Minutes of the Meeting

Sl.No Nature Of Work Action Taken


Installation and commissioning of ultimo Ultimo system installed in all the 06 machines
1 system in 06 machines (LR G5/1) with from M/C no: 3 to 5 and 12 to 14. Then commis-
1008 spindles each machine.[Sl.   Nos: sioned the same as per our standard work instruc-
9940 and 10027 to 10031]   tion. This 6 machines connected with existing coor-
dinator number 3.  
  

The status board and Thin client location  


2 New status board fixed near to the ma-
   chine 18 and existing status board, new wall
mounting clamp and new thin client hand
  
over to the stores.
  
Ultimo features like end breaks lamp, MDU
and power module enabled and working fine.
Ultimo maintenance app installed in SM
and supervisor mobile to explained the stop
code entry and count change procedure.
Ultimo software Training was given to all
department peoples and sensor handling
training was given to electrical department

Ultimo Spares Received spares with 6 machines


3.
12 cm sensors - 78 Nos.
18 cm sensors - 57 Nos.
25 cm sensors - 7 Nos.
Master PCB -4 Nos.
Slave PCB -8 Nos.
Relimate cable - 10 Nos.
Power cable -2 Nos.
Coupling bracket - 1No.

Sl.No Nature of Work Action Taken


Ind.Prox.Sensor - 1 No.
Following Spares are used for the old ma-
chines by customer.
12 cm sensors -78 Nos.
18 cm sensors - 57 Nos.
25 cm sensors -7 Nos.
Relimate cable -7 Nos.
Power cable - 1 No.
Slave PCB - 4 Nos.
Remaining spares hand over to customer.

After commissioning, observed the overall


Conclusion functions and working performance of all 06
machines. Now system is working satisfac-
4
torily

  

    For PK Laxmi Mills India Pvt Ltd For Premier Evolvics P Ltd 

Mr. MSL.Balakumar (FM) G.Lingasamy (CSD-FS)

Mr. D.Kumar (SM)

Mr. B.Thoppaiyan (ES)