De Vargas, Michelle O.
Biographical Sketch
Educational Background
Academic Affillations:
i
Biographical Sketch
Educational Background
Academic Affillations:
ii
CERTIFICATE OF ORIGINALITY
We hereby declare that this submission is our own work and that, to the best of our
knowledge and belief, it contains no material previously published or written by another person
nor material to which a substantial extent has been accepted for award of any degree or diploma
of a university or other institute of higher learning, except where due acknowledgement is made
in the text.
We also declare that the intellectual content of this is the product of our work, even though we
may have received assistance from others on style, presentation and language expression.
iii
APPROVAL SHEET
In partial fulfillment of the requirements for the Degree of Bachelor of Science in Industrial
Engineering, this research paper entitled, Defects Reduction Using Process Analysis in Blowing
Department of Pepsi Cola Products Philippines Incorporated in Muntinlupa City has been
prepared and submitted by Ma, Elaine P. Ceribo and Michelle O. De Vargas who are hereby
Research Adviser
Approved in partial fulfillment of the requirements for the degree, Bachelor of Science in Industrial
iv
Dedication
First and foremost, I would like to thank my parents Emer and Roger and my sister Julie Ann
who have been my constant source of inspiration, thank you for all your sacrifices and support.
To my thesis partner Michelle for the unexpected adventure and fun moments we had.
I sincerely thank you for understanding, patience and hard work. To our
thesis adviser Engr. Gaytano thank you for guidance and knowledge.
M0EPC
v
Dedication
I would like to extend my most gratitude to my eldest sister Ronalyn De Vargas who became my
second mother that support my financially and emotionally. To my very supportive siblings
Marie Joy and Ronnel to my loving parents Rolan and Nelia thank you for not
nights and tears just to fulfil this piece of hard work, my thesismate Elaine
Ceribo and to the one who help us to accomplish this, our thesis adviser
Engr. Gaytano, thank you. Aside from my family, this piece of hard
MODV
vi
Acknowledgement
With boundless love and appreciation, the researchers would like to boost their heartfelt gratitude
to the persons who share their expertise and precious time in completing this research and also
helped them to bring the study into reality. The researchers wish to acknowledge with deepest
encouragement, insightful discussion, ample time spent and favorable response regarding to
of the thesis and for her unending support during the entire period of the study, for her patience
and guidance during the writing process and effort to make this study possible.
Engr. Maria Corazon Abejo and Engr. Lynnevelle R. Amparo, the oral examination
committee, for valuable advice, understanding, guidance and ample time spent for the
Pepsi Cola Product Philippines Inc. Blowing Department, Engr. Larry Luis Capacete for
giving their precious time and invaluable support and allowing the researchers to get the
The researchers family, to the parents of Ms. Ma .Elaine P. Ceribo, Mr. Rogelio and Mrs.
Ermelita Ceribo to the parents of Ms. Michelle O. De Vargas, Mr. Rosalino and Mrs. Basilia De
Vargas, for giving the researchers their unconditional love, care and tolerance which
vii
made the hardship of writing the thesis worthwhile. Without their support, the researchers could
To all the researchers’ friends, who have always provided advice and support when things
are dishearten and for helping the researcher with their valuable suggestions.
To all people who in one way or another shared their support, either morally, financially
And in above all, by the name of the merciful Lord, God Almighty, for all the countless gifts
that the researchers received before and after the research study and giving the researchers
The product of the research paper would not be possible without their able supervision,
viii
Abstract
Title: Defects Reduction Using Process Analysis in Blowing Department of Pepsi Cola Products
De Vargas, Michelle O.
The research study was conducted to analyze and evaluate the Injection Blow Moulding
Process through Process Analysis to reduce defects in the Blowing Department of Pepsi Cola
Products Philippines Incorporated in Muntinlupa City. The data was gathered through interviews
and actual observations using various instruments such as stopwatch, tape measures and other
measuring devices. Data regarding the existing process of the production in terms of their cycle
time, number of defects, root cause of defects and bottle capacities was used to proposed
improvements and develop a strategy on how to reduce defects. The researchers used Process
Analysis as a tool to identify the causes of the defects. Also, through Process Analysis, the
researchers came up with a proposal to improve the existing process of injection blow moulding.
For further studies, researchers must consider other areas including initial preform shapes, preform
temperature, blowing rates and others areas that are linked to the process.
ix
TABLE OF CONTENTS
Page
Biographical Sketch…………………………………………………………i
Certificate of Originality……………………………………………………..iii
Approval Sheet………………………………………………………………iv
Dedication……………………………………………………………………v
Acknowledgement…………………………………………………………..vii
Abstract………………………………………………………………………ix
Table of Contents……………………………………………………………x
List of Tables…………………………………………………………………xiii
List of Figures………………………………………………………………..xiv
x
Chapter l
Page
Introduction…………………………………………………………………………….1
Definition of Terms……………………………………………………………………7
Chapter II
Related Literature……………………………………………………………………22
Related Studies………………………………………………………………………29
Research Paradigm………………………………………………………………….29
Chapter III
Methodology………………………………………………………………………..30
Research Design……………………………………………………………………30
xi
Respondents of the Study………………………………………………………..31
Research Instrument……………………………………………………………..31
Chapter IV
Chapter V
Summary……………………………………………………………………….66
Findings………………………………………………………………………..67
Conclusions……………………………………………………………………68
Recommendations……………………………………………..........................69
Bibliography…………………………………………………………………..71
Appendices……………………………………………………………………73
xiii
LIST OF TABLES
Table Page
4.4.6 CNX…………………………………………………………………………..61
xiv
LIST OF FIGURES
Figure Page
xv
4.4 Proposed Improvements
4.4.1 Improved Flow Process Chart Machines In-line with Filling Machine…….50
4.4.2 Improved Flow Process Chart of Machines In-line with Palletizer Machine..52
xvi
CHAPTER I
INTRODUCTION
The sequence of interdependent and linked procedure is called process which consumes
one or more resources to convert inputs into outputs. Improvement of firm‘s competitiveness can
impact on the performance of the business with the help of process improvement. In line with
this, is ―Process Analysis.‖ It is a general term for the analysis of work flow in organizations. It
will be a source for the understanding, improvement and management of business processes.
Thru the use of business process analysis method that helps to escalate the efficiency and
effectiveness of a process that defines how well the process achieves its destination. One of the
goals of business process analysis is to clasify and examines every part of the structure, including
the process itself, the participating parties, the information exchange, and others. Accordingly, it
can help identify potential improvements within the process, making it easier to carry out a re-
Originally the concept of blow moulding comes from the glassblowing process. 1880‘s
was a patented method of extruding a celluloid polymer into a parison and blow moulding has
been invented. Since then methods and materials to blow plastics into shapes were very crude
and not suitable for mass production. Until the late 1930‘s that the first commercial machine and
products were available for the manufacturing of blow moulded bottles. The major event that
triggered and fuelled the early years of commercial blow moulding was the development of low
and high density polyethylene suitable for blow moulding and consumer packages.
1
Injection Stretch Blow Moulding- (ISBM) process is similar to the IBS process described
above, in the same sense, the preform is injection moulded. The moulded preform is then
presented to the blow mould in a conditioned state, but before final blowing of the shape, the
preform is stretched in length as well as radially. The typical polymers used are PET and PP
which have physical characteristics that were enhanced by the stretching part of the process.
beverages and snacks in the Philippines over 70 years as their exclusive manufacturer. PCPPI is
a listed company in the Philippine Line Exchange with Lotte Corporation, belongings to the
company of Lotte Chilsung Beverage—one of the biggest beverage companies in South Korea,
as the lead shareholder co-managing with PepsiCo. Having a total of 14 operations across the
country with 700,000 outlets and providing employment throughout the world with their
nation building, inclusive development and ensuring to create a positive impact on society.
PCCPI manufactures and sells products known widely as Pepsi-Cola, Mountain Dew, 7-
Up, Mirinda, Mug, Gatorade, Tropicana, Lipton, Sting, Premier, Milkis, Aquafina, and Cheetos.
These beverages are available in can and in plastic bottles. To lessen the workload they
outsource the manufacturing of tin can beverages to San Miguel Corporation while the PET
bottles are manufactured inside the plant. There are two types of PET bottles which are NCB and
CSD. The responsible of producing these bottles is the blowing department headed by Engr.
Larry C. Capacete.
2
Originally, the blowing department of PCPPI has 6 fully functioning machine which are
BO1 and BO2 both supplies line 5, BO1 produces 850cph while BO2 produces 525cph of CSD
bottles. BO3 and BO4 produces NCB bottles for line 9, each blowing line produces 500cph and
540cph. BO5 is the machine that is in line with line 8; it can produce a maximum of 1000cph of
CSD bottles. Lastly, BO6 produces 2000cph of CSD bottles for line 11.
The blowing department is one of the highest consumers of raw materials they needed to
order at least thrice a week of different variety of products for their weekly production, in
relation the plant director is expected for a high profit contribution come from the blowing
department. The daily production schedule of each machine is given by the head office; this
decision is based on the national PET requirements. All of the blowing machines are bought in
Germany with different specifications. The oldest machine in blowing department is BO1 and
BO2 which is 25 years in use while the rest are 10 years in use. Each machine has two operators
in every shift responsible for manually setting the temperature, speed and air pressure required in
The blowing process of PET bottles is an 8 stage process (See appendices A) first is the
loading of preforms to the machine, and then the preforms are being transported by the preform
elevator going to the sorting device. The device is an initial inspection for the defective preforms
so that it cannot pass through the feed rail. After that, the preform is inserted in loading wheel
then proceeds to the next stage which is pre heating. Now, the preforms enter to a two-part
mould that closes around it. The inside of this mould is shaped exactly like the finished bottle.
Inside, a stretching rod pushes up through the preform, which is suspended with the screw end
facing downward. The rod stretches the preform upward toward the top of the mould -- which is
3
the bottom of the bottle -- and simultaneously blasts enough pressurized air into the preform to
force it against the sides of the mould. This stretch blow moulding process must happen
simultaneously in order to maintain the bottle‘s integrity and consistent shape. The bottle must
attain its coldness or it loses its shape when pressure creep downward in its malleable, heated
state. Finally, the bottles are distributed to its destination lines using the air conveyor. Blowing
machines 5 and 6 are in line with the filler machines and the machines 3 and 4 are connected to
The raw material in blowing department is called the preform. It is a test tube shaped
piece of plastic that is used in this process. PCPPI uses 3 different colors of preform: clear, green
and the neon green for mountain dew. It is also available in different sizes (300ml, 500ml, 1.0L
and 1.5L), each of one costs different from one another. The prices of the preform vary from its
weight and color. These preforms are bought by piece and delivered in metal bins which have
Based on the observation in the blowing department, the researchers found out non-value
adding activities along the process such as delays and bottle necks that generates defects.
Accordingly, the number of defects for the year 2019 increases almost twice compared to the
year 2018 which has a total of 1,053,079 defective bottles which costs ₱3,709,801.64 of defects
while for the year 2019 they have a total of 3,006,345 defective bottles that costs ₱7,567,797.41
of defects. The defective bottles can be sold per kilo, the cost incurred by selling the total scrap
for the 2018 is ₱131,634.875 and it has a total weight of 26,326.975 kgs. while for the year 2019
total weight is 75,158.625 kgs. with a total cost of ₱375,793.125. Selling of the scrap will less
the total amount of the defective bottle to ₱3,578,166.75 and ₱ 7,192,004.29 for the year 2018
process – the machine works with the help of the ring gear, it propels the carrousel that fills the
bottles with syrup and capping the bottles. The number of output varies in the speed and
availability of the machine, thus, a need to perform a quick check of the machine every start of
the production. This contributes 10.81% of the total available time that limits the capacity and
subsequently affects the next processes. Instead of being able to produce additional output there
The non-value adding activities also affect the productivity of the department. The
productivity is computed by dividing the total number of preform used and total number of
bottles produced. The set a target yield in each blowing line is to attain higher than 99.26% and
much better if they achieve 100% productivity. The table shows the computed and summarized
productivity in the year 2019 (See Appendices B). High amount of defects occur in the blowing
department of PCPPI. The defect rate from January to December is 0.95% which is above the
0.74% control limit set by the QA Department. Increasing of defect rate is due longer cycle time
in blowing process and not attaining the bottle capacity of each blowing line which lead to non-
value adding activities in the department and increase of the defect rate.
Based on the stated conditions and problems, the researchers conducted this study to
further investigate the application of process analysis. This results to the reduction of defects and
maximizing the potential capacity of the process by improving and eliminating the non-value
adding activities.
5
Objectives of the Study
The main objective of the study is to reduce the number of defects in Injection Blow
1. To describe the existing process of the Injection Blow Moulding in terms of:
1.2 Productivity
2. To identify the problems in the existing process of the Injection Blow Moulding in terms
of:
2.2 Productivity
To the Plant Director, this study would be a source efficient allocation of the plant
budget and helps to increase the profit. This can also serve as an evaluation of the problems in
blowing department.
6
To the Section Manager, this study would able to maximize the resources and identify
what are the factors affecting the productivity of the blowing machines. This can also help to
To the Employees, this study aims to help them to identify in which of the auxiliary
parts that contributes to the defects. This can also lessen the machine downtime occurring in the
To the Internal Customer, this study would help them to maintain the continuous
production of the PET bottles. This can also contribute to achieve the external customers
demand.
To the Future Researchers, this study would help the researchers to understand the
importance of elimination of defects and the use of the Process Analysis tools. This research will
serve as a reference for those researchers who would pursue the study as this could also be
This study only focused on improvement of the blowing department of PCPPI using
resources and increased performance yield. The factors that would be considered in the study are
the number of preform used, bottles produced and total defects in last year‘s production. The
researchers also determined the factors that mostly affect the increasing number of defects in the
production.
7
Definition of Terms
The terminologies below were defined based on how these were used in the study in
Cycle Time the time between successive units as they are output from the process.
Damaged Thread Neck is a type of defect came from deformation of thread neck
Internal Customer the next process that will benefit with the output of the injection blow
molding process
Mould a hollow container used to give shape to molten or hot liquid material (such as wax or
Machine an apparatus using or applying mechanical power and having several parts, each with a
Odor is a type of defects which is not physically seen but can be identified of having on resin
type of the preform and atmospheric odor that can be absorb by the preform or bottle.
Off Centered Gate is a type of defect that occurs when the center gate or injection point is not
Opalescence is a type of defect which is hazy-white in colour, usually found on the outside
Pre-heated preform is a type of defect brought by exposure of preform on too much heat.
Process Analysis is a step-by-step breakdown of the phases of a process, used to convey the
inputs, outputs, and operations that take place during each phase. It can be used to improve
understanding of how the process operates, and to determine potential targets for process
Productivity is defined as the efficient use of resources in the production and ratio of what is
Strangled Neck is a type of defects that has an ouput of a fold of material in the neck or upper
shoulder.
Under blown Feet is a type of defect came from having a problem in the injection blow
moulding which will have an output of outer corners of one or more feet have not reached the
mould surface.
Waste is any substance which is discarded after primary use, or is worthless, defective and of no
use
9
Wide Parting Line is a type of defects that came from having a broken or worn out lip seal
10
Chapter II
This chapter reviews the discussion of the related information and relevant findings of
unpublished researchers that has been gathered to conceptualize the study. Through these
gathered information, the researchers were able to understand clearly their concern of
Related Literature
PROCESS ANALYSIS
As stated by Russell & Taylor, (2009) process analysis is the systematic examination of
all aspects of a process to improve its operation to make a faster, more efficient, less costly, or
more responsive to the customer with the aide of process analysis tools which are process
According to S. Kumaresh and R. Baskaran (2010) process can be analyze as data for
continous improvement. Process analysis seeks to identify defects into categories and to classify
causes in order to have process improvements. With the help of root cause analysis (RCA) has
played useful roles in analysis of defects of the production. RCA is crucial on identify root cause
of defects and initiate actions to process that the source of defect can be eliminated. To do so
defects are analyze one at a time. The output of analysis will provide feedback which developers
11
PROBLEMS USUALLY ENCOUNTERED IN A PROCESS
According to Sharon Elshang in her article entitled ―Insightful Solutions – The top 3
problems with any business process are found in any organization namely waste, re-work and
A. Waste
The number one problem with my business process is waste - wasted materials
and other resources, wasted effort, waste communication and non-value added activities
environment.
B. Re-Work/Duplication of Effort.
technology.
Using the execution of a business process for a purpose other than for which it is
intended can add a significant amount of lag time and/or expense to a process. These
three problems can be responsible for a large portion of the total cost of execution which
added to the cost of any output (product or service) without any added value to it. That is
why improving the process by reducing or eliminate all of the non-value-added activities
is essential.
12
Process Analysis Steps
Process analysis can only be done by walking to the process from start to finish and
compose six steps to follow which defining the starting and ending points of the process,
explaining the process analysis to those closest to the process, walk through the process,
construct the process flow diagram, Determine Metrics and Opportunities for Improvement and
The sets boundaries of the process are defining the first and last steps of the whole
process. Do not take this step lightly. Biggest problems can be encountered with a process
analysis is if the scope is set incorrectly having tendency of setting large of a scope for large
To develop an in-depth understanding of what they do and the problems they face in the
process is to have an interaction the closest person in the process. The closest to the process need
to understand that this is not a process to find out what they are doing wrong. It is important to
remind them that the vast majority of problems a company faces are due to the way the process
was designed and managed on a day-to-day basis – not due to the people doing the work.
Walk the process from start to finish. ―Walking the process‖ is just beginning at the first step
of the process and go to the last step of the process. The key here is that you are interacting with
13
the person doing the job. You cannot understand what is going on until you look through the
How do you know that the item you are picking is the correct item?
As you go through the analysis, the purpose is to look for opportunities to improve the
process as well as points where the process can be measured. Opportunities to improve the
process include looking for areas of waste and unproductive areas within the process.
Talk to several people on hand to the process so that you are able have a different
perspective on what people think, why they do what they do that will shows the differences in
At this point, you are ready to construct the process flow diagram using the information
you gathered from those closest to the process. This is a detailed process flow diagram not an
14
overview of the process. Once the process flow diagram is done make sure to share it with those
At this point, you have the finished process flow diagram and a good understanding of
the process. While you were walking the process, you saw opportunities for improvement. Don‘t
worry you will see opportunities for improvement. In fact, the less you know about the process
to start, the more opportunities you may see since you don‘t have any paradigms about the
process.
Some of the opportunities are easy fixes, like moving the printer. Others may require a
team to come up with a solution. You want to a have a list of these opportunities to present to
leadership. Helping leadership to solve their problems will endear you to them – you will be like
You should have a list of metrics that can be used to monitor the process over
time. These metrics should be designed to help give feedback to those closest to the process on
how they are doing. The process flow diagram helps point out where measurements can be
made. This is one advantage of doing a process flow diagram. It is also helpful to think about
measuring a process in four dimensions: quality, quantity, timeliness and cost. Some possible
Picking accuracy: the % of line items picked correctly per picker and overall per day (as
measured by the packers) – with a Pareto diagram on reasons for items picked incorrectly
Average number of line items picked per hour per picker and overall
15
Overtime costs for pickers per week
These metrics should be tracked in control chart format where appropriate. These charts
will give the pickers and warehouse leadership the information they need to see how the picking
You are ready to share your final results with leadership and with those closest to the
process. Let them know what you found out and how you can help them improve the
process. Be sure to be grateful to those who cooperate for the analysis of the process.
According to Heizer and Render, (2010) when analyzing and designing processes, we ask
1. FLOWCHART - a drawing used to analyze movement of people or material. Such charts can
16
2. TIME-FUNCTION MAPPING - (aka Process Mapping) is a flow chart with time added on
the horizontal axis. With time function mapping, nodes indicate the flow direction, with time on
the horizontal axis. This analysis allows users to identify and eliminate waste such as extra stop,
3. VALUE-STREAM MAPPING - a process that helps managers understand how to add value
in the flow of material and Information through the entire production process. As with time-
function mapping, the idea is to start with the customer and understand the production process,
4. PROCESS CHARTS - use symbols, time, and distance, to provide an objective and
structured way to analyze and record the activities that make up a process. They allow us to
focus on value-added activities. Identifying all value-added operations (as opposed to inspection,
storage, delay, and transportation which add no value) allows us to determine the percent of
Wastes include Inspection of the task is done properly, then inspection is unnecessary
transportation movement of material within a process may be a necessary evil but it adds no
value); delay (an asset sitting idle and taking up space is waste): storage (unless part of a 'curing
5. SERVICE BLUEPRINTING - a process analysis technique that lends itself to a focus on the
regular basis to help in increasing the capacity, take full advantage of the processes, improve
17
throughput and reduce cycle time. The process analysis tools are operation process charts, flow
The flow process chart contains considerably more detail than does the operation process
The flow process chart is especially valuable in recording hidden costs, such as distances
travelled, delays and temporary storages. Once the non-productive periods are identified, analyst
A careful study of such a chart, giving a graphic picture of every step in the process
eliminated,
18
There are two types of flowcharts that are generally used: product or material and
operative or person. Product chart provides all the details of the events that take place involving
a product or a material while the operative flowchart details how a person performs an operation
sequence.
According to Bergman and Klefsjö (2012), a suitable approach for visualizing complex
processes is by creating a flowchart where the main process is broken down into different boxes,
illustrating the flow in a graphical way. This helps the viewer understand the process and also a
Symbol Definition
19
Storage occurs when an object is kept under control such
that its withdrawal requires authorization.
Cycle Time
From the book Concurrent Engineering by Edward J. Haug (2015) the key to approach in
reduction of defective output is to emphasize on reducing cycle time which was achieved by the
concentrating on reducing of lead times, queues and lot sizes throughout the production. An
emphasis on reduced cycle times motivates defects reduction and corrective actions to keep
defects from recurring. As the cycle times were reduced throughout the quality improved, it
Based on project management by Andy Jordan cycle time analysis also can be used in
analysing a process. It is a technique that examines the total length of time an activity needs to
complete its cycle. It is measured by the amount of time that qn input to a business activity
requires to be transformed to an output. Where a process consist of multiple activities, the cycle
time for any given activity completion including any time between of one activity and the start of
next activity.
There are several ways of reducing cycle times through process redesign, as stated on project
management as follow
Eliminate activities
Eliminate rework
20
Move processing time to activities on the critical path
Productivity
Focused efforts to improve productivity and quality management often results to greater
internal and external satisfaction because they both help prices and reliability, thus achieving
better productivity results with decreasings defects, reduced delayed and lowered cost.
Focused root on the process who the work and the tasks they performed. Standardize policies
and procedures in the company to maximize efficiency. Train all the staff appropriately so that
Find out how other competing companies organize and perform certain jobs to possibly
integrate and therefore lead to improvement. All information is important as it can result in time
Benchmark current process to identify problems, predict future outcomes and measures
productivity gains through key performance indicators for industry. This would also be a way of
product is more expensive. If possible implement automated test that can be performed without
human intervention which will result to easy interpretation or modification if the product is non-
defective or defective.
Determine the root cause of problems and be ready to perform design interventions to
improve or optimize process control production so that will be corrected immediately at the
Measure the productivity and quality management related to customer satisfaction increases.
Collect feedback from employees, customers, suppliers and business partners to know the quality
of product or services.
An overall measure of the ability to produce a good or service is called productivity that
can be measured by how specified resources are managed to accomplish timely objectives as
stated in terms of quantity and quality. Productivity may also be defined as an index that
measures output (goods and services) relative to the input (labor, materials, energy, etc., used to
produce the output) (Franklin, 2001). Created in the real process, productivity gains are
distributed in the income distribution process and these two processes constitute the production
process. The production process and its sub-processes, the real process and income distribution
process occur simultaneously, and only the production process is identifiable and measurable by
the traditional accounting practices. The real process and income distribution process can be
22
identified and measured by extra calculation, and this is why they need to be analysed separately
PARETO ANALYSIS
The Pareto principle describes the case when 80 percent of a total sum or outcome is
generated by 20 percent of the connected drivers that are responsible. It can be applied in many
different areas, for example if 20 percent of sold products generate 80 percent of the revenues.
Vilfredo Pareto was the man who introduced the principle; hence the name the Pareto principle.
The 80/20 rule is another well 34 known terms. Pareto used the principle to describe that 20
percent of Italy‘s population had control of 80 percent of the total wealth in the country. (Ab
Pareto Analysis is conducted for identification of major defects those are contributing in
major rejection percentage. Pareto gives correct identification hence it is conducted. Pareto
shows all defects and their related percentage. It was necessary to find out actual reasons behind
the defects with use of Cause and Effect Diagram for the analysis.
ISHIKAWA DIAGRAM
diagram (because of its shape). The ‗fish head‘ represents the problem being addressed. The
potential categories of causes of the problem are indicated in the ‗fish bones‘ (e.g. men,
materials, methods, machines). Each category of causes is then subdivided again into
(Beckford 2002). An Ishikawa diagram is usually a product of team brainstorming about the
23
Cause and effect analysis helps you to think through the causes of a problem thoroughly,
including its possible root causes. It is only by identifying the main causes that you can
CNX Analysis
process flow diagrams (PF) and cause and effect diagrams (CE) to identify and sort the causes of
variation. The causes are further categorized as controllable (can be held constant ―C‖), noise
(too difficult or expensive to control ―N‖) or experimental (factors which must be investigated
further to understand their impact ―X‖). This analysis is used for identifying factors that can be
Number of Observation
Based from the Time Study Manual of Erie Works of the General Electric company
0.10 200
0.25 100
0.50 60
0.75 40
1.00 30
2.00 20
2.00-5.00 15
5.00-10.00 10
24
10.00-20.00 8
20.00-40.00 5
40.00-above 3
Related Studies
According to the study of Jelica Nuelan Legaspi (2011) entitled “Reduction of Rejects
Corporated Manggahan, Pasig City” it was observed that the injection Moulding Department
experienced difficulty in controlling their rejects to its allowable rate because of the longer cycle
time process held upon the machine and productivity rate of the process. The existing cycle time
is 3091.944 seconds and the productivity rate is 89% but the allowable productivity percentage.
The defective percentage is 9.75% which is above to 3% tolerable limit. Most of these were
caused by rejects such as black spots burn marks, dimensional inconsistency, discoloration sort
shot and sink. On the other hand to analyze the problems investigation of the process is done
using the help of flow diagram, root cause analysis, Pareto chart which classified into
Controllable (C), Noise (N) and Experimental (X) factors with the aide of CNX Analysis. In
analyzing the non-value activities found in the process the proposed improvements made are to
have standard operating process posted in the machines, maintenance check sheets and machine
performance monitoring. Using the CNX analysis it is proposed to have a barrier thermal
insulator and installation of ventilator. The improved cycle time is 2309.73 which will result
2.57% that attain the tolerable limit of defects having an annual savings of ₱ 2,539,489.59.
25
According to the study of Jael et.al entitled, “Process Analysis of Heat Exchanger
Laguna”, in describing the existing processes in heat exchanger in terms of cycle time and
capacity, flow process chart were used in terms of layout design flow diagrams were used. The
existing problems affecting heat exchanger section was the brazing process since it took the
longest cycle time and limited the capacity of the line. This was due to changing of model in the
brazing furnace. Non-value adding activities were found in the process such as transportation
delays and inspection in terms of layout design, problems included the backtracking and long
distances travelled by the operator. In improving the existing processes in terms of cycle time
and capacity, unnecessary motion were eliminated thus increasing the capacity. In terms of
layout design, the total distances travelled were reduced by arranging the workplace. The
economic benefit of the proposed improvement in the heat exchanger section the company will
Based on the study of Dexter Christian Lee (2011) entitled “Reduction of the
observed in the plastic production for the four month defect rate for January-April 2010
amounted to 3.4193% which exceeds the 3% maximum tolerable limit set by the company‘s
quality assurance department. If this situation were to continue, it is estimated that Php2,
319,205.80 worth of unrecoverable cost will be incurred by the company. To address this
problem the natures of the different types of rejects are identified through Pareto Chart and were
analyzed using Ieshikawa diagram as a tool for root causes analysis they determine that four
casual factors namely: Man, Material, Machine and Environment contribute to the defects. Then
26
CNX Analysis was applied to classify the root causes as Controllable, Noise or Experimental
Factor. The identified noise factors were neglected in the study because they are hard to control.
The controllable factors identified were group into three. Actions and Controls were proposed for
each group. The proposal made for controllable factors are organizing the training program,
redesigning existing forms and proposing new forms, posting guidelines in workstations,
assigning a line leader for material handlers, strict implementation and proposing new
monitoring procedures for mold shut count and document and sack sauge. The experimental
factors were dealt with by introducing alternatives for each of them. These alternatives were
evaluated through the use of Factor Rating Method. The alternatives chosen to deal with the
experimental factors are purchasing a digital thermometer, exhaust fans, industrial fans, and anti-
fatigue floor mats, rehabilitating the molds, making a strainer using nylon screen netting
changing the material mixing ratio 80-20(virgin-grinded). Finally, cost and benefit evaluation
was conducted and it was estimated that by implementing all the proposal, the company will
realize a defect rate reduction of 2.4177% and ₱1,1462,490.24 worth of annual savings which
K. Masula, A. Pabulayan and J. Solano stated on their study entitled "Process Analysis
Gateway Business Park Gen.Trias, Cavite" the existing cycle time of cleaning, replacement
and rebuild process were 22245.91 seconds, 2513.38 seconds and 557.53 seconds respectively.
The total distance incurred in existing cleansing, replacement and rebuild was 370.78 ft, 357.18
ft, respectively. The contact socket cleaning and elastomer replacement has unnecessary
activities such as Ultrasonic cleaning which affects the time in completing the process. The
repair tables used by the contact socket technicians were not properly located as it should be near
27
both in CIG or workstation a Laser cleaning machine. There was no specific location for the
receive items and those by the CIG (Contact Inventory Group). Manual laser cleaning was done
instead of automatic laser cleaning which the real function of the machine. Printing of list of item
received was added to the activities done by the technicians at Contact Maintenance Area. There
were two proposed improvement in terms of process and layout: eliminate the unnecessary
activities reduces the total cycle time by 1547.30 seconds, 1544.64 seconds and 92.40 seconds
for cleaning, replacement of elastomer and rebuild respectively. Relocating or arranging the
workplace the total distance was reduced to 227.61 ft for the contact socket cleaning, 214.61 ft
for contact socket elastomer replacement and 192.73 ft for contact socket rebuild process.
Based on the study Travis Roxas (2009) entitled ―Scrap Reduction on Polycarbonate
Manufacturing Inc.‖ the company is encountering higher scrap rate for PC Lexan 124
averaging at about 27% to 33% against the target scrap rate of 25%. The target scrap rate must
be achieved or even attain lower rate. PC constitutes the highest raw material usage in kilogram.
Due to its voluminous usage, it is a major contributor of scrap material that mounted to almost
20,000 kg from July 2007 to April 2008. And on the average, it contributes to almost half of the
In able to give possible recommendation in reducing the scrap cost for PC, PC scrap is
analyzed. Upon analysis, it is determined that 75% of PC scrap is attributed to sprue. 22% is
attributed to rejected part while 3% is attributed to start up scrap. Since the sprue is a component
of the molded part that cannot be easily changed because of design complexity considerations,
the study relatively focused on the reduction of scrap due to start up and rejects. Using
improvement flow diagram, causes of the prolonged start up procedure is determined. Primarily,
28
incorrect machine parameter setting is the reason for this. For the rejects, Pareto diagram is used
to determine the focus of the analysis. It is known that 9 of the 27 possible defects contributed
82.3% of the total number of rejects. After this root cause analysis is done through Ishikawa
diagram.
Recommendations are identified to answer the problems regarding the rejects and start
up. Cost benefit analysis is done to determine the feasibility of implementing the said
recommendations. An annual total cost of Php101,683.90 was computed and total annual benefit
of Php328,914.25, in effect, the recommendations will reduce the total scrap rate by about 4.25%
Research Paradigm
INPUT
OUTPUT
Existing Process of
PROCESS
Injection Blow Flow Process Defects Reduction
Moulding in Pepsi Chart Using Process
Cola Products Pareto Analysis Analysis in Blowing
Philippines CNX Analysis Department of Pepsi
Incorporated in Ishikawa Diagram Cola Products
Philippines
Muntinlupa City Incorporated in
Muntinlupa City
CONCEPTUAL FRAMEWORK
The figure above shows the inputs and process necessary for the output of the study. The
researchers determined the existing process of injection blow moulding in terms of: cycle time
and productivity of each blowing line. For the process of the study the researcher used the
process analysis tools in order to achieve the desired output with the help of Pareto Analysis,
29
Ishikawa Diagram and CNX Analysis. To sum up the outcome of the study is reduction of
City.
30
Chapter III
Methodology
This chapter presents and discusses the procedures that the researchers follow in
conducting the study. It includes research locale, respondents of the study, research design,
Research Locale
The study was conducted at Pepsi-Cola Products Philippines Inc. Plant located at
National Highway, Brgy. Tunasan Muntinlupa, Metro Manila. It is the biggest plant of PCPPI
The operators of the blowing machines which has knowledge about the factors that affect
to the occurrence of defects. The maintenance engineer who is responsible for any problems
encountered in blowing machines including the auxiliary parts and the section manager of the
blowing department.
Research Design
The researchers used descriptive type of research. They also evaluated the existing
problems in the department. The gathered data was given by the section manager and interview
31
Sampling Design
The number of observations used in the study was based on the Time Study Manual of
Erie Works of the General Electric Company developed under the guidance of Albert E. Shaw.
The given table would be used per element of the process, specifically the element with 6
seconds below is required to have 200 observations, 15 seconds is 100 observation, 30 seconds is
Research Instrument
The researchers used personal interviews and actual observations in order to gathered
information necessary for the investigation and analysis. The researchers used the tools of
process analysis. The data are gathered through primary and secondary sources. The researchers
obtained the actual data for primary sources and secondary sources will be from internet,
unpublished thesis and other reading materials that are relevant to the study.
1. The researchers asked permission to the Plant Director and Section Manager of PCCPI in
2. The researchers requested to the Section Manager to have a copy of the necessary
3. The researchers interviewed with the operators and those who are directly involved in the
process.
4. Conducted an actual visitation to identify other relevant factors that may affect the study.
32
Chapter IV
This chapter presents all the gathered data, analysis, and interpretations made by the
researchers using figures, tables, and charts to answer the objectives of the study. This chapter
also presents the different approaches to process analysis employed in Pepsi Cola Products
Philippines Inc.
Total No. 21 15 4 2 2 44
Distance
No Elements Symbols Time(secs.) Methods Recommendation
(ft.)
Transport the Preforms from warehouse to
1 220.67 75.9
conditioning area
Maintain the temperature level of 28°C-30°C in the conditioning
2 Store the preforms in the conditioning area 86400 16.4 area to prevent the moisture in the preform that could cause
bubbles
Replenish the metal bin immediately to avoid running out of
3 Load the preform to the tipper 95.56
preforms
4 Pour the preform to the hopper 71.34
Regularly check the hopper to ensure that there is sufficient
5 Store the preforms into the hopper 53.8
supply of preform
6 The hopper feed the preform to belt conveyor 4.76
33
10 Pass by to the preform rail 15.17 1.5 Transporting the preform is slower due to machine problem
12 Pass by to the preform rail 25.33 1.5 Eliminate after combining the two elements
13 Inspect the preform dimensions 0.2 Combine with the dedusting to reduce time
Inspect the movement of the bottle and make sure that it will
22 Transport the bottle using air conveyor 117.06 12
not get stocked and cause the bottle to fall
31 Capping 0.2
Monitor the level of the caps in the dispenser to avoid delay
34
Eliminate the air conveyor full by improving the labeller to
37 Stacking up of the bottles 500.96
reduce the number of preform
The label holder drops the plastic to the body of Ensure the number of plastic labels in the machine to avoid the
38 3.35
the bottle delay
The bottle pass through the hot air that tightens
39 3
the plastic label
44 Transfer to Warehouse
Figure 4.1.1 shows the existing flow of events represented by symbols of operation,
distances and frequency of travel, temporary storages, delays, and inspections happened in the
blow molding process at PCPPI. The time elapsed measured in seconds, distances in feet, and
method recommendation are also included. The flow process chart revealed a total time of
87740.81 seconds with the total distance travelled of 145.9 feet consuming. For the existing
35
Flow Process Chart (In-line to Palletizing Machine)
Total No. 13 19 3 2 37
Total Dist. 49 ft 0
36
Eliminate through automation because the
23 Arrange the bottle manually 2907.7 machine can automatically arrange the bottle.
29 Strapping 187.22
Figure 4.1.2 Existing Flow Process Chart of Blowing Process Inline to Palletizer
Figure 4.1.2 shows the existing flow process chart of the blowing machine in line with
the palletizer machine. The chart revealed a total time of 33637.04 seconds with the total of
distance travelled of 49 feet. For the existing method, the machine can process 1 metal bin in 2 to
3 hours.
37
Pareto Analysis
Figure 4.2 Pareto Chart of defects distribution for each types in Blowing Department of PCCPI
from January to December 2019
The problem with large amounts of defective products was analyzed through specifying
which type of rejects constituted the most of these in the injection blow moulding process. A
Pareto chart was used to identify the top type of rejects. As shown in Figure 4.3 from the 10
types of defects that may occur in blowing department, four of these contributed the 85.67% of
the overall defects for the whole year of 2019. Using the Pareto Chart it was identified that wide
parting line, pre-heated, off centred gate and under blown feet were the top types of defects in
the process.
38
4.3 Root Cause Analysis of the Identified Problems
Incorrect
installation of Breakage of
mold Lip seal
Too much heat
profiling Monitoring of chiller
temperature is not done
because no checklist is
required
WIDE PARTING
LINE
Hindrance on
Incorrect machine parameter input entering cold water
Decrease in the chiller
machine temperature
Man Machine
Figure 4.3.1 shows the root cause analysis of the wide parting line of the bottle. Based on
the Pareto analysis, wide parting line is the highest type of defect present in the department with
a total of 1,001,844. After further investigation it is proven that this defect occur because of the
monitoring of the chiller is not done because no checklist is required upon the process. Chiller is
an auxiliary part of the blowing machine responsible for converting the hot water from the
blowing machine into cold water in order to prevent overheating. Due to continuous process of
blowing machine the regulator must maintain the 12⁰ water temperature levels. Lower than this
temperature, ice formation occurs hindering the cold water to flow. In failure to supply cold
water, it increases the possibility of overheating that leads to lip seal breakage. Lip seal is part of
the mold that tightens the two halves of the mold together that any leakage of chemical, oil
39
lubricants can be protected during the most important and crucial part of the process which is the
Man Material
PREHEATED
PREFORM
Method Machine
Figure 4.3.2 shows the root cause analysis of the preheated preform. Based on the Pareto
analysis, pre heated preforms the second to the highest type of defect present in the department
with a total of 729,348 pieces. According to the investigation of the researchers this defect
occurs because the ring gear has insufficient lubrication causing to machine stoppage. The ring
gear propels the carrousel that fills the bottles with syrup and capping process. If the filling
process stops, the bottles in the air conveyor are stacking up and generate a signal to the blowing
machine to stop the process. In every machine stoppage it means that the last and the first
preform feed to the preheating will be rejected because of its imbalance exposure to heating
radiators.
40
Method Material
OFF ENTERED
GATE
Loose bearings of
Mandrel
Incorrect Bent stretch rod
Malfunction of
installation of base mandrel
mold Due to continuous
Lack in preform usage of machine (N)
heating
Man
Machine
Figure 4.3.2 shows the root cause analysis of the off centered gate of the bottle. Based on
the Pareto analysis, off centered gate is a type of defect present in the department with a total of
729,348 pieces. After further investigation it is proven that this defect occur because continuous
usage of the machine that could cause the loose bearings in the mandrel. Mandrel holds the
preform in traveling inside the heating oven; mandrels are designed to be rotating so that the heat
is equally distributed to the preforms. The preheating step is aimed at bringing the PET preform
into a pliable state before the blowing stage of the process. During preheating, the preform
temperature profile is very critical for manufacturing a bottle with desirable mechanical
properties. The required temperature for this process is 78°C, declining temperature causing the
stretch rod to bend due to hard preform then the distribution of air pressure in the injection blow
41
Method Material
Excessive base
Monitoring of the level Incorrect mold diameter
of air pressure level is installation
not done because no
checklist is required. (C)
UNDER BLOWN
FEET
Malfunction of air
compressor Lack in air temperature
Incorrect machine
parameter input Insufficient final blow
Man
Machine
Figure 4.3.4 shows the root cause of the under blown feet. Based on the Pareto analysis,
underblown feet is a type of defect present in the department with a total of 194,592 pieces.
According to the investigation the defect occurs because of monitoring the level of air pressure
in the air compressor is not done because of no checklist is required which will results in lack of
air pressure in final blow. In the blowing process the preheated preform is being blown to the
cavity of the mold using air pressure that pass through the stretch rod. The required pressure to
fully blown the mold cavity of the preform is 22-38 bar. Insufficient pressure means that it will
not reach the full shape of the mold cavity specially in the base part of the mould where the feet
42
Environment Method Material
DAMAGED
THREAD NECK
Incorrect
machine Misalignment
set up Misalign clutch of transfer arm
Machine vibration
Man (N)
Machine
Figure 4.3.5 shows that the root cause of damage thread neck is the machine vibration.
Damage thread neck is a type of defect which is present in the blowing department with a total of
102,429 pieces. Thread necks are originally intended to secure that after refilling of the syrup
into the bottle it will be sealed through capping. Based upon deeper investigation the thread
diameter must be 28 mm in measure but due to machine vibration while performing the process.
The thickness of the thread diameter decreases because of the ignition of the thread on the
mandrel.
43
Environment Method Material
Thin neck of
Too much heat Set point the preform
exposure In temperature
conditioning too high
area.
STRANGLED
Misalignment of the NECK
Set point gripper
temperature
Malfunction of
too high
Malfunction of Neck Cooling
quenching (C)
Misalignment of
Clutch
Man
Machine
Figure 4.3.6 shows the root cause for strangled neck is the malfunction of the quenching
system of the chiller machine causing the malfunction of neck cooling. Neck cooling starts from
entering of the preform to the heating oven up to the final blow in the injection blow moulding
absence of this will result to strangled neck when the bottle gripper transport it to the air
conveyor. This type of defect is mostly occurred in the bottle discharging the bottle in the mold.
The temperature of the orifice, thread and neck ring must be 30 ° because too much heat can
bring solubility of the bottle specially in the upper base part of the bottle. Malfunction of the
cooling tower that balance the temperature in the neck cooling is one of the consideration in
44
Environment Method Material
Moisture in
Improper preform
storage in
Improper
conditioning
area lubrication of
mould cavity
BUBBLES
Carelessness
in monitoring
Lubricant spill
the air dryer
Malfunction of air
dryer
Drain valve
failure (C)
Man
Machine
Figure 4.3.7 shows the root cause for bubbles in the bottle. According to the Pareto
analysis, bubbles in the bottle are a type of defect present in the department with a total of 86,770
pieces. After further investigation and observations it has been discovered that the main cause of
the defect is the drain valve failure. A drain valve failure cause the compressed air dryer to be
flooded with the liquid water causing the existence of moisture in the air.
45
Environment Method Material
Incorrect set
Excessive wall thickness of
of heating
Monitoring of the Preform
lamp heating radiator is
not done because
checklist is not
Insufficient required. (C)
temperature
PEARLESCENCE
Set point
temperature Water chiller Excessive heat exposure in heating radiator
too high malfunction
Imbalance of cooling air
Man Machine
Figure 4.3.5 shows that the root cause of pearlescence is the monitoring of heating
radiators is not done because checklist is not done. Pearlescence is a type of defects that is
present to the bowing department with a total of 72,317 pieces. Based upon deeper investigation
opalescence occurs when the preform undergoes in the insufficient heat exposure in heating
radiators where the pre-heating of the preforms happen. Heating radiators is responsible for the
distribution of balance heat in the preform before entering to the mould and perform the injection
blow moulding process. The temperature for the heating of the preform is 78°C. But the
temperature are changing from time to time due to heat that produces by the machine, in relation
to this to avoid this kind of defects the operator must check the temperature of the heating
radiators.
46
Environment Method Material
Incorrect set
Excessive wall
of heating
Monitoring of the thickness of Preform
lamp
heating radiator is
not done because
Insufficient checklist is not
temperature required.(C)
OPALESCENCE
Cooling tower
malfunction
Incorrect parameter of heaateing radiator
Set point
temperature too high Imbalance of cooling air
Man Machine
Figure 4.3.5 shows that the root cause of opalescence is the negligence of the operator to
check the heating temperature of heating radiators. Opalescence is a type of defects that is
present to the bowing department with a total of 42,527 pieces. Based upon deeper investigation
opalescence occurs when the preform undergoes in the excessive heat exposure in heating
radiators where the pre-heating of the preforms happen. Heating radiators is responsible for the
distribution of balance heat in the preform before entering to the mould and perform the injection
blow moulding process. The temperature range for the heating of the preform is 2500 watts. But
the temperature are changing from time to time due to heat that produces by the machine, in
relation to this to avoid this kind of defects the operator must check the temperature of the
heating radiators.
47
Environment Method Material
Supplier
Fault
No random
Improper Too much sampling upon Problem in
storage in the lubrication delivery (C) Resin Type
conditioning
area
ODOR
Carelessness Lubricant leakage
in monitoring Malfunction
the cover of of hot oil
the metal bin generator
Incorrect hose
connections
Man Machine
Figure 4.3.10 shows the root cause for odor is that there is no random sampling checking
upon the preforms delivery of the supplier. PET is short for polyethylene terephthalate, the
chemical name for polyester. The basic building blocks of PET are ethylene glycol and
terephthalic acid, which are combined to form a polymer chain. The resin pellets are then heated
to a molten liquid that can be easily extruded or molded into items of practically any shape.
Wrong measurement of ingredients has an effect on the finished product which is the preform.
Sometimes the supplier of the preforms has problem in the process of their product. Preforms are
sensitive in terms of dust, chemical, and atmospheric odor preforms can easily adopt its
environment. The defective preforms are returnable and the supplier is willing to replace the
preforms.
48
CNX Analysis
The root causes of the defects in the department are identified in the Ishikawa Diagram
and were classified in the CNX analysis. These were categorized under controllable (C), noise
The noise factors identified are beyond the scope of the study since these were difficult to
control. Including these were the machine causes such as loud noises and vibration causing the
damage thread neck defect in the bottles. Conversely, controllable factors were root causes
associated in non-compliance of the company‘s policies and standard operating procedures due
to negligence of the operators or the management. Table 4.3.11 shows the controllable factors
Controllable Factors
Monitoring of the air pressure level is not done due to absence of required checklist
Monitoring of the heating radiators is not done due to absence of required checklist
Malfunction of quenching
49
Non-existent of the preliminary inspection of the raw materials
Experimental factors, on the other hand, were problems that were subjected to further
analysis and additional study to evaluate its alternatives. Apparently there are no experimental
Total No. 23 13 2 0 2 40
Total Dist.
129.5 16.4 145.9
Total Time 162.27 478.02 86445.35 6.75
87092.39
Distance
No Elements Symbols Time(secs.) Methods Recommendation
(ft.)
Transport the Preforms from warehouse to
1 220.67 75.9
conditioning area
2 Store the preforms in the conditioning area 86400 16.4
21 1.15
Discharge from the air conveyor
22 10.5
Transport using conveyor
23 1.15
Grip the neck of the preform to the rinser
24 6.8
Rinse the bottle with clean water
17 Insert the pre heated preform in the mould 1.15
21 1.15
Discharge from the air conveyor
22 10.5
Transport using conveyor
23 1.15
Grip the neck of the preform to the rinser
24 6.8
Rinse the bottle with clean water
25 1.12
Feed the bottle to the starwheel
26 4.7
Transport the bottles to the filling machine
27 6
Fill the bottle with syrup
28 0.2
Capping
29 1.15
Discharge to the starwheel
30 6.9 3
Transport to coding and inspection machine
Pass through the laser that prints the code
31 0.79
to the bottle
The camera scan the syrup level of the
32 0.2
bottle
37 15.6 7
Transport the product to the caser machine
Arrange the product into the desired
38 4
number per case
39 4
Sealing the products with plastic
40
Transfer to Warehouse
Figure 4.4.1 Improved Flow Process Chart Machines In-line with Filling Machine
Figure 4.4.1 shows the proposed process chart for the production for injection blow
moulding and illustrates the step by step process including all operations, transportations, storage
and delays. Delays are eliminated due to automation of the palletizing machine. The total cycle
51
Proposed Improvements for Machines In-line with Palletizer Machine
52
22 Pile up the bottle for arrangement 21
26 Move to Strapping 18
27 Strapping 185.35
28 Move to Wrapping 45
30 Wrapping 245
Figure 4.4.2 Improved Flow Process Chart of Machines In-line with Palletizer Machine
Figure 4.4.2 shows the proposed process chart for the production for injection blow
moulding and illustrates the step by step process including all operations, transportations, storage
and delays. Delays are eliminated due to automation of the palletizing machine. The total cycle
53
CNX Improvements and Control
The identified Controllable factors (C) were grouped on their proposed action.
The classified groups are the following: (1) Supervision; (2) Daily PM Schedule; and (3)
Training
SUPERVISION
Since the operators were required to operate the machines that will affect to produce non
defective products, it is important that they have knowledge about the significance of quality and
the important parameters of the machine. Educating the operators aided them in further
understanding of the process. In the same way, continuous training was also a requirement in
providing them new knowledge about the new technologies of the machine.
55
Table 4.4.2 Summary of the proposed improvements of controllable factors
PM Schedule
ensure the quality of a PET bottle. This will ensure that the operator, maintenance personnel and
the supervisor are aware of the main problem that causes a defective product with the aide of this
Training
operation some benefits of this are less defective product to produce, reductions in unplanned
machine downtime, permanent reduction in cycle times, safer production floor, higher profits,
57
Proposed Daily PM Checklist
58
Figure 4.4.3 Daily Maintenance Check sheet
Operator error is one of the common causes of defects since they are the one who are
involve in controlling the process and have the ability to identify failure during production.
Empowers operators should be able to diagnose and problem solve their machines. The main
objective of the daily maintenance check sheet is to assure that the machine and auxiliary parts
were in good running condition or identify the problems to know what corrective actions to do.
59
Training
Operators were required to undergo training and briefings before they were actually
operate the machines. However, the knowledge they earned from the training was still
insufficient to effectively manage any difficulties encountered inside the production such as
adjusting the parameter setting of the machines. To deal with this problem, refresher training
must be conducted every year as a review about the blowing machines and for the operators to
The summary of cost required for the refresher training is presented in Table 4.4.4
TRAINING COST
Number of 48
Operators
Training 16
150 50
Duration (hr)
Facilitators 3 1,000/hr
60
Summary of Improvements
Malfunction of quenching
Implement a daily check list for the machines
Drain valve malfunction
61
Economic Benefit Analysis
Table 4.4.6 shows the capacity increase in each of the blowing section and no. of
The table 4.4.6 shows the economic benefit of additional output capacity and the number
of reduce defective output considering the CNX Analysis are fully implemented. The cost of
annual savings varies based upon the capacity of the blowing machine. Using the process
62
Repair Costing of Palletizer Machine
Description: Repairing the palletizer machine will generate an increase in productivity of the
Labor Cost/Hour
Peso
No. of Repair Oversees Wage No. of
Manpower Conversion
Technician Needed Payment Range Repair Days TOTAL
4 $18.19/hour 12 $6984.96 ₱356,232.96
Material
₱2,805,000
Cost $55,000
Annual Savings of Repairing Palletizer Machine
Number of
Employees Annual Wage TOTAL
Reduced
6 221,443.2 (6) ₱1,328,659.2
The table shows the costs in repairing the palletizer machine of PCPPI. It can be seen that
the cost of the materials is ₱2,805,000 converted in dollars because the materials needed in the
palletizer will be coming from the original manufacturer of the machine located at Germany. The
maintenance technician that will repair the machine will also come from Germany because they
are the ones who know all the parts of the machine, tis will cost ₱356,232.96 assuming that the
repair will only took 12 days. In contrary, the company will benefit an annual savings
63
Installation of Digital Room Thermometer for Conditioning Area
Fluctuations in temperature and relative humidity could cause moisture in the preform. In
blowing department conditioning area has no digital room thermometer, two digital
thermometers are needed which has a maximum cost of ₱ 3,000.00 with a maximum usage of 2.5
years.
Thermometer
64
Combining the Dedusting And Dimension Inspection Machine
A preform deduster from KHS can be located upstream of an inspection system. Using a
compressed air lance inserted into each preform, the system removes unwanted particles at a rate
of up to 81,000 preforms/hr. The cleaning system is supported by an extraction unit which ejects
all particles into an easy-to-clean collection vessel. As a result the risk posed by contaminated
preforms is further minimized when used in combination with an inspection unit called the
dimension checker This machine costs $25,000, the shipping and transportation cost is not yet
65
Additional Output in the Injection Blow Molding Process
Cycle Productivity
Cycle Output/hr Time Productivity Productivity
Time
Time
Table 4.4.3.4 summarizes the benefits of the existing and proposed time for the inline
and palletizer production. The blow moulding process took 29.52 to produce a PET bottle. Based
on the table the inline process saved 648.42 seconds after improving the process which means
additional 21 bottles can be manufactured. The blowing machine in line with the palletizer saved
3301.01 seconds and can manufactured 111 additional bottles. In terms of productivity, the inline
increases by 0.20% and 0.79% for the palletizer machine. The target productivity is 99.26%
which can be improved to 99.46% and 100% for inline and palletize consecutively.
66
Chapter V
study. The researcher used descriptive type of research in analyzing the process of injection blow
Summary
From the year 2019 the Blowing Department of Pepsi Cola Products Philippines
Incorporated experienced large number of defects. This defect exceeded over ₱7,567,797.41
million which is worrisome for the manager of the department. This research study aims to
reduce the number of defects in the existing process of injection blow moulding and perform a
root cause analysis for the defects contribution. After analyzing the existing process the study
will use and apply some process analysis techniques such as flow process chart with the aid of
The identified problem in the machines connected to the filling machine is the occurrence
of delay which is due to filler machines insufficient capacity to handle the output produced by
the blowing machine. The defects occur in the blowing department are wide parting line, pre
heated preform, off centered gate, under blown feet, damage thread neck, strangled neck,
opalescence, pearlesence, bubbles and odor. It also aims to determine the benefits of the
proposed improvement.
67
Findings
Based from the data gathered, processed and analyzed the following findings were
obtained.
following :
1.1 In terms of the process in injection blow moulding, the total cycle time for
1.2 The existing productivity rate is 99.26%. The increase productivity rate is
0.2% and 0.79% for in line with the filler machine and palletizer consecutively.
This leads to the new productivity rate of 99.46 for in line with the filler machine
while the machine that is connected to palletizer can reach its 100% effectiveness
and efficiency. The reduction of defective product varies in every blowing station
for BO1 13,900 pcs, B02 8585 pcs, B03 8177 pcs, BO4 8330 pcs, BO5 16353pcs
2. Upon analysing the existing process the cause of longer cycle time is that the filling
palletizing machine that can affect to the cycle time of the production.
3. From the root cause analysis it is determined that the main reason of the following
defects are:
68
Wide Parting line – caused by operator negligence on checking the temperature
of air pressure.
radiators.
4. Upon the use of Process Analysis tools the proposed improvements are made which are
implement a daily check list for the machines, implement a training, install a digital room
thermometer for conditioning area and combined the dedusting with dimensional
inspection that will help the company to attain or improve their target productivity and
Conclusion
1. The problems identified upon the existing process of injection blow moulding is that the
existing cycle time becomes longer due to machine insufficient lubrication of the ring
69
gear that could cause delay in filler machine and a type of defects can occur which is
called pre heated preform. While in the palletizing the existing cycle time becomes longer
2. The problems identified upon analyzed process in the injection blow moulding are that
the relationship of cycle time and productivity of the process is interconnected to the
3. Based upon root cause analysis the problems encountered in the blowing department is
that the no monitoring of chiller temperature, air pressure and heating radiators due to
quenching, drain valve malfunction and the non-existent of the preliminary inspection.
4. Using CNX analysis, most of the identified problems are controllable once the proposed
improvements are fully implemented the target productivity will be attainable that will
Recommendation
1. For the plant director to implement the proposed improvements in the Blowing
2. For the section manager to conduct surprise visitation in the blowing lines so that each
operator are doing their job and applied the propose check sheet for the operators.
3. For the employees to follow the scheduled maintenance of the auxiliary parts and blowing
machine.
70
4. For the internal customers to ensure that the performance of their machine matches the
output capacity of the blowing machine to reduce the delay in the production.
5. For the future researchers to study the relationship of the reduction of defects to
71
BIBLIOGRAPHY
Books
Albert E. Shaw Time Study Manual of Erie Works of the General Electric company developed
under the guidance
Aquillano N. Chase R and Jacobs R. 2001 Operation Management for Competitive Advantage
10th ed. McGraw-Hill
Daniele Borin, Orfeo Sbaizero and Nicola Scuor, Application of a dielectric barrier discharge
plasma for heating plastic materials, Plasma Research Express, 10.1088/2516-1067/ab1038, 1,
2, (025009), (2019). Managers. Sustainability 2017, 9, 66.
Freivald (2009). Niebel’s Methods, Standards and Work Design 12th Edition, McGraw-Hill
Companies, Inc.
Heizer, L and Render B. (2006) Principle of Operation Management 10th Edition, Pearson
Education. Inc
Strotmann, C.; Göbel, C.; Friedrich, S.; Kreyenschmidt, J.; Ritter, G.; Teitscheid, P. A
Participatory Approach to Minimizing Food Waste in the Food Industry—A Manual for
72
References
Agbay, M., Almario, R., and Tena. April (2009). Process Analysis of Manufacturing 969
Jael, S., Litan, M,. Sioson, L. January(2014). Process Analysis of Heat Exchanger Section for
Automotive Air Conditioning Technology Philippines, Inc. in Calamba, Laguna.
Lee, Dexter Christian. April (2011). Reduction of the Occurrence Of Defective Products in the
Injection Blow Molding Department of Trendy Plastic Manufacturing Incorporated, Carmona,
Cavite
Masula, K., Pabulayan, A., Solano, J. December (2010). Process Analysis of Joshtech
International Socket Maintenance of Maxxim Phil. Operating Corporation in Gateway Business
Park Gen.Trias, Cavite
Mengesha, Y. (2013). Quality Improvement Using Statistical Process Control Tools In Glass
Bottles Manufacturing Company
Roxas, Travis Noel A. April (2010). Scrap Reduction on Polycarbonate Parts of Nasal Masks
Manufactured At The Injection Molding Section of RCM Manufacturing Inc.
Website
Anthony C. Fazey (2015) Which plastic package has the lowest contribution to taste and odor?
https://onlineplatisy.wiley.com/lowestcontributori/abs/10.1002/
machinery.com/EN/Article.aspx
73
APPENDICES
74
Appendix A Blowing Process
75
Appendix B Summarized Productivity for the Year 2019
PREFORM YIELD
Month
January 15,662,648 14,727,075 94.03%
February 15,480,721 15,341,568 99.10%
March 17,205,739 17,099,412 99.38%
April 19,291,390 19,211,591 99.59%
May 20,173,670 20,054,983 99.41%
June 19,912,872 19,139,430 96.12%
July 20,125,297 20,008,822 99.42%
August 16,113,272 16,017,943 99.41%
September 5,151,717 5,121,890 99.42%
October 17,348,126 16,796,118 96.82%
November 4,038,019 4,007,618 99.25%
December 7,419,810 7,390,486 99.60%
TOTAL 177,923,281 174,916,936 98.31%
76
Appendix C Sample Observation for Blowing Machine Inline with Filler Machine
12 Pass by to the preform rail 7.12 198.55 7.02 7.02 7.56 7.02 7.02 7.02 692.11 7.02 7.02 7.02 7.02 7.92 7.02 7.22 7.02 7.02 7.02 7.02 25.33
77
Appendix D Sample Observation for Blowing Machine Inline with Palletizer Machine
Elements 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 AVERAGE
Store the preforms in
the tanker 1.47 1.29 1.20 1.10 1.09 1.41 6.89 1.37 1.03 1.24 1.38 1.25 1.30 1.04 1.39 1.47 1.33 14.30 1.40 1.37 2.06
Elevate the preform to
roller orientor using
vertical converyor 2.170 2.170 2.170 6.890 2.170 2.170 2.170 7.910 2.170 2.170 2.170 2.170 2.170 2.170 2.170 2.170 2.170 2.170 2.170 2.170 2.80
Position the preform
vertically 1.107 1.107 1.107 1.107 1.107 1.107 1.107 1.107 1.107 1.107 1.107 6.45 7.89 9.12 5.34 1.107 1.107 1.107 1.107 1.107 2.09
Pass by to the preform
rail 5.79 8.56 7.35 5.79 8.46 7.89 5.79 5.79 9.82 5.79 5.79 5.79 5.79 5.79 5.79 5.79 5.79 7.56 8.79 8.86 6.11
Transport by neck
gripper 1.33 1.33 1.33 1.33 1.33 1.33 7.65 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 2.43
Feed to clutch loading
station 2.38 8.67 7.46 2.38 3.56 2.38 2.38 2.38 2.38 8.58 2.38 2.38 8.56 8.67 9.01 8.32 2.38 2.38 2.38 2.38 3.25
Transfer to mandrel 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03
Enter to the heating
radiators 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.60
Transfer to mandrel 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03
Blowing mould process 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.69
Transfer to mandrel 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03
Discharge the bottle
form the mould 1.38 1.38 1.38 1.38 6.54 7.88 4.38 1.38 1.38 1.38 8.89 9.88 8.57 1.38 1.38 1.38 1.38 1.38 1.38 1.38 2.71
Rotate the bottle and
transfer to air conveyor
1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.29
Transport the bottle to
the palletizing section 5.18 5.18 5.18 5.18 5.18 5.18 5.18 5.18 5.18 5.18 5.18 5.18 5.18 5.18 5.18 5.18 5.18 5.18 5.18 5.18 5.41
Move the pallets
downward 1.37 1.37 1.37 8.56 1.37 1.37 1.37 1.37 9.88 1.37 1.37 1.37 1.37 1.37 9.1 1.37 1.37 1.37 1.37 1.37 2.35
78
Appendix E CNX Economic Benefit Analysis
Productivity
FORMULA
BO1:
₱ 1,275,523.20
BO2:
= ₱ 435,456.00
BO3:
79
= ₱ 8,669,721.60
BO4:
= ₱ 17,108,755.2
BO5:
= ₱ 17,108,755.2
BO6:
= ₱ 538,876.80
Reduce Defects
80
BO1 850 0.6814 24 13,900
FORMULA
BO1:
BO2:
BO3:
81
BO4:
BO5:
BO6:
82
Appendix F Computation for Repair Cost of the Machine
Manpower
Manpower = 4 x ($18.19x8) x 12
$6984.96 = ₱356,232.96
Material
$ 55,000 = ₱2,805,000
Annual Savings
83
Appendices G Root Cause Analysis
70.00%
60.00%
50.00%
40.00%
30.00%
20.00%
10.00%
0.00%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Equipment Code Auxilliary Parts Problems Encountered Mech. (Freq. ) Elect. (Freq.) Instrumentation (Freq.) Others (Freq.) Total D.T. (Freq.) Percentage (%)
42007-000-000-000 Hot Oil and Water Generating Section Chiller Temperature Failure 981 0 0 1 982 57.36%
42002-000-000-000 Blowing Section Broken Lip Seal 163 0 0 0 163 9.52%
42011-000-000-000 Water Cooling Section Ice Formation 82 0 0 0 82 4.79%
42009-000-000-000 Compressed Air Section High Temperature 78 0 0 0 78 4.56%
42011-000-000-000 Water Cooling Section Cold Water Formation 67 0 0 1 68 3.97%
42007-000-000-000 Hot Oil and Water Generating Section Temperature Chiller Decreases 56 0 0 0 56 3.27%
42034-000-000-000 Storage Process Too Much Heat Profiling in Storage 56 0 0 0 56 3.27%
42001-000-000-000 Blowing Section Incorrect Machine Parameter 54 0 0 0 54 3.15%
42001-000-000-000 Loading Section Misalignment of Clutch 43 0 0 0 43 2.51%
42009-000-000-000 Compressed Air Section Safety Valve Failure 36 0 0 0 36 2.10%
42009-000-000-000 Compressed Air Section Incorrect Temperature Set-up 29 0 0 0 29 1.69%
42009-000-000-000 Compressed Air Section Dryer Fault 23 0 0 0 23 1.34%
42007-000-000-000 Hot Oil and Water Generating Section Excess Oil 22 0 0 0 22 1.29%
42009-000-000-000 Hot Oil and Water Generating Section Oil Temperature Too High 10 0 0 0 10 0.58%
42011-000-000-000 Water Cooling Section Cooling System Malfuntion 10 0 0 0 10 0.58%
GRAND TOTAL 1710 0 0 2 1712 100.00%
84
Root Cause Analysis Pre heated Preform
70.00%
60.00%
50.00%
40.00%
30.00%
20.00%
10.00%
0.00%
1 2 3 4 5 6 7
Equipment Code Auxilliary Parts Problems Encountered Mech. (Freq. )Elect. (Freq.) Instrumentation (Freq.) Others (Freq.) Total D.T. (Freq.) Percentage (%)
Line 5 Filling Machine Insufficient Lubricant Ring Gear 901 0 5 8 914 66.38%
42003-000-000-000 Air Conveying Section Machine Stoppage 146 1 0 0 147 10.68%
42003-000-000-000 Air Conveying Section Air Conveyor Full 98 2 0 0 100 7.26%
Line 5 Filling Machine Filling Process Stops 73 5 0 0 78 5.66%
Line 5 Filling Machine Worn out Ring Gear 56 0 0 0 56 4.07%
42002-000-000-000 Blowing Sections Exposure in heating radiator 43 0 0 0 43 3.12%
Maintenance Maintenance Problems 39 0 0 0 39 2.83%
GRAND TOTAL 1356 8 5 8 1377 100.00%
85
Root Cause Analysis for Off centered Gate
80.00%
70.00%
60.00%
50.00%
40.00%
30.00%
20.00%
10.00%
0.00%
1 2 3 4 5 6 7 8 9 10
Equipment Code Auxilliary Parts Problems Encountered Mech. (Freq. ) Elect. (Freq.) Instrumentation (Freq.) Others (Freq.) Total D.T. (Freq.) Percentage (%)
42002-000-000-000 Blowing Section Continous Machine Usage 896 5 7 0 908 68.07%
42002-000-000-001 Blowing Section Loose bearing of Mandrel 122 0 0 7 129 9.67%
42002-000-000-002 Blowing Section Incorrect installation mold 78 4 0 5 87 6.52%
42009-000-000-000 Compressed Air Section Imbalance Air Pressure 56 0 0 0 56 4.20%
42002-000-000-004 Blowing Section Lack in Preform Heating 44 0 4 0 48 3.60%
42002-000-000-005 Blowing Section Bent Stretch Rod 34 3 0 0 37 2.77%
42002-000-000-006 Blowing Section Incorrect Measurements of Base 32 4 3 0 39 2.92%
42002-000-000-007 Blowing Section Malfunction of Mandrel 11 0 0 0 11 0.82%
42002-000-000-008 Blowing Section Misalignment of Preform 10 0 0 0 10 0.67%
Incorrect parameter of Preform 9 0 0 0 9 0.67%
GRAND TOTAL 1292 16 14 12 1334 99.93%
86
Root Cause Analysis for Underblown Feet
45.00%
40.00%
35.00%
30.00%
25.00%
20.00%
15.00%
10.00%
5.00%
0.00%
1 2 3 4 5 6 7 8
Equipment Code Auxilliary Parts Problems Encountered Mech. (Freq. ) Elect. (Freq.) Instrumentation (Freq.) Others (Freq.) Total D.T.Percentage
(Freq.) (%)
42003-000-000-000 Air Conveying Section Level of air pressure is not monitored 764 1 0 0 765 42.41%
42002-000-000-000 Blowing Sections Incorrect mold installation 473 1 0 0 474 26.27%
------------------------- Raw Materials Excessive base diameter 230 0 0 3 233 12.92%
42003-000-000-000 Air Conveying Section Malfunction of air compressor 93 1 2 0 96 5.32%
42002-000-000-000 Blowing Sections Lack of air temperature 78 0 1 2 81 4.49%
42002-000-000-000 Blowing Sections Insufficient Final Blow 65 0 0 3 68 3.77%
42002-000-000-000 Blowing Sections Loose mold bearing 39 1 2 0 42 2.33%
42002-000-000-000 Blowing Sections Misalignment of Strecth Rod 42 1 2 0 45 2.49%
GRAND TOTAL 1784 5 7 8 1804 100.00%
87
Root Cause Analysis for Damage Thread Neck
45.00%
40.00%
35.00%
30.00%
25.00%
20.00%
15.00%
10.00%
5.00%
0.00%
1 2 3 4 5 6 7 8
Equipment Code Auxilliary Parts Problems Encountered Mech. (Freq. ) Elect. (Freq.) Instrumentation (Freq.) Others (Freq.) Total D.T. (Freq.) Percentage (%)
42002-000-000-000 Blowing Sections Machine Vibration 780 1 0 0 781 38.80%
42002-000-000-000 Blowing Sections Malfunction of starwheel 342 1 1 1 345 17.14%
--------------------------- Raw Materials Excessive thickness of the thread 311 1 1 0 313 15.55%
42002-000-000-000 Blowing Sections Too High Set point temperature 290 0 0 0 290 14.41%
42002-000-000-000 Blowing Sections Misalignment of transfer Arm 109 0 0 0 109 5.41%
42002-000-000-000 Blowing Sections Misalignment of Clutch 79 0 1 0 80 3.97%
42002-000-000-000 Blowing Sections Incorrect Machine Set-up 56 3 0 1 60 2.98%
Too much heat profiling 34 0 1 0 35 1.74%
GRAND TOTAL 2001 6 4 2 2013 100.00%
88
Root Cause Analysis for Strangled Neck
35.00%
30.00%
25.00%
20.00%
Series1
15.00%
10.00%
5.00%
0.00%
1 2 3 4 5 6 7
Equipment Code Auxilliary Parts Problems Encountered Mech. (Freq. ) Elect. (Freq.) Instrumentation (Freq.) Others (Freq.) Total D.T. (Freq.) Percentage (%)
42012-000-000-000 Chiller Section Malfunction of Neck Cooling 824 2 0 0 826 33.23%
42011-000-000-000 Water Cooling Section Cooling System Malfuntion 655 2 0 0 657 26.43%
42007-000-000-000 Hot Oil and Water Generating Section Temperature Chiller Decreases 531 1 1 0 533 21.44%
42001-000-000-000 Transfer arm Misalignment of Clutch 195 1 2 0 198 7.96%
42001-000-000-000 Transfer arm Misalignment of Gripper 186 1 2 0 189 7.60%
42001-000-000-000 Blowing Section Incorrect Machine Parameter 54 0 1 1 56 2.25%
42034-000-000-000 Storage Process Too Much Heat Profiling in Storage 26 0 0 1 27 1.09%
GRAND TOTAL 240 0 0 0 2486 100.00%
89
Root Cause Analysis for Bubbles
40.00%
35.00%
30.00%
25.00%
20.00%
Series1
15.00%
10.00%
5.00%
0.00%
1 2 3 4 5 6 7
Equipment Code Auxilliary Parts Problems Encountered Mech. (Freq. ) Elect. (Freq.) Instrumentation (Freq.) Others (Freq.) Total D.T. (Freq.) Percentage (%)
42009-000-000-000 Compressed Air Section Drain Valve Failure 736 1 0 0 737 35.88%
42019-000-000-000 Air Dryer Section Malfunction of Air Dryer 519 1 0 520 25.32%
42001-000-000-000 Blowing Section Impoper lubrication of mould cavity 249 0 0 1 250 12.17%
42001-000-000-000 Blowing Section Negligence of Monitoring the Air Dryer 216 0 1 0 217 10.56%
42034-000-000-000 Storage Process Too Much Heat Profiling in Storage 184 1 0 1 186 9.06%
42001-000-000-000 Blowing Section Lubricant spill 95 0 1 1 97 4.72%
Raw Material Defective Preform 45 1 1 0 47 2.29%
GRAND TOTAL 2044 4 3 3 2054 100.00%
90
Root Cause Analysis for Pearlescence
60.00%
50.00%
40.00%
30.00%
Series1
20.00%
10.00%
0.00%
1 2 3 4 5 6 7 8
Equipment Code Auxilliary Parts Problems Encountered Mech. (Freq. ) Elect. (Freq.) Instrumentation (Freq.) Others (Freq.) Total D.T. (Freq.) Percentage (%)
42002-000-000-004 Blowing Section Unsupervised Temperature 612 1 1 0 614 48.16%
42002-000-000-004 Blowing Section Lack in Preform Heating 245 0 1 246 19.29%
42007-000-000-000 Hot Oil and Water Generating Section Chiller Temperature Failure 195 1 0 0 196 15.37%
42002-000-000-000 Heating Lamp Lamp failure 75 1 2 78 6.12%
42001-000-000-000 Blowing Section Impoper input of temperature 42 0 1 1 44 3.45%
42002-000-000-001 Blowing Section Loose bearing of Mandrel 40 1 2 43 3.37%
42007-000-000-000 Hot Oil and Water Generating Section Temperature Chiller Decreases 39 1 0 0 40 3.14%
Raw Material Defective Preform 12 1 1 0 14 1.10%
GRAND TOTAL 1260 6 8 1 1275 100.00%
91
Root Cause Analysis for Opalescence
50.00%
45.00%
40.00%
35.00%
30.00%
25.00%
Series1
20.00%
15.00%
10.00%
5.00%
0.00%
1 2 3 4 5 6 7 8
Equipment Code Auxilliary Parts Problems Encountered Mech. (Freq. ) Elect. (Freq.) Instrumentation (Freq.) Others (Freq.) Total D.T. (Freq.) Percentage (%)
42002-000-000-004 Blowing Section Unsupervised Temperature 612 1 1 0 614 45.65%
42002-000-000-004 Blowing Section Excess Preform Heating 315 0 1 316 23.49%
42007-000-000-000 Hot Oil and Water Generating Section Chiller Temperature Failure 195 1 0 0 196 14.57%
42002-000-000-000 Heating Lamp Lamp failure 75 1 2 78 5.80%
42001-000-000-000 Blowing Section Impoper input of temperature 42 0 1 1 44 3.27%
42002-000-000-001 Blowing Section Loose bearing of Mandrel 40 1 2 43 3.20%
42007-000-000-000 Hot Oil and Water Generating Section Temperature Chiller Decreases 39 1 0 0 40 2.97%
Raw Material Defective Preform 12 1 1 0 14 1.04%
GRAND TOTAL 1330 6 8 1 1345 100.00%
92
Root Cause Analysis for Odor
50.00%
45.00%
40.00%
35.00%
30.00%
25.00%
Series1
20.00%
15.00%
10.00%
5.00%
0.00%
1 2 3 4 5 6 7
Equipment Code Auxilliary Parts Problems Encountered Mech. (Freq. ) Elect. (Freq.) Instrumentation (Freq.) Others (Freq.) Total D.T. (Freq.) Percentage (%)
42002-000-000-004 Blowing Department Absence of Preform Sampling 714 0 2 1 717 44.51%
Raw Material Defective Preform 392 1 1 394 24.46%
42034-000-000-000 Storage Process Contamination of Preform 238 0 0 0 238 14.77%
42009-000-000-000 Hot Oil and Water Generating Section Oil Temperature Too High 160 1 0 0 161 9.99%
42034-000-000-000 Storage Process Container Malfunction 39 0 1 1 41 2.55%
42001-000-000-000 Blowing Section Lubricant Leakage 32 0 1 1 34 2.11%
42001-000-000-000 Blowing Section Excessive Lubricant Application 25 0 1 0 26 1.61%
GRAND TOTAL 1600 2 6 3 1611 100.00%