Blasting Profile - 1 Dec 2020
Blasting Profile - 1 Dec 2020
Blasting Profile - 1 Dec 2020
FB_CSCEC_HPJV
Index:
1. QCP
4. Paint Specifications
FB Engineering Critical
CUSTOMER:
Major
CSEC COMPANY
X Minor
Date:________________________
Supervisor:___________________ ___________________________
(Print Name) (Signature)
This is to certify that Blasting have been performed to ISO 8501-1 and all relevant requirements
have been fullfilled to satisfaction of the specification.
Primer Application:
Supervisor: _______________________ Drawing Number: _________________________
1. Have all sharp or broken edges been stipe coated prior to application of Primer? _______
Min:_________ Max:_________
Date:________________________
Supervisor:___________________ ___________________________
(Print Name) (Signature)
This is to certify that Primer Application have been performed to the relevant specification
and all relevant requirements have been fullfilled to satisfaction of the specification.
Intermediate Application:
Supervisor: _______________________ Drawing Number: _________________________
1. Have all sharp or broken edges been stipe coated prior to application of Primer? _______
Average:
Min:_________ Max:_________
Date:________________________
Supervisor:___________________ ___________________________
(Print Name) (Signature)
This is to certify that Intermediate Application have been performed to the relevant specification
and all relevant requirements have been fullfilled to satisfaction of the specification.
Final Application:
Supervisor: _______________________ Drawing Number: _________________________
1. Have all sharp or broken edges been stipe coated prior to application of Primer? _______
Min:_________ Max:_________
Date:________________________
Supervisor:___________________ ___________________________
(Print Name) (Signature)
This is to certify that Final Application have been performed to the relevant specification
and all relevant requirements have been fullfilled to satisfaction of the specification.
QCP FABRICATION FABRICATION Works
5 FABRICATION V R S VIS
b. Cutting - Cut out all marked items. Vissual examination and then check dimensions V R S VIS
Cutting - Cut out all marked items. Vissual examination and then check dimensions
c. Welding - Tack weld components together. Check for squareness, orrientation, before full V R S VIS
Welding. Carry out visual inspection.
9 Final vissual inspection on site before transfering for sand blasting and Painting V R S VIS
Delivery note and In house check list to be inspected vissually.
FINAL ACCEPTANCE: 1 2 3
NOTE 1: THE FOLLOWING ABBREVIATIONS MAY BE INSERTED TO IDENTIFY TYPE OF TEST. VIS-VISUAL; DIM-DIMENSIONAL; ULT-ULTRASONIC; DYE-DYE PENETRANT; DFT-DEPTH OF FILM THICKNESS; HYD-HYDRAULIC; PN-PNEUMATIC.
NOTE 2: LEAVE A MINIMUM OF ONE BLANK LINES BETWEEN ITEMS TO ALLOW THE INSPECTION AUTHORITY TO INSERT INSPECTION DATES BELOW SIGNATURE.
QCP - fabrication
618555720.xlsx Site Works (2)
FINAL ACCEPTANCE: 1 2 3
NOTE 1: THE FOLLOWING ABBREVIATIONS MAY BE INSERTED TO IDENTIFY TYPE OF TEST. VIS-VISUAL; DIM-DIMENSIONAL; ULT-ULTRASONIC; DYE-DYE PENETRANT; DFT-DEPTH OF FILM THICKNESS; HYD-HYDRAULIC; PN-PNEUMATIC.
NOTE 2: LEAVE A MINIMUM OF ONE BLANK LINES BETWEEN ITEMS TO ALLOW THE INSPECTION AUTHORITY TO INSERT INSPECTION DATES BELOW SIGNATURE.
8 OF 8