DAILY REPORT

DATE : 28-9-2022
MASONRY WORK
BUILDING FLOOR ACTIVITY DESCRIPTION WORKER PER ACTIVITY TOTAL OF WORKER
C2 6 Masonry 10
C2 7 Masonry 5
39
C2 10 Masonry 15
C2 11 Masonry 9
PLASTER WORK
B1 1 Gypsum 2
B1 2 Gypsum 4
B1 7 Gypsum 3
B1 17 Gypsum 5
B1 14 Gypsum 10
B1 16 Gypsum 5
54
B2 1 Gypsum 5
B2 2 Gypsum 10
B1 12 Cement Plaster 2
B2 15 Cement Plaster 2
C1 2 Cement Plaster 4
C1 3 Cement Plaster 2
MECHANICAL WORK
B1 Ground Cutting in ground 2
B1 Penth House Coring 3
B2 2 Ventilation 2
B2 12 Ventilation 3
B2 14 Ventilation 3
B2 15 Ac Drain 3
C1 3 Modification 3 39
C1 12 Chasing 3
C1 15 Coring 4
C2 3 PPR Instalation 4
C2 4 PP Instalation 4
C2 3 Chasing 2
C2 5,6, Coring 3
ELECTRICAL WORK
B1 1 Maintenance 1
B1 2 Maintenance 1
B1 3 Maintenance 2
B2 1 Wiring 3
B2 9 Wiring 3
C1 5 Pipe Instalation 5
C1 6 Pipe Instalation 7
C1 7 Pipe Instalation 4
C1 9 Pipe Instalation 6 58
C1 10 Pipe Instalation 4
C1 11 Pipe Instalation 4
C1 12 Pipe Instalation 4
C1 13 Pipe Instalation 5
C1 15 Chasing 2
C2 1 Pipe Instalation 3
C2 2 Pipe Instalation 2
C2 3 Chasing 2