Temporary Power For Lighting and Wall Outletv Lot 201 and 202A
Temporary Power For Lighting and Wall Outletv Lot 201 and 202A
1.1 Disconnect and relocate existing power source for SDB-C1 and SDB-D1 from AC Plant Room 1 lot
SDB-U-AC3
1.2 Install new 250amp breaker and cable feeder Transformer room 2 set Replace existing cover
1.3 Connect the breaker with cable feeder including tapping to buss bar at MSB- Transformer room 1 lot
3A for SDB-C1 at MSB-1A and SDB-D1 at MSB-2A
1.4 Replace existing relay protection at SDB-C1 and SDB-D1 panels with range Ex Mold Room area 1 lot Replace existing protection
150amp to 400amp
1.5 Disconnect temporary power for emergency to EWB Panel 1st floor from MSB- Transformer room
3A
2 LOT 202A
Install temporarry distribution panel from at DB-ROOF panel room and cable
2.1 feeder to 3rd, 2nd and 1st floor electrical room, complete with wiring and Roof top 1 lot Standard Infineon Panel
protection (Earth Fault Relay and Over load Relay), incoming out going
indicator light.
2.2 Install 3 set breaker @150amp and wiring Roof top 1 lot
2.3 Supply and install galvanized cable tray All floor 1 lot
2.4 Connect to Lighting and Power wall outlet panel at 3rd floor panel SD3-LP and 3rd Floor
SDB3-PP
2.5 Connect to Lighting and Power wall outlet panel at 2nd floor panel SD2-LP and 2nd Floor 1 lot
SDB2-PP
2.6 Connect to Lighting and Power wall outlet panel at 1st floor panel SD1-LP and 1st Floor
SDB1-PP
2.7 Disconnect and reconnect the power source of elevator/lift from ESDB 1st 1st Floor 1 lot
floor to DB Lift
2.8 All floor 1 lot
Install Voltage and Ampere indicator to all existing panel at each floor.
3 Repainting panel cover, reffer to Infineon standard color
4 Clean and repainting the wall of rooftop electrical room
1 lot
5 Repainting the floor with epoxy, reffer to Infineon electrical room and install
new rubber mat.
6 Fix all wires in each panel.
Transformer room and
7 Disconnect and re-route the lift power cable from current temporary source 1 lot
and connect to DB Utility to be in permanent source DB-FL 1 room
The result of this work must be safe and carried out properly
Rp1,400,000 9 Rp155,556
15 2333333.3 4666667