Professional Documents
Culture Documents
Drying Cabinet Manual
Drying Cabinet Manual
NO : RIC/26(4)/21-22
SIZE : (W) 550 X (H)1300 X (L)400 MM
MODEL NO : RDC275
1
Contents
S.NO DESCRIPTION PAGE NO
1 SPECIFICATION 6
2 INSTALLATION 7
3 OPERATION 8
4 MAINTENANCE 9
5 DRAWINGS 11-12
6 WARRANTY CERTIFICATE 13
2
APPLICATION DESCRIPTION:
Sterilizer is designed for steam sterilization of various types of dry goods products such
as surgical instruments, linen etc.
Infrequent liquid loads (liquids in vented containers) can be sterilized within the unit
using slow exhaust cooling.
However, approximately 3-5 % of the liquid volume of the vented container will be lost
within the process. It is highly recommended to select the suitable process for frequent liquid
loads, to maximize productivity of the unit and eliminate liquid loss.
ELECTRICITY
3
Annexure
SAFETY INSTRUCTIONS
For safety checkup, repair, maintenance and operation of this sterilizer please pay
attention to the following. We will not be held responsible for damages resulting by not
following this safety instructions and CAUTIONS in this manual.
The operator shall wear protective gloves to prevent skin burns, as the sterilizer
maintains high temperature not only during operation but also for a considerable period
of time after use.
The inspection, adjustment and repair, maintenance of the sterilizer should be conducted
by qualified and experienced person. If an inexperienced person tries to repair this unit
may get hurt or greatly damage the unit.
Remove the power supply cord before opening the sterilizer cover. Confirm that the
equipment has been cooled down to ambient temperature.
When sterilizing some wrapped articles, be careful for the wraps of the package not to
contact the chamber wall as there is a danger of fire.
When lifting or moving the sterilizer two or more people should be employed.
Use only vented closures; don’t use screw cap or rubber stopper.
Use only type1 Borosilicate glass bottles. Does not use ordinary glass bottles these
would damage the sterilizer.
After the sterilization is over, please do not open the door fully; leave the door a little
open for few minutes.
Do not shake or move the hot bottle, it may burst.
Sterilizer should be grounded properly.
When not using the sterilizer turn the power off.
When cleaning the door or chamber, does not use wire brush, steel wool, abrasives etc.
Always keep the door clean when closing the door of the sterilizer for sterilization.
4
First of all we thank you for having Reliance Instruments Corporation equipment at
your premises. The Company is having sound “TECHNOLOGY YOU CAN TRUST” for the
last 34 years. The company is having credit of numerous installations in reputed hospitals,
research institutes, Parma manufacturing units in India and Overseas.
Utmost care has been taken at all stages of manufacturing and assembly to ensure good
standards of quality and performance as per your requirement backed by full fledged
guarantee.
To obtain the best out of the equipment and for its long life, it is imperative to pay due
attention towards proper installation, operation and maintenance.
Comprehensive and detailed instructions have been provided in the following pages of this
manual with details of components and spare requirement. We recommend that your
concerned personnel (end user) should study this manual thoroughly before installing and
using the equipment. In case you need any clarification, further information or assistance
please contact our Service Department.
It is important to note the following points with regards to this manual.
1. This manual should be kept safe with the concerned user department throughout the
life of the equipment to procure correct spares.
2. When ordering spares, the following particulars must be clearly mentioned to ensure
correct spare supply
5
SERIAL NO. : RIC/26(4)/21-22
SIZE : 550 X 1300 X 400 mm
VOLUME : 275 L
MODEL : RDC275
DOOR : SS304
WORKING
TEMPERATURE : 60°C
MATERIAL OF
CONSTRUCTION : CHAMBER - SS304
DOOR - SS304
INSULATION - GLASS WOOL
POWER : 4 KW
6
This sterilizer has passed all the tests and approved by our quality control department
before dispatch, for users convenience installation is carried out by our qualified engineer
authorized by us and trains the specified person.
Providing certificates:
1. Instruction manual - 1 No
2. Warranty certificate - 1 No
CAUTION
CAUTION
7
OPERATION
Door open
Materials load
Close the door
Emergency on
Set temperature 50°c PPI control and timer 22 to 30 min.
Blower switch on
Heater switch on
PPI temperature control page press and then enter
In display start yes or no up key press yes key press
Enter press
Cycle process with the run
Temperature reach timer will be count down after set time complete
buzzer will be indicate
Cycle complete after open the door.
8
4.1.PREVENTIVE MAINTENANCE
Before every use check and maintains as follows
Check the chamber weather it’s clean, damaged and well arranged in
appearance.
Check the door locking system as is in perfect operation.
Take out the chamber contents trays and clean the chamber and gasket.
Check the deformation, damage and elasticity of door gasket. If defect replace
immediately.
Method of replacement
9
4.4 TROUBLE SHOOTING INSTRUCTIONS
10