COMPLIANCE SHEET
COMPLIANCE SHEET OF COMMENTS OF PERMANENT STORE (HEAVY & LIGHT FOR DRAWING NO.
PE-DG-412-608-C004, C006 & C012 & DOCUMENT NO. PE-DC-412-608-C001, C002, C003 ON REVISION-
1 AS PER Lr.No.SE/C/TP/E3/AEE/Ennore SEZTPP/F.Store building/D. 947 /17, dt. 29 .08.2017
1. Crane load shall be considered along with wind load. Modify load combination accordingly.
BHEL REPLY: Noted & incorporated. Full lifting load of crane considered along with wind
load in load combinations.
1. Crane load shall be considered along with wind load. Modify load combination accordingly.
BHEL REPLY: Noted & incorporated. Full lifting load of crane considered along with wind
load in load combinations.
2. Load from secondary beam not considered while designing PB2. Please check. Furnish
deflection check.
BHEL REPLY: Noted & incorporated.
2. ALL BOTTOM CHORD CROSS BRACING SHALL BE DOUBLE ANGLE 100X100X6 TYP.
BHEL REPLY: BOTTOM CHORD CROSS BRACING provided is 75x75x6 with one angle
up & one angle down which is safe in design. Bottom chord bracing member is not
fouling with gusset plate and also sufficient clearance is with DSL of crane
(i.e. more than100mm below EL 8.5m(Bottom of Roof Truss). Also confirmation of the
same is taken from mechanical deptt (as attached). Also the same issue discussed with
DESEIN in ERM dated 30/31.08.17.
BHEL REPLY: Noted. 90X90X6 double angle is safe with sufficient margin.
9. PLEASE REVIEW.
BHEL REPLY: Top CHORD CROSS BRACING provided with one angle up & one angle
down which is safe in design.
2
PROJECT: 2X660MW ENNORE SEZ
PE‐DC‐412‐608‐C002‐PERMANENT STORE‐FOUNDATION DESIGN
11. BRACING MEMBER S HALL BE DESIGNED F OR AXIAL LOAD & M OMENT DUE TO SELF
WEIGHT. REMOVE TRUSS COMMAND.
BHEL REPLY: Top CHORD CROSS BRACING provided with one angle up & one angle
down. So KZ parameter is OK.
3
10/30/2017 Zimbra: Inbox (7)
Mail Contacts Calendar Tasks Briefcase Preferences FW: 2x660 MW En FW: 2x660 MW En ENNORE SE
Close Reply Reply to All Forward Archive Delete Spam Actions View
Cc: PANKAJ KAPSIMAY, PEM SOMNATH MISHRA, PEM ANAND NARAYAN, PEM
PE-DG-412-608-C…URE_DETAIL . 7.pdf (131.3 KB) Download | Briefcase | Remove PE-DG-412-608-C…URE_DETAIL . 8.pdf (117.8 KB) Download | Briefcase | Remove
Download all attachments
Remove all attachments
Dear Sir
As discussed, min 125mm clear gap shall be provided from top of DSL support bracket to bo om of roof truss for SG crane in store for subject project.
BHAVNA SHARMA
SR ENGINEER, MAUX DEPTT.
PS-PEM, BHEL
Direct Ph No: 0120-4368567
Mobile No: +91-9810741096
Show quoted text - Reply - Reply to All - Forward - More Actions
Cc: PANKAJ KAPSIMAY, PEM SOMNATH MISHRA, PEM ANAND NARAYAN, PEM
PE-DG-412-608-C…URE_DETAIL . 7.pdf (131.3 KB) Download | Briefcase | Remove PE-DG-412-608-C…URE_DETAIL . 8.pdf (117.8 KB) Download | Briefcase | Remove
Download all attachments
Remove all attachments
Dear Sir
Please ensure the minimum clearance between DSL line & bottom of Roof truss EL 8.5m as depicted in attached files (CCD of light &
Regards
Akshay Kapoor