PKLM Pac
PKLM Pac
Pre-requisites:
Ambient conditions are checked and ensured as per the recommendations of PEL.
Installation Status:
The installation has been completed on 17.10.2020 as per standard PEL procedure.
Commissioning Status:
The commissioning has been completed on 20.10.2020 as per standard PEL procedure.
Training:
Comprehensive Training was given to Technicians and Executives when installation of
six machines in LMW G5/1 (machine 3 to 5 and 12 to 14) .Additional features viz. Ultimo
Applications, Architecture, key features, User benefits, individual spindle status LED, Section LED,
Machine Display Unit, Status Board and Various Unique Software Views Like Cop Stage, Power
analysis, Dash Board etc were explained to the Technicians and clarified to their queries.
The working of the instrument has been observed for its full function on all aspects and
found to perform to our entire satisfaction.
Signature: