x x x New FOUNDATION DETAILS PIPE SUPPORT SCHEDULE Drawing A07.Blank 15 15
1 A x x x New FOUNDATION LOCATION PLANSCRAPER LAUNCHER Drawing A07.Blank 15 15
1 A x x x New FOUNDATION LOCATION PLANSCRAPER LAUNCHER Drawing A07.Blank 15 15
1 A x x x New FOUNDATION LOCATION PLANSCRAPER RECEIVER Drawing A07.Blank 15 15
1 A x x x New FOUNDATION LOCATION PLANSCRAPER RECEIVER Drawing A07.Blank 15 15
1 A x x x New FOUNDATION LOCATION PLANMLV STATION - 1 Drawing A07.Blank 15 15
1 A x x x New CI.EN.200 FOUNDATION LOCATION PLANMLV STATION - 2 Drawing A07.Blank 0% 0% 15 15 - -
1 A x x x New CI.EN.200 FOUNDATION LOCATION PLANMLV STATION - 3 Drawing A07.Blank 0% 0% 15 15 - -
1 A x x x New CI.EN.200 FOUNDATION DETAILSHANDLING FACILITY & JIB CRANE Drawing A07.Blank 0% 0% 15 15 - -
1 A x x x New CI.EN.200 FOUNDATION DETAILSFULL THRUST ANCHOR BLOCK Drawing A07.Blank 0% 0% 15 15 - -
1 A x x x New CI.EN.200 FOUNDATION DETAILPLATFORM FOUNDATIONS Drawing A07.Blank 0% 0% 15 15 - -
1 A x New CI.EN.200 BAR BENDING DETAILSCHEDULE Drawing A07.Blank 0% 0% 50 - -
1 A x x x New CI.EN.200 0% 0% - -
1 A x x x New CI.EN.200 Grading & Paving MLVs Drawing A07.Blank 0% 0% 20 20 - -
1 A x x x New CI.EN.200 Grading & Paving Trap Station Drawing A07.Blank 0% 0% 20 20 - -
1 A x x x New CI.EN.200 Utility Layout MLV Drawing A07.Blank 0% 0% 20 20 - -
1 A x x x New CI.EN.200 Utility Layout Trap Station Drawing A07.Blank 0% 20 20 - -
1 A x x x New CI.EN.200 Platform Layouts Drawing A07.Blank 0% 20 20 - -
1 A x x x New CI.EN.200 Platform Details Drawing A07.Blank 0% 0% 20 20 - -
1 A x x x New CI.EN.200 Miscellanious Details Drawing A07.Blank 0% 0% 20 20 - -
1 A x New CI.EN.200 MTO MTOs A07.Blank 0% 0% 100 - -

SASG0001.CI.N-
CI.N-EN.200 CIVIL & STRUCTURAL - NON ENGINEERING 0% 0% 160 0 0 0 0 0 0 0 -
EN.200
CI.N-EN.200 Subcontract Scope Preparation 0% 0% 40 - -
CI.N-EN.200 Input to CSOW 0% 0% 20 - -
CI.N-EN.200 MR & TBE 0% 0% 40 - -
CI.N-EN.200 Quality Checks 0% 0% 30 - -
CI.N-EN.200 Coordination & meetings 0% 0% 30 - -
CI.N-EN.200 0% 0% - -
CI.N-EN.200 0% 0% - -
CI.N-EN.200 0% 0% - -
CI.N-EN.200 0% 0% - -
CI.N-EN.200 0% 0% - -
CI.N-EN.200 0% 0% - -

- - - EL SASG0001.EL ELECTRICAL 0% 0% 0 0 0%
CI.EN.200 SASG0001.CI.EN.200 ELECTRICAL - ENGINEERING 0% 0% 0 0 0 0 0 0 0 0 -
CI.EN.200 0% 0% - -
CI.EN.200 0% 0% - -
CI.EN.200 0% 0% - -
CI.EN.200 0% 0% - -
CI.EN.200 0% 0% - -
CI.EN.200 0% 0% - -
CI.EN.200 0% 0% - -
CI.EN.200 0% 0% - -
CI.EN.200 0% 0% - -
CI.EN.200 0% 0% - -
CI.EN.200 0% 0% - -
CI.EN.200 0% 0% - -
CI.EN.200 0% 0% - -
CI.EN.200 0% 0% - -
CI.EN.200 0% 0% - -
CI.EN.200 0% 0% - -
CI.EN.200 0% 0% - -

SASG0001.CI.N-
CI.N-EN.200 ELECTRICAL - NON ENGINEERING 0% 0% 0 0 0 0 0 0 0 0 -
EN.200
CI.N-EN.200 0% 0% - -
CI.N-EN.200 0% 0% - -
CI.N-EN.200 0% 0% - -
CI.N-EN.200 0% 0% - -
CI.N-EN.200 0% 0% - -
CI.N-EN.200 0% 0% - -
CI.N-EN.200 0% 0% - -
CI.N-EN.200 0% 0% - -
CI.N-EN.200 0% 0% - -
CI.N-EN.200 0% 0% - -
CI.N-EN.200 0% 0% - -

- - - CP SASG0001.CP CATHODIC PROTECTION 0% 0% 0 0 0%


CI.EN.200 SASG0001.CI.EN.200 CATHODIC PROTECTION - ENGINEERING 0% 0% 0 0 0 0 0 0 0 0 -
CI.EN.200 0% 0% - -
CI.EN.200 0% 0% - -
CI.EN.200 0% 0% - -
CI.EN.200 0% 0% - -
CI.EN.200 0% 0% - -
CI.EN.200 0% 0% - -
CI.EN.200 0% 0% - -
CI.EN.200 0% 0% - -
CI.EN.200 0% 0% - -
CI.EN.200 0% 0% - -
CI.EN.200 0% 0% - -
CI.EN.200 0% 0% - -
CI.EN.200 0% 0% - -
CI.EN.200 0% 0% - -
CI.EN.200 0% 0% - -
CI.EN.200 0% 0% - -
CI.EN.200 0% 0% - -

SASG0001.CI.N-
CI.N-EN.200 CATHODIC PROTECTION - NON ENGINEERING 0% 0% 0 0 0 0 0 0 0 0 -
EN.200
CI.N-EN.200 0% 0% - -
CI.N-EN.200 0% 0% - -
CI.N-EN.200 0% 0% - -
CI.N-EN.200 0% 0% - -
CI.N-EN.200 0% 0% - -
CI.N-EN.200 0% 0% - -
CI.N-EN.200 0% 0% - -
CI.N-EN.200 0% 0% - -
CI.N-EN.200 0% 0% - -

Filename: 618429126.xls Page 3 of 9 Print Date/Time: 10/11/2022/17:45:55


###
###
###
###
###
###
###
###
###
###
###
###
###
######
###
###
###
###
###
END OF LAST PERIOD
PERIOD ENDING: PROGRESS
PM Manoj Nair PLANT NO. BUDGET ITEM Work Order No.
TO END OF THIS PERIOD
JACOBS - ZATE 03-Apr-20
Ld Engr: Manoj Nair
PERCENT COMPLETE
BUDGET HOURS
STARTING COMPLETION
Submittal TRANSMITTED TO FILE
DATE DATE
Discipline Total
Weightage (%) Weightage (%)
Ext'n Current Performan Revised Performan Control
SHT. REV System Title By DRAWING TITLES Last Week ETC Eng ETC ORIG'L
DRAWING NO. X 60% 90% 100% g or WBS Schedule ID Deliverable Type Progress Milestone Week ce (VNs) (COs) ce (VNs) (COs) EARNED
NO. NO Serial No. - South Ghawar Transmission Pipelines DCL % PROG - Des - Budget

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
New % PROG SCHED ACTUAL SCHED ACTUAL ADD'L ADD'L Budget Budget LETTER
Dwg_No Sht_No Rev_No S30 S60 S90 IFC Ext_NW Ser_No WBS Schd_Id Dwg_Title Dlv_Type Prog_Milestone Last_Prog Progress ETC_EngETC_Des S_Sched S_Actual P P P P P P P P P P P P P P P7P P P P P C_Sched C_Actual B_T_Original B_A_PerfB_A_Revised B_T_Perf B_T_Revised EV Sched_ProgressActual_Progress Letter
CI.N-EN.200 0% 0% - -
CI.N-EN.200 0% 0% - -

EL SASG0001.EL OHPL 0% 0% 0 0 0%

- - - IN SASG0001.IN INSTRUMENTATION 0% 0% 0 0 0%
IN.EN.200 SASG0001.IN.EN.200 INSTRUMENTATION - ENGINEERING 0% 0% 0 0 0 0 0 0 0 0 -
IN.EN.200 0% 0% - -
IN.EN.200 0% 0% - -
IN.EN.200 0% 0% - -
IN.EN.200 0% 0% - -
IN.EN.200 0% 0% - -
IN.EN.200 0% 0% - -
IN.EN.200 0% 0% - -
IN.EN.200 0% 0% - -
IN.EN.200 0% 0% - -
IN.EN.200 0% 0% - -
IN.EN.200 0% 0% - -
IN.EN.200 0% 0% - -

SASG0001.IN.N-
IN.N-EN.200 INSTRUMENTATION - NON ENGINEERING 0% 0% 0 0 0 0 0 0 0 0 -
EN.200
IN.N-EN.200 0% 0% - -
IN.N-EN.200 0% 0% - -
IN.N-EN.200 0% 0% - -
IN.N-EN.200 0% 0% - -
IN.N-EN.200 0% 0% - -
IN.N-EN.200 0% 0% - -
IN.N-EN.200 0% 0% - -
IN.N-EN.200 0% 0% - -
IN.N-EN.200 0% 0% - -
IN.N-EN.200 0% 0% - -
IN.N-EN.200 0% 0% - -
IN.N-EN.200 0% 0% -

Notes: DRAWING CONTROL FOR DWG. TYPE PLANT NO. INDEX DRAWING NO.
South Ghawar Transmission
Pipelines DCL 0 A BD-XXXXXX
Project ID: SASG0001

Filename: 618429126.xls Page 4 of 9 Print Date/Time: 10/11/2022/17:45:55


JOB ORDER NO.
EWO NO.
CHANGE MANAGEMENT
JACOBS - ZATE SASG0001

ENGINEERING STEPS (RULES OF CREDIT) - Deliverable Progress Step with % Weightage as per Schedule B 5.7.2
Initial SAUDI Original Budget Additional VNs Additional COs
ARAMCO
Discipline Check
Submittal TRANSMITTED TO FILE Drafting Review (if Completion with
Initial Drafting (Issue for Final Draft Final Issuance Eng Des Totals Vn Ref Eng Des Totals CO Ref Eng Des Totals
Complete required by Holds Discipline % Total % Remarks /
Approval) Original Mhrs ETC Mhrs
SAUDI Progress Progress Comments
Ext'n ARAMCO) R
SHT. REV System Title By DRAWING TITLES
DRAWING NO. X 60% 90% 100% g or
Serial No.
WBS Schedule ID 20% 45% 15% 5% 5% 5% 5% A
NO. NO - South Ghawar Transmission Pipelines DCL DATE G
New
Dwg_No Sht_No Rev_No S30 S60 S90 IFC Ext_NW Ser_No WBS Schd_Id Dwg_Title Trans_Date Remarks 20% 65% 80% 85% 90% 95% 100% Sched_Progres Actual_Progres Mnhrs Mnhrs OB_Eng OB_Des OB_Total VN_Ref VN_Eng VN_Des VN_Total CO_Ref CO_Eng CO_Des CO_Total RAG

SASG0001. SA222925 - SABIC WHB 0% 0% 115 0 80 35 115 0 0 0 0 0 0


- - - PR SASG0001.PR PROCESS 0% 0% 115 0 - 80 35 115 0 0 0 0 0 0
PR.EN.200 SASG0001.PR.EN.200 PROCESS - ENGINEERING - 115 0 80 35 115 0 0 0 0 0 0
PR.EN.200 0 0
PR.EN.200 0% - 15 0 10 5 15
PR.EN.200 0% - 30 0 20 10 30
PR.EN.200 0% - 35 0 25 10 35
PR.EN.200 0% - 35 0 25 10 35
PR.EN.200 - - 0 0
PR.EN.200 - - 0 0
PR.EN.200 - - 0 0
PR.EN.200 - - 0 0
PR.EN.200 - - 0 0
PR.EN.200 - - 0 0
PR.EN.200 - - 0 0
PR.EN.200 - - 0 0
PR.EN.200 - - 0 0
PR.EN.200 - - 0 0
PR.EN.200 - - 0 0
PR.EN.200 - - 0 0
PR.EN.200 - - 0 0
PR.EN.200 - - 0 0
PR.EN.200 - - 0 0
PR.EN.200 - - 0 0
PR.EN.200 - - 0 0
PR.EN.200 - - 0 0
PR.EN.200 - - 0 0
PR.EN.200 - - 0 0
PR.EN.200 - - 0 0
PR.EN.200 - - 0 0
PR.EN.200 - - 0 0
PR.EN.200 - - 0 0
PR.EN.200 - - 0 0
PR.EN.200 - - 0 0
PR.EN.200 - - 0 0
PR.EN.200 - - 0 0
PR.EN.200 - - 0 0
PR.EN.200 - - 0 0

SASG0001.PR.N-
PR.N-EN.200 PROCESS - NON ENGINEERING - 0 0 0 0 0 0 0 0 0 0
EN.200
PR.N-EN.200 0% -
PR.N-EN.200 0% -
PR.N-EN.200 0% -
PR.N-EN.200 0% -
PR.N-EN.200 0% -
PR.N-EN.200 0% -
PR.N-EN.200 0% -
PR.N-EN.200 0% -
PR.N-EN.200 0% -
PR.N-EN.200 0% -
PR.N-EN.200 0% -
PR.N-EN.200 0% -

- - - FA SASG0001.FA FLOW ASSURANCE 0% 0 - 0 0 0 0 0 0 0 0 0


ME.EN.200 SASG0001.ME.EN.200 FLOW ASSURANCE - ENGINEERING - 0 0 0 0 0 0 0 0 0 0
ME.EN.200 0% -
ME.EN.200 0% -
ME.EN.200 0% -
ME.EN.200 0% -
ME.EN.200 0% -
ME.EN.200 0% -
ME.EN.200 0% -
ME.EN.200 0% -
ME.EN.200 0% -
ME.EN.200 0% -
ME.EN.200 0% -
ME.EN.200 0% -
ME.EN.200 0% -
ME.EN.200 0% -
ME.EN.200 0% -
ME.EN.200 0% -
ME.EN.200 0% -
ME.EN.200 0% -

SASG0001.ME.N-
ME.N-EN.200 FLOW ASSURANCE - NON ENGINEERING - 0 0 0 0 0 0 0 0 0 0
EN.200
ME.N-EN.200 0% -
ME.N-EN.200 0% -
ME.N-EN.200 0% -
ME.N-EN.200 0% -
ME.N-EN.200 0% -
ME.N-EN.200 0% -

- - - ME SASG0001.ME MECHANICAL 0% 0 - 0 0 0 0 0 0 0 0 0
ME.EN.200 SASG0001.ME.EN.200 MECHANICAL - ENGINEERING - 0 0 0 0 0 0 0 0 0 0
ME.EN.200 0% -
ME.EN.200 0% -
ME.EN.200 0% -
ME.EN.200 0% -
ME.EN.200 0% -
ME.EN.200 0% -
ME.EN.200 0% -
ME.EN.200 0% -
ME.EN.200 0% -
ME.EN.200 0% -
ME.EN.200 0% -
ME.EN.200 0% -
ME.EN.200 0% -
ME.EN.200 0% -
ME.EN.200 0% -
ME.EN.200 0% -
ME.EN.200 0% -
ME.EN.200 0% -

SASG0001.ME.N-
ME.N-EN.200 MECHANICAL - NON ENGINEERING - 0 0 0 0 0 0 0 0 0 0
EN.200
ME.N-EN.200 0% -
ME.N-EN.200 0% -
ME.N-EN.200 0% -
ME.N-EN.200 0% -
ME.N-EN.200 0% -
ME.N-EN.200 0% -

- - - PI SASG0001.PI PIPING 0% 0 - 0 0 0 0 0 0 0 0 0
PI.EN.200 SASG0001.PI.EN.200 PIPING - ENGINEERING - 0 0 0 0 0 0 0 0 0 0
PI.EN.200 0% -
PI.EN.200 0% -
PI.EN.200 0% -
PI.EN.200 0% -
PI.EN.200 0% -
PI.EN.200 0% -
PI.EN.200 0% -
PI.EN.200 0% -
PI.EN.200 0% -
PI.EN.200 0% -
PI.EN.200 0% -
PI.EN.200 0% -
PI.EN.200 0% -
PI.EN.200 0% -
PI.EN.200 0% -
PI.EN.200 0% -
PI.EN.200 0% -
PI.EN.200 0% -
PI.EN.200 0% -
PI.EN.200 0% -
PI.EN.200 0% -
PI.EN.200 0% -
PI.EN.200 0% -
PI.EN.200 0% -
PI.EN.200 0% -
PI.EN.200 0% -
PI.EN.200 0% -
PI.EN.200 0% -

SASG0001.PI.N-
PI.N-EN.200 PIPING - NON ENGINEERING - 0 0 0 0 0 0 0 0 0 0
EN.200
Filename: 618429126.xls Page 5 of 9 Print Date/Time: 10/11/2022/17:45:55
JOB ORDER NO.
EWO NO.
CHANGE MANAGEMENT
JACOBS - ZATE SASG0001

ENGINEERING STEPS (RULES OF CREDIT) - Deliverable Progress Step with % Weightage as per Schedule B 5.7.2
Initial SAUDI Original Budget Additional VNs Additional COs
ARAMCO
Discipline Check
Submittal TRANSMITTED TO FILE Drafting Review (if Completion with
Initial Drafting (Issue for Final Draft Final Issuance Eng Des Totals Vn Ref Eng Des Totals CO Ref Eng Des Totals
Complete required by Holds Discipline % Total % Remarks /
Approval) Original Mhrs ETC Mhrs
SAUDI Progress Progress Comments
Ext'n ARAMCO) R
SHT. REV System Title By DRAWING TITLES
DRAWING NO. X 60% 90% 100% g or
Serial No.
WBS Schedule ID 20% 45% 15% 5% 5% 5% 5% A
NO. NO - South Ghawar Transmission Pipelines DCL DATE G
New
Dwg_No Sht_No Rev_No S30 S60 S90 IFC Ext_NW Ser_No WBS Schd_Id Dwg_Title Trans_Date Remarks 20% 65% 80% 85% 90% 95% 100% Sched_Progres Actual_Progres Mnhrs Mnhrs OB_Eng OB_Des OB_Total VN_Ref VN_Eng VN_Des VN_Total CO_Ref CO_Eng CO_Des CO_Total RAG
PI.N-EN.200 0% -
PI.N-EN.200 0% -
PI.N-EN.200 0% -
PI.N-EN.200 0% -
PI.N-EN.200 0% -
PI.N-EN.200 0% -
PI.N-EN.200 0% -
PI.N-EN.200 0% -
PI.N-EN.200 0% -
PI.N-EN.200 0% -
PI.N-EN.200 0% -
PI.N-EN.200 0% -
PI.N-EN.200 0% -
PI.N-EN.200 0% -
PI.N-EN.200 0% -
PI.N-EN.200 0% -

- - - CI SASG0001.CI CIVIL & STRUCTURAL 0% 0 - 0 0 0 0 0 0 0 0 0


CI.EN.200 SASG0001.CI.EN.200 CIVIL & STRUCTURAL - ENGINEERING - 0 0 0 0 0 0 0 0 0 0
CI.EN.200 Q - COMMON 0% -
1 A x x x New General CI.EN.200 GENERAL NOTES - CIVIL WORKSGENERAL NOTES & ABBREVIATI 0% -
1 A x x x New CI.EN.200 GENERAL NOTES - CIVIL WORKSGENERAL NOTES & ABBREVIATI 0% -
1 A x x x New CI.EN.200 FOUNDATION DETAILSSOLAR PANEL FOUNDATION 0% -
1 A x x x New CI.EN.200 FOUNDATION DETAILSLIGHT POLE & SWITCH RACK 0% -
1 A x x x New CI.EN.200 PLAN AND SECTIONFLARE TIP, LPG BOTTLE, RADIATION TIP 0% -
1 A x x x New CI.EN.200 FOUNDATION AND STEEL DETAILSINSTRUMENT FIELD JUNCTION 0% -
1 A x x x New CI.EN.200 FOUNDATION DETAILSMISC. SUNSHADE DETAILS 0% -
1 A x New CI.EN.200 CALCULATIONS 0% -
1 A x x x New
1 A x x x New Q - Line-1
1 A x x x New FOUNDATION DETAILS PIPE SUPPORT SCHEDULE
1 A x x x New FOUNDATION DETAILS PIPE SUPPORT SCHEDULE
1 A x x x New FOUNDATION LOCATION PLANSCRAPER LAUNCHER
1 A x x x New FOUNDATION LOCATION PLANSCRAPER LAUNCHER
1 A x x x New FOUNDATION LOCATION PLANSCRAPER RECEIVER
1 A x x x New FOUNDATION LOCATION PLANSCRAPER RECEIVER
1 A x x x New FOUNDATION LOCATION PLANMLV STATION - 1
1 A x x x New FOUNDATION LOCATION PLANMLV STATION - 2
1 A x x x New FOUNDATION LOCATION PLANMLV STATION - 3
1 A x x x New FOUNDATION DETAILSHANDLING FACILITY & JIB CRANE
1 A x x x New FOUNDATION DETAILSFULL THRUST ANCHOR BLOCK
1 A x x x New FOUNDATION DETAILPLATFORM FOUNDATIONS
1 A x New BAR BENDING DETAILSCHEDULE
1 A x x x New
1 A x x x New
1 A x x x New Q - Line-2
1 A x x x New FOUNDATION DETAILS PIPE SUPPORT SCHEDULE
1 A x x x New FOUNDATION DETAILS PIPE SUPPORT SCHEDULE
1 A x x x New FOUNDATION LOCATION PLANSCRAPER LAUNCHER
1 A x x x New FOUNDATION LOCATION PLANSCRAPER LAUNCHER
1 A x x x New FOUNDATION LOCATION PLANSCRAPER RECEIVER
1 A x x x New FOUNDATION LOCATION PLANSCRAPER RECEIVER
1 A x x x New FOUNDATION LOCATION PLANMLV STATION - 1
1 A x x x New CI.EN.200 FOUNDATION LOCATION PLANMLV STATION - 2 0% -
1 A x x x New CI.EN.200 FOUNDATION LOCATION PLANMLV STATION - 3 0% -
1 A x x x New CI.EN.200 FOUNDATION DETAILSHANDLING FACILITY & JIB CRANE 0% -
1 A x x x New CI.EN.200 FOUNDATION DETAILSFULL THRUST ANCHOR BLOCK 0% -
1 A x x x New CI.EN.200 FOUNDATION DETAILPLATFORM FOUNDATIONS 0% -
1 A x New CI.EN.200 BAR BENDING DETAILSCHEDULE 0% -
1 A x x x New CI.EN.200 0% -
1 A x x x New CI.EN.200 Grading & Paving MLVs 0% -
1 A x x x New CI.EN.200 Grading & Paving Trap Station 0% -
1 A x x x New CI.EN.200 Utility Layout MLV 0% -
1 A x x x New CI.EN.200 Utility Layout Trap Station 0% -
1 A x x x New CI.EN.200 Platform Layouts 0% -
1 A x x x New CI.EN.200 Platform Details 0% -
1 A x x x New CI.EN.200 Miscellanious Details 0% -
1 A x New CI.EN.200 MTO 0% -

SASG0001.CI.N-
CI.N-EN.200 CIVIL & STRUCTURAL - NON ENGINEERING - 0 0 0 0 0 0 0 0 0 0
EN.200
CI.N-EN.200 Subcontract Scope Preparation 0% -
CI.N-EN.200 Input to CSOW 0% -
CI.N-EN.200 MR & TBE 0% -
CI.N-EN.200 Quality Checks 0% -
CI.N-EN.200 Coordination & meetings 0% -
CI.N-EN.200 0% -
CI.N-EN.200 0% -
CI.N-EN.200 0% -
CI.N-EN.200 0% -
CI.N-EN.200 0% -
CI.N-EN.200 0% -

- - - EL SASG0001.EL ELECTRICAL 0% 0 - 0 0 0 0 0 0 0 0 0
CI.EN.200 SASG0001.CI.EN.200 ELECTRICAL - ENGINEERING - 0 0 0 0 0 0 0 0 0 0
CI.EN.200 0% -
CI.EN.200 0% -
CI.EN.200 0% -
CI.EN.200 0% -
CI.EN.200 0% -
CI.EN.200 0% -
CI.EN.200 0% -
CI.EN.200 0% -
CI.EN.200 0% -
CI.EN.200 0% -
CI.EN.200 0% -
CI.EN.200 0% -
CI.EN.200 0% -
CI.EN.200 0% -
CI.EN.200 0% -
CI.EN.200 0% -
CI.EN.200 0% -

SASG0001.CI.N-
CI.N-EN.200 ELECTRICAL - NON ENGINEERING - 0 0 0 0 0 0 0 0 0 0
EN.200
CI.N-EN.200 0% -
CI.N-EN.200 0% -
CI.N-EN.200 0% -
CI.N-EN.200 0% -
CI.N-EN.200 0% -
CI.N-EN.200 0% -
CI.N-EN.200 0% -
CI.N-EN.200 0% -
CI.N-EN.200 0% -
CI.N-EN.200 0% -
CI.N-EN.200 0% -

- - - CP SASG0001.CP CATHODIC PROTECTION 0% 0 - 0 0 0 0 0 0 0 0 0


CI.EN.200 SASG0001.CI.EN.200 CATHODIC PROTECTION - ENGINEERING - 0 0 0 0 0 0 0 0 0 0
CI.EN.200 0% -
CI.EN.200 0% -
CI.EN.200 0% -
CI.EN.200 0% -
CI.EN.200 0% -
CI.EN.200 0% -
CI.EN.200 0% -
CI.EN.200 0% -
CI.EN.200 0% -
CI.EN.200 0% -
CI.EN.200 0% -
CI.EN.200 0% -
CI.EN.200 0% -
CI.EN.200 0% -
CI.EN.200 0% -
CI.EN.200 0% -
CI.EN.200 0% -

SASG0001.CI.N-
CI.N-EN.200 CATHODIC PROTECTION - NON ENGINEERING - 0 0 0 0 0 0 0 0 0 0
EN.200
CI.N-EN.200 0% -
CI.N-EN.200 0% -
CI.N-EN.200 0% -
CI.N-EN.200 0% -
CI.N-EN.200 0% -
CI.N-EN.200 0% -
CI.N-EN.200 0% -
CI.N-EN.200 0% -
CI.N-EN.200 0% -

Filename: 618429126.xls Page 6 of 9 Print Date/Time: 10/11/2022/17:45:55


JOB ORDER NO.
EWO NO.
CHANGE MANAGEMENT
JACOBS - ZATE SASG0001

ENGINEERING STEPS (RULES OF CREDIT) - Deliverable Progress Step with % Weightage as per Schedule B 5.7.2
Initial SAUDI Original Budget Additional VNs Additional COs
ARAMCO
Discipline Check
Submittal TRANSMITTED TO FILE Drafting Review (if Completion with
Initial Drafting (Issue for Final Draft Final Issuance Eng Des Totals Vn Ref Eng Des Totals CO Ref Eng Des Totals
Complete required by Holds Discipline % Total % Remarks /
Approval) Original Mhrs ETC Mhrs
SAUDI Progress Progress Comments
Ext'n ARAMCO) R
SHT. REV System Title By DRAWING TITLES
DRAWING NO. X 60% 90% 100% g or
Serial No.
WBS Schedule ID 20% 45% 15% 5% 5% 5% 5% A
NO. NO - South Ghawar Transmission Pipelines DCL DATE G
New
Dwg_No Sht_No Rev_No S30 S60 S90 IFC Ext_NW Ser_No WBS Schd_Id Dwg_Title Trans_Date Remarks 20% 65% 80% 85% 90% 95% 100% Sched_Progres Actual_Progres Mnhrs Mnhrs OB_Eng OB_Des OB_Total VN_Ref VN_Eng VN_Des VN_Total CO_Ref CO_Eng CO_Des CO_Total RAG
CI.N-EN.200 0% -
CI.N-EN.200 0% -

EL SASG0001.EL OHPL 0% 0 0 0 0 0 0 0 0 0 0

- - - IN SASG0001.IN INSTRUMENTATION 0% 0 - 0 0 0 0 0 0 0 0 0
IN.EN.200 SASG0001.IN.EN.200 INSTRUMENTATION - ENGINEERING - 0 0 0 0 0 0 0 0 0 0
IN.EN.200 0% -
IN.EN.200 0% -
IN.EN.200 0% -
IN.EN.200 0% -
IN.EN.200 0% -
IN.EN.200 0% -
IN.EN.200 0% -
IN.EN.200 0% -
IN.EN.200 0% -
IN.EN.200 0% -
IN.EN.200 0% -
IN.EN.200 0% -

SASG0001.IN.N-
IN.N-EN.200 INSTRUMENTATION - NON ENGINEERING - 0 0 0 0 0 0 0 0 0 0
EN.200
IN.N-EN.200 0% -
IN.N-EN.200 0% -
IN.N-EN.200 0% -
IN.N-EN.200 0% -
IN.N-EN.200 0% -
IN.N-EN.200 0% -
IN.N-EN.200 0% -
IN.N-EN.200 0% -
IN.N-EN.200 0% -
IN.N-EN.200 0% -
IN.N-EN.200 0% -
IN.N-EN.200 - 0

Notes: SHEET NO. REV NO. REV NO. REV NO. REV NO. REV NO. REV NO. REV NO. REV NO. INDEX DRAWING NO. INDEX DRAWING NO. Notes:

1 OF 1 A

Filename: 618429126.xls Page 7 of 9 Print Date/Time: 10/11/2022/17:45:55


WBS SUMMARY REPORT
Period Ending : 03-Apr-20
Discipline : South Ghawar Transmission Pipelines

A B C D E F G H I J K=I+J L=F-K M=H/J N=(F-H)/I


WBS Summary
WBS Code Description Original Client App PM App Revised App Progress % Earned Mhrs ETC Actual FAC VAC Productivit TCPI
Budget Changes Changes Performance Cmpl Mhrs Spend To Mhrs Mhrs y
(COs) (VNs) Budget date

SAG12345.C CUMULATIVE TOTAL PROGRESS - CIVIL/STRUCTURAL ENGINEERING 0 0 0 0 0.00% 0 0 0 0 0


SAG12345.C000N Sub Total Progress - NON-DELIVERABLES 0 0 0 0 0 0 0 0 0 0
SAG12345.C0020 Civil/Stru - Adminstration/ Coordination 0 0 0 0 0 0 0 0 0
SAG12345.C0050 Civil/Stru - Field Support 0 0 0 0 0 0 0 0 0
SAG12345.C0060 Civil/Stru - Estimates 0 0 0 0 0 0 0 0 0
SAG12345.C0120 Civil/Stru - Squad Checks 0 0 0 0 0 0 0 0 0
SAG12345.C0150 Civil/Stru - Purchasing 0 0 0 0 0 0 0 0 0
SAG12345.C060* Sub Total Progress - DELIVERABLES 0 0 0 0 0 0 0 0 0 0
SAG12345.C0601 Civil/Stru - Concrete Drawings and Calculations 0 0 0 0 0 0 0 0 0
SAG12345.C0602 Civil/Stru - Building Drawings and Calculations 0 0 0 0 0 0 0 0 0
SAG12345.C0603 Civil/Stru - Structural Steel Drawings and Calculations 0 0 0 0 0 0 0 0 0
SAG12345.C0604 Civil/Stru - Civil Drawings and Calculations 0 0 0 0 0 0 0 0 0