INSPECTION REPORT NO. INSPECTION DATE & TIME IR NO. SHEET NO.
SUBCONTRACTOR/
CIVIL ENGINEERING
SUPPLIER
KASO
No. Inspection Reference Constrcution Remarks
QC
Verify use of correct materials
1 Check all materials are as a specification ( elec.box , pipe and electric. wire)
2 Check the Box and PIPE are installed as per approved drawings
verify the installation location of the pipe for conflicts with other systems (E.G
3
PIPING, steam heat trace, ETC.) as to the project IFC drawings.
Verify the color-coding, tags and markings of the cables and conductors are
8
intact and readable after connector is installed.
verify that cables are pulled into approved specific trays designed & indicated
9
by code and the project ifc drawings.
12
19
REMARKS:
Name
Signature
Date / / / / / /
IR No. : A 260922-BMRC-KASO-AD-IR-116.REV3