Assignment 2 Estimation and Costing
Assignment 2 Estimation and Costing
Assignment 2 Estimation and Costing
ASSIGNMENT No: 2
Assignment Outcomes: Marks
(I) To study how to estimate, type of estimate, method and revised and maintenance of estimate.
(II) Forecast the approximate Cost of the projects through preliminary and detailed estimates.
SECTION A 4*1 = 4
1. Select correct answer
(a)Pick up the excavation where measurements are made in square metres for payment.
A.Ordinary cuttings up to 1 m
B.surface dressing up to 15 cm depths
C.Surface excavation up to 30 cm depths
D.Both (b) and (c)
(c)The expected out turn of 2.5 cm cement concrete floor per manson per day
A.2.5 sqm
B.5.0 sqm
C.7.5 sqm
D.10 sqm
(d)Pick up the item of work not included in the plinth area estimate
A.Wall thickness
B.Room area
C.Verandah area
D.Courtyard area
SECTON B 3*2 = 6
2. Unit measurements in estimating & costing?
3. Define estimate-Types and also definition?
4. Discuss the type of bars in R.C.C. structure? And its used?
1|P age
Note for students: Students are required to submit handwritten solutions of given assignment / tutorial sheet on or before Last date
of submission otherwise penalty in terms of deduction
in marks will be made as per following rule:
If submitted on or before last date then Deduction of marks = 0
If submission delayed by (1-7) days then Deduction of marks = 20%
If submission delayed by (8-14) days then Deduction of marks = 40%
If submission delayed by more than 15 days then Deduction of marks = 60%