S.NO DESCRIPTION PAGE NO
1 SPECIFICATION 6
2 INSTALLATION 7
3 OPERATION 8
4 MAINTENANCE 9
5 DRAWINGS 11-12
6 WARRANTY CERTIFICATE 13

2
APPLICATION DESCRIPTION:

Sterilizer is designed for steam sterilization of various types of dry goods products such
as surgical instruments, linen etc.

Infrequent liquid loads (liquids in vented containers) can be sterilized within the unit
using slow exhaust cooling.

However, approximately 3-5 % of the liquid volume of the vented container will be lost
within the process. It is highly recommended to select the suitable process for frequent liquid
loads, to maximize productivity of the unit and eliminate liquid loss.

ELECTRICITY

1 PH/50 HZ / 230 VOLTS


Power Required: 4 KW

3
Annexure

SAFETY INSTRUCTIONS

For safety checkup, repair, maintenance and operation of this sterilizer please pay
attention to the following. We will not be held responsible for damages resulting by not
following this safety instructions and CAUTIONS in this manual.

The operator shall wear protective gloves to prevent skin burns, as the sterilizer
maintains high temperature not only during operation but also for a considerable period
of time after use.
The inspection, adjustment and repair, maintenance of the sterilizer should be conducted
by qualified and experienced person. If an inexperienced person tries to repair this unit
may get hurt or greatly damage the unit.
Remove the power supply cord before opening the sterilizer cover. Confirm that the
equipment has been cooled down to ambient temperature.
When sterilizing some wrapped articles, be careful for the wraps of the package not to
contact the chamber wall as there is a danger of fire.
When lifting or moving the sterilizer two or more people should be employed.
Use only vented closures; don’t use screw cap or rubber stopper.
Use only type1 Borosilicate glass bottles. Does not use ordinary glass bottles these
would damage the sterilizer.
After the sterilization is over, please do not open the door fully; leave the door a little
open for few minutes.
Do not shake or move the hot bottle, it may burst.
Sterilizer should be grounded properly.
When not using the sterilizer turn the power off.
When cleaning the door or chamber, does not use wire brush, steel wool, abrasives etc.
Always keep the door clean when closing the door of the sterilizer for sterilization.

4
First of all we thank you for having Reliance Instruments Corporation equipment at
your premises. The Company is having sound “TECHNOLOGY YOU CAN TRUST” for the
last 34 years. The company is having credit of numerous installations in reputed hospitals,
research institutes, Parma manufacturing units in India and Overseas.

Utmost care has been taken at all stages of manufacturing and assembly to ensure good
standards of quality and performance as per your requirement backed by full fledged
guarantee.
To obtain the best out of the equipment and for its long life, it is imperative to pay due
attention towards proper installation, operation and maintenance.
Comprehensive and detailed instructions have been provided in the following pages of this
manual with details of components and spare requirement. We recommend that your
concerned personnel (end user) should study this manual thoroughly before installing and
using the equipment. In case you need any clarification, further information or assistance
please contact our Service Department.
It is important to note the following points with regards to this manual.

1. This manual should be kept safe with the concerned user department throughout the
life of the equipment to procure correct spares.
2. When ordering spares, the following particulars must be clearly mentioned to ensure
correct spare supply

A) EQUIPMENTNAME : DRYING CABINET


B) S.NO : RIC/26(4)/21-22
C) SIZE : 550 X 1300 X 400 mm

3. As continuous development is contemplated the illustrations and description are not


binding.
4. The copy right of the manual remains to us. It must neither completely or partly be
duplicated, distributed nor used without authorization or be given to others.
Our guarantee discontinues once any alterations or modification is done without our
permission.
Any suggestion with regard to further improvement of details given in this manual is always
welcomed. Any suggestion with regard to further improvement of details given in this manual is
always welcome.

5
SERIAL NO. : RIC/26(4)/21-22
SIZE : 550 X 1300 X 400 mm

VOLUME : 275 L

MODEL : RDC275

OPERATION : SEMI AUTOMATIC

DOOR : SS304

WORKING
TEMPERATURE : 60°C

MATERIAL OF
CONSTRUCTION : CHAMBER - SS304
DOOR - SS304
INSULATION - GLASS WOOL

POWER : 4 KW

6
This sterilizer has passed all the tests and approved by our quality control department
before dispatch, for users convenience installation is carried out by our qualified engineer
authorized by us and trains the specified person.

Providing certificates:
1. Instruction manual - 1 No
2. Warranty certificate - 1 No

CAUTION

The sterilizer should not be installed where


ventilation is limited or nearer to the sewage or
water supply, inflammable or toxic gas unit and heat
source.

CAUTION

Wear protective gloves and use 2 or more people


when moving the sterilizer.
Don’t lift the sterilizer by the hook or one side only.

7
OPERATION

Door open
Materials load
Close the door
Emergency on
Set temperature 50°c PPI control and timer 22 to 30 min.
Blower switch on
Heater switch on
PPI temperature control page press and then enter
In display start yes or no up key press yes key press
Enter press
Cycle process with the run
Temperature reach timer will be count down after set time complete
buzzer will be indicate
Cycle complete after open the door.

8
4.1.PREVENTIVE MAINTENANCE
Before every use check and maintains as follows
Check the chamber weather it’s clean, damaged and well arranged in
appearance.
Check the door locking system as is in perfect operation.
Take out the chamber contents trays and clean the chamber and gasket.

Check and maintain in the following manner weekly.

Check the deformation, damage and elasticity of door gasket. If defect replace
immediately.

4.2 REPAIR & MAINTAINENCE


DOOR GASKET

If there is any leakage in gasket replace immediately. Even there is no leakage


or particular defect; it should be replaced at least once in a year.

Method of replacement

Remove the defective gasket and clean the groove.


Insert new gasket in to the groove. Thrust the gasket in the groove of front point
and in the same direction thrust rest portion.
Apply a little bit of lubricant.
Check as the gasket may not partially extended or compressed.

4.3 MAINTENANCE OF OTHER COMPONENTS.

DOOR LOCKING SYSTEM


Therefore, it is a device of high safety and reliability easy to door operation.
Consequently, there is little possibility that a trouble takes place. If necessary,
disassemble in the following manner for checking, cleaning and repairing.
Open the door.
Open lock cover of the door.
Take out the assembly out and oiled, or repair.
After repairing the door is not satisfactory, to replace the new one.

9
4.4 TROUBLE SHOOTING INSTRUCTIONS

SL.NO PROBLEM POSSIBLE CAUSE REMEDY

Control Panel will • No power • Check plug cord


not display • Defective power switch • Check power switch
1 • Request for Service
when power switch
pressed
• Defective heater • Replace heater
• Defective temperature • Request for service
Temperature is not sensor • check heater supply
2
rising • Problem in heater • request for service
supply.

4.5 RECOMMENDED PARTS

SL.NO NAME OF THE SPARES MAKE MODEL QUANTITY


1 Heating element Scot - Magna 1 Kw 4 Nos
2 Gasket Reico 14/15 1 Nos
3 Controller Reico PPI OMINIX 48 + 1 No
4 MCB 2 POLE 1 Nos
5 Contactor Schneider 12 Amps 2 Nos

10