Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

Form FIN 2: Summary of Cost

1A. Fee for Scope of Consultancy - Buildings (/sft) ATYPICAL DESIGN TYPICAL DESIGN

Hotel / Commercial Hotel / Commercial


Residential Serviced Spaces (Shell & Residential Serviced Spaces (Shell &
Spaces Aprtmnt. Core) Plant / Parking Spaces Aprtmnt. Core) Plant / Parking
Architecture
Civil and Structural
Interior Design
Exhaust and ventilation systems
HVAC
Air-conditioning
Water Supply and RO
Sewerage and STP
Storm Water
Plumbing
Irrigation
Natural Gas
Diesel
FA and smoke detection
Fire and Life Smoke extract system
Safety Stairwell pressurization
Active & passive fire fighting systems
Lighting, Power, distribution scheme
Voice, Data, CATV, PA
UPS and Generator
Electrical
Earthing and Lightning protection
Surveilance Systems and access control
BMS and automation
Vertical Transportation
* all the above discipline rates are deemed to include QS, cost estimation, tender volumes preparation, and all pre-contract services

1B. Fee for Scope of Consultancy - Other services


LEED Design and Administration per bldg * USGBC fee will be paid direct by employer
Infrastructure design per sft * incl. water, sanitation, sewage, electricity and gas distribution, transport, telecom, FLS, etc.
Masterplan Landscaping per sft
BIM / Revit Modelling per bldg

2. Total reimbursable
Top Supervision per month * visit frequency to be mentioned

You might also like