PVsyst - Simulation report
Stand alone system
Project: RUMIPAMBA
Variant: Nueva variante de simulación
Stand alone system with batteries
System power: 240 Wp
PVsyst TRIAL
PVsyst TRIAL
Author
PVsyst TRIAL
Project: RUMIPAMBA
Variant: Nueva variante de simulación
PVsyst V7.2.17
VC0, Simulation date:
07/08/22 11:05
PVsyst TRIAL
with v7.2.17
Project summary
Geographical Site Situation Project settings
Rumipamba Latitude -0.75 °S Albedo 0.20
Ecuador Longitude -78.56 °W
Altitude 3095 m
Time zone UTC-5
Meteo data
Rumipamba
Meteonorm 8.0 (2010-2014), Sat=100% - Sintético
System summary
PVsyst TRIAL
Stand alone system Stand alone system with batteries
System information
PV Array Battery pack
Nb. of modules 8 units Technology Lithium-ion, LFP
Pnom total 240 Wp Nb. of units 1 unit
Voltage 26 V
Capacity 478 Ah
Results summary
PVsyst TRIAL
Available Energy
Used Energy
422.3 kWh/year
407.0 kWh/year
Table of contents
2
3
Detailed User's needs 4
Main results 5
Loss diagram 6
Special graphs 7
PVsyst TRIAL
PVsyst TRIAL
07/08/22 PVsyst Evaluation mode Page 2/7
Project: RUMIPAMBA
Variant: Nueva variante de simulación
PVsyst V7.2.17
VC0, Simulation date:
07/08/22 11:05
PVsyst TRIAL
with v7.2.17
General parameters
Stand alone system Stand alone system with batteries
PV Field Orientation
Orientation Sheds configuration Models used
Fixed plane No 3D scene defined Transposition Perez
Tilt/Azimuth 10 / 0 ° Diffuse Perez, Meteonorm
Circumsolar separate
User's needs
Daily household consumers
Constant over the year
Average 1.5 kWh/Day
PVsyst TRIAL
PV module
Manufacturer
Model
(Original PVsyst database)
Unit Nom. Power 30 Wp
PV Array Characteristics
Generic
Poly 30 Wp 36 cells
Battery
Manufacturer
Model
Technology
Nb. of units
Generic
Adjustable Li-Ion
Lithium-ion, LFP
1 Unit
Number of PV modules 8 units Discharging min. SOC 10.0 %
Nominal (STC) 240 Wp Stored energy 10.6 kWh
Modules 4 Strings x 2 In series Battery Pack Characteristics
At operating cond. (50°C) Voltage 26 V
Pmpp 235 Wp Nominal Capacity 478 Ah (C10)
U mpp 28 V Temperature External ambient temperature
I mpp 8.4 A
PVsyst TRIAL
Controller
Universal controller
Technology
Temp coeff.
Converter
Maxi and EURO efficiencies
MPPT converter
-5.0 mV/°C/Elem.
97.0 / 95.0 %
Battery Management control
Threshold commands as
Charging
Discharging
SOC calculation
SOC = 0.96 / 0.80
SOC = 0.10 / 0.35
Total PV power
Nominal (STC) 0.240 kWp
Total 8 modules
Module area 1.9 m²
Cell area 1.2 m²
Array losses
PVsyst TRIAL
Thermal Loss factor
Module temperature according to irradiance
Uc (const)
Uv (wind)
-0.8 %
DC wiring losses
Global array res.
Loss Fraction
0.6 % at MPP
Serie Diode Loss
Voltage drop
Loss Fraction
0.1 %
PVsyst TRIAL
07/08/22 PVsyst Evaluation mode Page 3/7
Project: RUMIPAMBA
Variant: Nueva variante de simulación
PVsyst V7.2.17
VC0, Simulation date:
07/08/22 11:05
PVsyst TRIAL
with v7.2.17
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
07/08/22 PVsyst Evaluation mode Page 4/7
Project: RUMIPAMBA
Variant: Nueva variante de simulación
PVsyst V7.2.17
VC0, Simulation date:
07/08/22 11:05
PVsyst TRIAL
with v7.2.17
Main results
System Production
Available Energy 422.3 kWh/year Specific production 1759 kWh/kWp/year
Used Energy 407.0 kWh/year Performance Ratio PR 85.99 %
Excess (unused) 0.0 kWh/year Solar Fraction SF 74.89 %
Loss of Load Battery aging (State of Wear)
Time Fraction 25.1 % Cycles SOW 98.7 %
Missing Energy 136.5 kWh/year Static SOW 80.0 %
PVsyst TRIAL
Balances and main results
PVsyst TRIAL
January
February
March
April
GlobHor
kWh/m²
181.5
137.6
165.0
159.7
GlobEff
kWh/m²
161.2
126.6
157.1
158.5
E_Avail
kWh
36.17
28.27
34.98
35.10
EUnused
kWh
0.000
0.000
0.000
0.000
E_Miss
kWh
9.02
13.93
10.28
12.40
E_User
kWh
37.14
27.76
35.88
32.27
E_Load
kWh
46.16
41.69
46.16
44.67
SolFrac
ratio
0.805
0.666
0.777
0.722
May 176.0 181.3 39.37 0.000 10.14 36.02 46.16 0.780
June 167.0 174.5 39.08 0.000 4.13 40.54 44.67 0.908
July 173.7 180.8 39.84 0.000 8.96 37.20 46.16 0.806
August 198.5 201.4 43.96 0.000 5.85 40.31 46.16 0.873
September 170.5 165.8 35.91 0.000 9.05 35.62 44.67 0.797
October 139.0 129.7 29.24 0.000 19.31 26.84 46.16 0.582
November 140.3 126.7 28.24 0.000 15.85 28.82 44.67 0.645
PVsyst TRIAL
December 161.4 142.5 32.10 0.000 17.53 28.63 46.16 0.620
Year 1970.3 1906.2 422.27 0.000 136.46 407.03 543.48 0.749
Legends
GlobHor Global horizontal irradiation E_User Energy supplied to the user
GlobEff Effective Global, corr. for IAM and shadings E_Load Energy need of the user (Load)
E_Avail Available Solar Energy SolFrac Solar fraction (EUsed / ELoad)
EUnused Unused energy (battery full)
E_Miss Missing energy
PVsyst TRIAL
07/08/22 PVsyst Evaluation mode Page 5/7
Project: RUMIPAMBA
Variant: Nueva variante de simulación
PVsyst V7.2.17
VC0, Simulation date:
07/08/22 11:05
PVsyst TRIAL
with v7.2.17
Loss diagram
1970 kWh/m² Global horizontal irradiation
+0.1% Global incident in coll. plane
+0.75%
-0.70%
-3.47%
PV loss due to temperature
PVsyst TRIAL
-0.03% Converter Loss due to power threshold
0.00% Converter Loss over nominal conv. voltage
Missing energy 0.00% Converter Loss due to voltage threshold
25.11% 422.3 kWh Converter losses (effic, overload)
Direct use Stored Battery Storage
37.8% 62.2%
-0.01% Battery Stored Energy balance
-1.91% Battery efficiency loss
PVsyst TRIAL
PVsyst TRIAL
07/08/22 PVsyst Evaluation mode Page 6/7
Project: RUMIPAMBA
Variant: Nueva variante de simulación
PVsyst V7.2.17
VC0, Simulation date:
07/08/22 11:05
PVsyst TRIAL
with v7.2.17
Special graphs
Diagrama entrada/salida diaria
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
07/08/22 PVsyst Evaluation mode Page 7/7