Professional Documents
Culture Documents
Measured Building Surveying TRU
Measured Building Surveying TRU
3D Disto to survey this complex unreachable places. Detailed survey The 3D survey result provided a
structure. data was saved in the memory of valuable introduction to BIM which
the control unit. is further explored in their course.
Room scan
The room scan function produces a Result “The precision and ease of use of
horizontal or vertical profile of your After surveying the building, the the 3D Disto now means I can reduce
room automatically providing a measured data from the survey by teaching about data collection and
detailed plan of the room. All four the students was transferred into spend more time on data evaluation.”
groups used a common control their CAD modelling software. This Stephen Ward
framework so that the different resulted in providing a detailed anal-
data sets could be integrated. Four ysis of the building such as records
separate measuring stations were of the ceiling, floor and roof surfaces,
set up to measure from simultanously. volumes, inclination, falls, height
The hidden corners or points were differences and angles.
measured by using the 4x camera
on the 3D Disto position the laser By integrating the different surveys
dot – without the need to walk to together, the students were able
the target. Wall measurement with to ascertain the 3D model of the
details building. The students were able to
All the wall surfaces including windows, survey all the hidden areas of the
doors, internal partitions and structural building where it would have been
features were measured thanks to impossible to do with a convention-
flexibility of the unit in measuring al tape or measuring device.
curved surfaces, skew walls and
www.leica-geosystems.co.uk