Professional Documents
Culture Documents
Makthal Section Formats-I Dt.29.08.2022 (An) Updated
Makthal Section Formats-I Dt.29.08.2022 (An) Updated
Carriagew Year of
District: Narayanpet Km. Scheme
ay Width Renewal
Division: Mahabubnagar
Name of Road: PWD road to Thangadi from km.0/0 to 2/180
Total Length: 2.18 2/810
GO.99 KP
Constituency: Makthal
SL/BT 2017-18
Details of Road:
Type of
Improvements / Renewals
Work
0/0
Road Surface completed
Reach Nature Amount Status
SL/IL/DL/ Condition GO/A/S/ Ref during
FL of Work Rs. in Lakhs the year
G.O. Rt No 99,
Km 0/0-2/030 is in
T(R&B) (R.II)
Good condition & Km
New Dept, Work
Km 0/0 to 2/180 SL 2/030 to 2/180 230 2017-18
Formation Dt:01.03.2016 completed
Breached in Aug,
(Krishna
2019
Pushkaralu)
FORMAT-I
Non Plan
Division: Mahabubnagar 24/2
SL/BT 2015-16
G.O. Rt No 99,
Central carriageway T(R&B) (R.II)
damaged & formed Dept, Work
Km 0/0 to 20/0 DL Widening 1500 2016-17
sunken portions from Dt:01.03.2016 completed
Km 1/0 to 12/0 (Krishna
Pushkaralu)
Good (Widening &
Periodical Work
Km 20/0 to 24/2 SL Strengthening Non Plan - 2015-16
Renewal completed
required)
FORMAT-I
Non-Plan
SL/CC
Name of Road: Branch road to Krishna road Km.0/0 to 9/2 9/0 2013-14
Total Length: 9.2 8/6 SL/BT
Constituency: Makthal 7/0
Details of Road: 6/0
Type of Improvements / Renewals Work
5/0
Road Surface completed
Reach Nature Amount Status
SL/IL/DL/ Condition GO/A/S/ Ref during
FL of Work Rs. in Lakhs the year 4/0
0/0
FORMAT-I
Non plan
Type of
Improvements / Renewals
Work
1/0
Sl/BT 2014-15
Road Surface completed
Reach Nature Amount Status
SL/IL/DL/ Condition GO/A/S/ Ref during
of Work Rs. in Lakhs
FL the year 0/0
E-in-C(R&B)
State Roads &
Good CRN Memo
Periodical Work
Km 0/0 to 12/241 SL (Wideining No. /EE® 158.1 2014-15
Renewal completed
required) /DEE4
/AEE2 /2014
Dt: -12-2014
FORMAT-I
ROAD WISE DETAILS Strip Plan
District: Narayanpet Km. Carriageway Year Scheme
Division: Mahabubnagar 25/680
Non plan
Name of Road: Makthal to Narayanpt road from 0/0 to 25/680 23/0 2015-16
Total Length: 25.68 21/9
Constituency: Makthal
2014-15 Non plan
Details of Road: 20/2
Type of Improvements / Renewals Work
16/0 2021-22 Non-Plan
Road Surface completed
Reach Nature Amount Status
SL/IL/DL/ Condition GO/A/S/ Ref during 2015-16 Plan
FL of Work Rs. in Lakhs the year
12/0
E-in-C(R&B) State Roads & CRN
Memo.No. Work
Road surface
Km 0/0 to 7/0 DL
wornout
Widening 43/EE(II)/DEE-8/AE(M)/2013-14 615 2014-15
completed
Non plan
DT:22.02.2014
11/0 DL/BT
2020-21
Sunken E-in-C (R&B) SR & CRN, Memo. No.
Km 7/0 to 12/0 Emergency /EinC(R)/ DCE® /EE® /DEE4/ AEE2/ Work
DL portions 136 2020-21
(Appropriate reaches) Repairs 2019-20 Dt:10.01.2020 completed
formed
7/0
E-in-C(R&B) State Roads & CRN
Central Memo.No. Work
Km 12/0 to 16/0 DL carriageway Widening /EE(R)/DEE-4/AEE2/2015 850 2015-16 completed (7/0
DT: .04.2015
damaged to 16/0) 6/0
Plan
Km 16/0 to 20/2 DL Good /EinC(R)/ DCE(R)/ EE® /DEE4/ 277 2021-22 2014-15
Repairs AEE2/ 2019-20 Dt:16.03.2020 progress
1/0
Central E-in-C(R&B) State Roads & CRN Work
Memo.No.
Km 20/2 t0 21/9 DL carriageway Widening 45/EE(II)/DEE-8/AE(M)/2013-14
510 2014-15 completed
damaged (16/0 to 21/9)
DT:22.02.2014 0/0
E-in-C(R&B) State Roads & CRN
Memo.No. Work
21/9 to 25/680 DL Good Widening 45/EE(II)/DEE-4/AEE2/2015 465 2015-16
DT: .10.2015 completed
FORMAT-I
Non plan
Total Length: 18 17/0 SL/BT 2010-11
Constituency: Makthal 9/0
Details of Road: 8/0
NABARD
Type of
Improvements / Renewals
Work
7/0
Road completed SL/BT 2013-14
Reach Surface Condition Nature GO/A/S/ Amount Status
SL/IL/DL/ during
of Work Ref Rs. in Lakhs
FL the year 4/0
carriageway
Periodical Work
Km 0/0 to 4/0 SL damaged & formed - - 2014-15
Non plan
renewal completed
sunken portions 3/0
SL/BT 2014-15
carriageway
Work
Km 4/0 to 9/0 SL damaged & formed NABARD - - 2013-14
completed
sunken portions 0/0
carriageway
damaged & formed
sunken portions in Work
Km 9/0 to 18/0 SL Non Plan - - 2010-11
Jaklair tankbund completed
(improvements
required)
FORMAT-I
GO.129
Constituency: Makthal DL/BT 2016-17
Details of Road: 0/0
Improvements / Renewals
Type of
Road Surface Work completed
Reach Nature Amount Status
SL/IL/DL/ Condition GO/A/S/ Ref during the year
of Work Rs. in Lakhs
FL
G.O.Rt.No.129,
Transport Roads
Widening & Work
Km 0/0 to 0/690 DL Good & Buildings (R-II) 150 2016-17
Strengthening completed
Dept Dt:
27.11.2014
FORMAT-I
Sanctioned PR work
0/0 to 7/2 SL Bad Periodical renewal 350 - Recast
NABARD
in Jan 2022
SL/BT 2010-11
G.O. Rt No 99,
T(R&B) (R.II) Dept, Work
7/2 to 15/0 SL Damaged Periodical renewal 310 2016-17
Dt:01.03.2016 completed
(Krishna Pushkaralu)
15/0
Pushkaralu
Work
Krishna
15/0 to 21/4 SL Damaged Periodical renewal NABARD - 2010-11
GO.99
completed 14/0 SL/BT 2016-17
0/0
FORMAT-I
NABARD
Total Length: 7.1 11/0
SL/BT 2012-13
Constituency: Makthal 10/0
Details of Road: 9/0
Type of
Improvements / Renewals
Work 8/0
Road completed
Reach Surface Condition Nature Amount Status
SL/IL/DL/ GO/A/S/ Ref during
FL of Work Rs. in Lakhs the year
7/0
Periodical Work
Km 5/0 to 8/0 SL Damaged - - 2014-15
renewal Completed
Non plan
6/0
SL/BT 2014-15
Work
8/0 to 12/1 SL Damaged NABARD - 2012-13
Completed
Recast with
Periodical Sanctioned PR
Km 5/0 to 12/1 SL Damaged 118 - current
renewal work in 2022
SSR
5/0
FORMAT-I
GO.130 SL to DL
Rs. in Lakhs
FL the year 24/470
G.O.Rt.No.
130, Transport 2018-19
Widening & Roads & Work
Km 10/0 to 32/4 DL Good 3024 2018-19 IL/CC
Strengthening Buildings (R-II) completed
Dept Dt:
27.11.2014 24/220
24/0 DL/CC
23/0
DL/BT
21/150
20/9 DL/CC
20/0
DL/BT
10/220
10/0 SL/BT