March 2022

WHITEPAPER

Future-proof plant strategies - a how-to guide

Authored by:
-
Amish Sabharwal
Executive Vice President Engineering Business Unit, AVEVA

Executive summary:
In the unrelenting drive to operate more efficiently and sustainably, demand is increasing for
large-scale capital projects. This provides huge opportunities for industrial organizations,
but also requires companies to find innovative solutions to economic and environmental
challenges. The increasing pressure from shrinking margins, global competition, and
scrutiny of green certifications requires more than just an incremental change in how a
capital project is delivered. The industry needs an end-to-end transformation that improves
performance at every stage of the value chain.

Digital twin technologies are providing the means for this shift - connecting people, data,
processes, and technology, while making the most of cloud collaboration. This new way
of working provides unrivaled insight and control, enabling organizations to optimize
performance across capital projects and operations. Teams work more effectively and
efficiently, with fewer risks and less wasted time and resources. With these new advanced
capabilities, industries can design and operate facilities that are more efficient and
greener than ever before. While the benefits of digital transformation are well recognized,
successfully delivering smarter, connected facilities can be challenging. This guide outlines
the practical steps owner-operators, and their engineering, procurement, and construction
(EPC) partners, can take to create the digital plant of the future.
Introduction: Delivering efficient, sustainable plants for the future

A recent AVEVA survey1 of more than 850 industrial digitalization experts spanning sectors including power,
chemicals, energy, and manufacturing found that 85% of industrial businesses expect their spending on digital
transformation to increase in the next 12 months. The power industry expects to make the largest levels of new
investment, with 42% of those surveyed planning a significant upswing in their technology spend.

Power Chemicals Manufacturing Energy

42% 41% 30% 19%


of respondents are of respondents put of respondents of Energy and Utilities
planning to efficiencies and predicted companies say they
increase technology wastage as the that they will make are prepared for
spend top priority a significant digital transition
technology investment spend, highest out of
the sectors surveyed

As industries step into the future, digital twin technology is on track to achieve record efficiency and promote
net-zero emissions. A cloud-enabled digital twin connects all capital project stakeholders around a single hub of
end-to-end data, processes, and tools that span conceptual design through to handover. It provides the data
visualization, models and analytics, training, and maintenance insights required to drive performance transformation
in a way that optimizes asset operations.

02 Future-proof plant strategies - a how-to guide


Key findings

With a cloud-enabled digital twin, teams work collaboratively and can make informed decisions faster at each
step along the way. This improved performance minimizes project and operational risks and reduces wasted time
and resources. Projects can meet environmental and performance targets along with delivering the job on time and
on budget.

Understanding the requirements for the plant of tomorrow starts now. Whether planning a greenfield project
or upgrading or digitizing an existing asset, owner-operators and EPCs can take steps today to create smarter,
connected facilities that give their company a sustainable competitive edge.

85% of businesses plan to increase their investment in digital transformation over


the next three years.

Industries are committed to driving to net zero and tackling climate changes.
Nine out of ten see it as a core responsibility - although many don't believe that
low-carbon industries will be as profitable in the short-term.

Nine out of ten businesses see combining IIoT, AI and cloud with their teams' insight
as key to driving better performance.

AI and automation are required to keep pace with competitors. Skills requirements
are changing with more focus on value-added analytical work.

Nine out of ten agree digital transformation is about bringing change through people.
Investment in the connected workforce is a strong focus at the majority of companies.

75% of companies feel they are on a journey to realize Performance Intelligence


in their business.

03 Future-proof plant strategies - a how-to guide


Digital twins are the key to the plant of the future

It is difficult to imagine a successful plant of the future without an intelligent digital twin supporting the plant’s
full lifecycle.

A digital twin is comprised of a series of interwoven digital threads that link:

y Content – including data sources, models and analytics, Digital twin technologies can incorporate the data
and knowledge available at a point in time at any phase, focusing
on one or more use cases, and grow over time as it
y Context – about individual equipment, sites, processes, proves valuable.
the type of enterprise
You can learn why the digital twin will be central to
y Time – including data from the past, current operations, the future of the industrial sector in our white paper
and extending into the future Engineering the plant of the future: Why balancing
y Perspective – is the team using the data for engineering, sustainability, digital transformation, and efficiency
operations, or optimization and maintenance matters.

Context
CONNECTED WORKER

Enterprise Site Process

Knowledge Design
Multi-experience
visualization
Collaboration Learning

Perspective
Content

Models & DIGITAL Operate


Analytics
DIGITAL TWIN
TWIN

Data
Optimize
Sources
Data Models and
sources analytics

Past Present Future

Guidance

Time

04 Future-proof plant strategies - a how-to guide


Three steps to engineering the plant of the future

While most industrial companies agree that the plant This means you should carefully define goals and
of the future will be smart and connected, getting objectives for this new plant early in the planning process.
the digitalization strategy right is more challenging. You want to design your engineering and execution
Relying on a ‘lifted and shifted’ on-premises strategy processes to target those goals at each step so you can
or creating in-house solutions that don’t integrate deliver the most efficient or sustainable operating plant
smoothly won’t deliver transformation. At best these possible, while delivering the project safely, on time, and
approaches will cause frustration for stakeholders, on budget.
and, at worst, they will lead to spiraling costs without
Project KPIs
improved performance.
To measure success and define relevant KPIs for the
Digital twin capabilities can be maximized by prioritizing
engineering and build phases of the project, evaluate
connectivity at every level and at every phase of a
your managed cost, the construction schedule, potential
capital project – from pre-front-end engineering design
safety incidents, and your estimated carbon impact.
(pre-FEED) through to operations. Choosing an
experienced partner can make the difference between Plant KPIs
success and failure.
When thinking about how the plant will eventually
To help you get started, we’ve broken down the process operate, consider your overall efficiency goals, how you
into three steps: can make operations more sustainable, and what sort
of visibility you need into real-time operations. Also look
Step one: define key project and plant KPIs at how teams will collaborate and share information,
As Dr. Stephen Covey said in his bestselling book, 7 Habits how to support agile decision making, and the insights
of Highly Effective People – which the industry often you will depend on from your digital twin.
repeats – “begin with the end in mind.”

1
Define project
and plant KPIs

2
steps 3
Implement
Structure digital
project teams transformation/
connected
workflows

05 Future-proof plant strategies - a how-to guide


Step two: structure the project teams Step three: implement digital transformation and
Define your project plan, identifying how to structure connected workflows
the project team and ensure modern data sharing Despite massive growth in remote operations during the
practices. Creating a technology infrastructure that pandemic, most engineering and operations technology
supports this new way of working is typically deployed resides on premises. Digitalization is a step in the right
as a collaborative, cloud-based environment that all direction, but make sure you aren’t just doing a lift and
stakeholders can access. shift of data from one series of siloed on-premises
Traditionally, contracts indicated that data would be systems to another.
handed over to the owner operator at specific construction The cloud is where the power of data is truly unlocked
milestones, often in different formats. The real-time by connecting people, processes, and tools augmented
insights and iterative process that are the core of digital by machine learning and AI to deliver unrivaled real-time
transformation require a regular flow of updates and data. insights that don’t exist in individual datasets. The cloud is
This is a new way of thinking and demands consideration where the performance transformation required to deliver
and alignment at the earliest stages of the project. efficient and green plants of the future takes place.
McKinsey describes this as “collaborative construction.”
Creating a cloud-based digital engineering data
Look at which teams will be involved, including warehouse (EDW) that includes all process and 1D, 2D,
engineering, construction, fabricators, joint venture and 3D structural data is the foundation of an industrial
partners, etc. Ensure that all vendors, partners, and digital twin. It provides the necessary context to drive
employees are aligned with how you plan to engineer, insights and enable 3D visualization of any process,
execute, and operate the finished plant. Verify that plant, or enterprise.
individual stakeholder KPIs and processes are designed
to support the overall project-wide goals outlined at the
beginning of the process.

Asset Lifecycle Project Phases Commissioning


and start up

Front End Execute


Conceptual Detailed Execute Execute Operate
Engineering Detailed Design,
Design Design Construction C&SU Operate, Maintain, Optimize
Design (FEED) Procurement & Fabrication

Handover

06 Future-proof plant strategies - a how-to guide


Assess design alternatives through simulation

Today’s investment decisions and design choices are When collaborating on a single platform, project teams
being made in an environment of elevated uncertainty. can reduce engineering efforts by 30%, cut project costs
From the earliest stages of concept development, by 5%, and also improve collaboration and change
engineers need to rely on process simulation to management downstream in the procurement and
understand the potential behavior of the plant across construction phases of the project.
any range of future scenarios. Simulation creates a
consistent, rigorous framework to explore the interplay Execute digitally
between feasibility, reliability, and sustainability. Just like engineers, project execution teams require agile
working practices – but later in the project when the
Process simulation provides insight and knowledge
stakes are higher.
during the early phases of a project lifecycle. It
eliminates errors and mistakes in the design before you Capturing an error in engineering might take a few
have to commit capital and when the cost to correct an hours of time to identify and rectify the issue across
error is the lowest. the other disciplines, but if you have already ordered
equipment and mobilized construction teams the
The Construction Industry Institute (CII) report found
downstream costs, carbon impacts, and time wasted
that a project with a high FEED maturity and accuracy
can spiral quickly.
outperformed projects with low FEED maturity/
accuracy by 24% in terms of cost growth and 12% in Managing change is critical, but it is possible to avoid
terms of change order performance2. problems. This is why project teams are changing how
they work, and leaving their disconnected, manual, and
Connect engineering processes in the cloud client-built procurement and construction solutions in
Connected technologies create the framework and the past.
insights needed to align people, processes and data. The
Now 3D model integration, built-in analytics, and
integration of process and 1D, 2D, and 3D engineering
construction work package (CWP) visualization allow
on a single platform draws efficiencies from conceptual
engineering, procurement, and construction teams to
planning through project completion. Teams can submit
execute according to advanced work packaging and
their projects into detailed design with confidence
integrated project delivery best practices to speed up
that the FEED designs are validated and that they can
project cycles and minimize costs, while reducing the
revalidate at any time as the design matures.
overall risk of inevitable late project changes.
When multi-discipline engineers contribute and share
Integrated, digital workflows in the project execution
data in real time using integrated, on-premises tools or by
phase enables savings of 8-10% of the total installed
leveraging cloud collaboration, they achieve new levels of
cost of a project.
efficiency while reducing costly errors and rework.

Simultaneously-aggregated project data contributes


to the creation of an asset digital twin which is easily
transferred to the cloud to enable connected workers
and ramp optimization programs quickly.

07 Future-proof plant strategies - a how-to guide


Leverage the digital twin throughout The purpose of a capital project is to produce an operating
asset. So too for a digital twin. The need to connect
As data is created, it not only progresses, but also
people, process, and the plant does not end with the
informs the capital project as it becomes the earliest
start of regular operations. In the plant of the future, the
stage of the digital twin. Project updates are no longer
knowledge and effort that create the digital twin during
cumbersome to create and delivered at a point in time,
the capital project become the foundation for the next
but available in real time to all necessary stakeholders
level of value creation, including process optimization,
with just a few clicks. Execution teams can assess and
predictive maintenance, and workforce development.
visualize engineering progression to plan material and
equipment to arrive on time, and schedule construction
teams accordingly.

Unified Unified Unified Project Unified


Simulation Engineering Execution Learning

From the earliest Achieve end-to-end Benefit from a layer Deliver engaging
stages of concept integration of process of risk protection training programs for
development, create simulation and all around your project competency-based
a consistent, rigorous engineering disciplines via enhanced experiential learning,
framework to explore across conceptual process governance, so your operators
the interplay between design, front-end best-in-class change perform better in
feasibility, profitability, engineering and design management, less time and new
and sustainability (FEED) and detailed and data-centric plants start-up
design for maximum construction planning without surprises
capital project efficiency and execution

Digital Twins in action

Forward-thinking companies are already partnering with AVEVA and embracing unified digital twin solutions to
transform capital projects and operations.

Ørsted is driving efficiencies across its wind farm, The solution ensures the efficient management of
hydrogen, and carbon capture design projects using engineering information from multiple suppliers, real-
AVEVA™ Unified Engineering and AVEVA™ Asset time visibility of project progress and information for the
Information Management in the cloud. Connecting entire team, and schedule optimization. Learn more.
engineering teams in the cloud streamlines
Promon Engenharia integrated engineering and
collaboration, driving best practices across the
simulation to synchronize data across engineering
organization while the Asset Information Management
disciplines to reduce project engineering hours by
software enables optimization of the asset performance
15% in design and simulation. This also enabled
using predictive analytics. Learn more.
differentiation by implementing digital twin technology
Aker Carbon Capture is enabling the efficient and for its customers in the project phase, and a new
repeatable design of their productized carbon capture revenue stream by offering to maintain the digital twin
units on the cloud using AVEVA Unified Engineering in operations and maintenance. Learn more.
and AVEVA Enterprise Resource Management on
AVEVA Connect.

08 Future-proof plant strategies - a how-to guide


Conclusion

Industrial organizations face a major challenge in delivering future facilities that are both economically viable and
environmentally sustainable. Unified digital twin technologies hosted in the cloud are the proven route to achieving
these imperatives – providing the unrivaled insights and connectivity required for efficient, productive, and sustainable
industrial plants of the future.

By conceiving of projects with a modern digital twin at the very beginning, you can ensure the entire project
incorporates the latest digital technologies to bring the plant of the future to life.

AVEVA is the only industrial digitalization partner able to support owner-operators and EPCs at every stage of
the value chain. Your success is our mission. Get the most from your AVEVA technology and achieve your desired
business outcomes in record time with our leading support and success offerings.

Sources:
1. AVEVA Report: Approaching the Age of Performance: Insights from industries in evolution.

2. The Maturity and Accuracy of Front-End Engineering Design (FEED) and Its Impact on Project Performance; Construction Industry
Institute; 2018.

Learn more about Engineering


and Information Management About the author
Read our e-book Amish Sabharwal is the Executive Vice
President for AVEVA’s Engineering
Business Unit which is responsible
for delivering simulation, engineering,
design, project execution, operator
training and project management
Learn more about Project Execution software to the Global Industrial Market.

Read our e-book Amish has 25 years of experience


globally within the Energy, Chemicals and Power industries.
Over the past 20 years, he has focused on delivering Digital
Transformation outcomes for Owner Operators, EPC and
Suppliers by leveraging technology to create value added
opportunities to their business processes. Amish is a
Learn more about Operator Training professional engineer who holds a Masters and Bachelors in
Read our e-book Chemical Engineering from the University of Calgary.

© 2022 AVEVA Group plc and its subsidiaries. All rights reserved.
AVEVA and the AVEVA logo are a trademark or registered trademark of AVEVA Group plc in the U.S. and other countries.
All product names mentioned are the trademarks of their respective holders.

aveva.com

You might also like