‘5S’ CONCEPT
30 SECONDS RETRIEVAL
5S What is “5S” ?
“5S” क्या है ?
5S began as part of the Toyota Production System (TPS) in Japan,
5S टोयोटा प्रोडक्शन सिस्टम (टीपीएि) के सिस्से के रूप में जापान में शुरू हुआ था।
5S is a Japanese concept for organizing workspace so that work can be performed
efficiently, effectively, and safely. This system focuses on putting everything where
it belongs and keeping the workplace clean, which makes it easier for people to do
their jobs without wasting time or risking injury.
5S काययक्षेत्र को व्यवस्थथत करने के सिए एक प्रणािी िै तासक कायय कुशितापूवयक, प्रभावी ढं ग िे
और िुरसक्षत रूप िे सकया जा िके। यि प्रणािी िर उि जगि पर ध्यान केंसित करती िै , जिां वि
िोती िै और काययथथि को िाफ-िुथरा रखती िै , सजििे िोगों को िमय बबाय द सकए या चोट के
सबना अपना काम करना आिान िो जाता िै ।
“5S” BENEFITS
“5S” करने के फायदे ?
5S
30 SECONDS RETRIEVAL
5S What is “5S” ?
“5S” क्या है ?
5S is made of 5 Japanese Words which starts from Letter “S”
5S 5 जापानी शब्ों िे समिकर बना िै सजनकी शुरुआत “S” िे िोती िै
Unnecessary (गैर-ज़रूरी):
Unsafe
Necessary (जरुरी): Defective
Used for daily work Obsolete or outdated
Used periodically Unused
I am the source Extra or duplicate
5S
“1S”
SEIRI- SORTING-सही चयन
• Red Tag and Red Tag Area: used for storage of Red Tag Material
5S
“1S”
SEIRI- SORTING-सही चयन
• Example of Sorting
BEFORE “1S” / “1S” िे पििे AFTER “1S” / “1S” के बाद
5S
“2S”
SEITON- STRAIGHTEN- (सु-व्यवस्था)
Can you tell which piece is taken out ? क्या आप बता िकते िैं सक कौन िा टु कडा सनकािा गया िै ? 10
5S
“2S” EXAMPLE
Seiri & Seiton are carried out
“2S” EXAMPLE
5S
What is missing now?
2 3 4
1 5
1 2 4 5
A B C D E
Can you tell which piece is taken out ? क्या आप बता िकते िैं सक कौन िा टु कडा सनकािा गया िै ? 12
5S
“2S” EXAMPLE
13
5S
“2S” EXAMPLE
5S
“3S”
SEISO- SHINE- साफ़-सफाई
FG STOCK STATUS BOARD WIP STOCK STATUS BOARD PRODUCTION PLANNING BOARD
RACK-06 भूरा
2 लाल सिन
2. शॉसटिं ग िे सनकिे ररजेक्ट
RACK-07 सफ़ेद मटे ररयि को शॉसटिं ग टे बि पर
रखे िाि सबन में डािना िै ।
RACK-08 ससल्वर
1. ररवकय मटे ररयि को टै ग िगा
RACK-09 लाल कर पीिे सबन में रखे।
STANDARD SIZE
(SAME SIZE OF BINS) SAME SIZE OF VISUALS
FOR SAME PROCESS
TABLES
1S
“5S is a never
ending cyclic
process and in
the center
always is 5thS”
“5S एक कभी न
4S 5S 2S
खत्म िोने वािी
चक्रीय प्रसक्रया िै
और केंि में िमेशा
5S िोता िै ”
3S
5S
“5S” EXAMPLES & TOOLS
DIVISION OF 5S ZONE & ZONE LEADERS
5S
“5S” EXAMPLES & TOOLS
REGULAR AUDITS & TRAININGS
5S Workplace Organization
Levels of Achievement
Needed items are routinely Needed items can be Problem sources are M ethods for housekeeping, Root causes have been
Level 5: reworked/ replaced as retrieved within 30 seconds documented with solutions labeling, inspections, and eliminated and improvement
needed to improve work area and require a minimum defined and implemented work place design are actions focus on developing
Continuously performance number of steps continually improved and preventive methods
Improve shared externally as
applicable
Needed items are routinely Needed items have been Daily inspection occurs to Agreements for labeling, Sources and frequency of
Level 4: assessed against business minimized in number/ size and assess area readiness, housekeeping, inspections, problems are documented as
needs to assure functionality are properly arranged for potential problems are and work place design are part of routine work, root
Focus on and fit retrieval and use identified and fixed consistently followed and causes are identified, and
Reliability demonstrate area corrective action plans are
performance improvement developed
A list of needed items for the Needed items have dedicated Visual controls for Work area agreements for Work team is routinely
Level 3: work area has been locations and are properly equipment, files and supplies needed item labeling and checking area to maintain 5S
documented labeled with required have been established for the visual controls are posted agreements and posting
Make it quantities work area and followed by work team results
Visual
Needed and not needed Needed items have been Key work area items to be Work area agreements are 5S level has been determined
Level 2: items have been sorted and safely stored and organized checked are indentified and identified and documented and posted on the
not needed have been according to frequency of documented for needed item organization communication board
Focus on removed from work area use and work area controls
Basics
Needed and not needed Items are placed randomly Key work area items to be No work area agreements There is no measurement of
Level 1: items are mixed throughout throughout the work place checked during a sweep are exist 5S performance
the work area not identified
Just
Beginning
rev. 04-06-01
5S
“5S” EXAMPLES & TOOLS
RECORD IMPROVEMENTS: BEFORE & AFTER
5S
“5S” EXAMPLES & TOOLS
Step-1. 5S Sensitization
• Sensitizing Organization Core Team (HODs) Step 6. 5S Implementation
Regarding 5S • Implementations as per 5S Norms
Step3. CSM
• Current State Mapping of AS-IS condition by 4S 2S (Systematic
recording video and pictures of all zones (Standardized) Arrangement)
• SPP, FPP to be used
Contact Us:
For On-Site Training & Consultancy @
Shakir Mohd, AYT Business Solutions
+91- 8802382987, 7011382316
info.aytbs@gmail.com, smohd8750@gmail.com