BACKFILLING CHECKLIST

PROJECT/FACILITY NAME:

CONTRACTOR: DATE: TIME:

DOCUMENT NUMBER: AFS/QMS/C/03/00 REVISION NO: 00


REF. DRAWING/SPECIFICATION: GRID/LOCATION:

S.No. Description YES NO NA

A Prior To Backfilling

1 Is the soil used for backfilling approved? (MDD Test)


Has the layer-by layer marking done? (300MM) or as per
2
specification
Has the area cleared from debris/dried concrete/ steel/ boulders &
3
slush before initiate the back filling?
The area to be backfilled dewatered completely before starting the
4
activity of backfilling?
Has all the pre activities (water proofing, plumbing & electrical line
5
etc.) completed?

B During Backfilling

Has the layer height maintained as per the specification/method


1
statement?
Are the stone free materials been used for layer wise backfilling to
2
avoid damage to water proofing?
Is the appropriate equipment employed for each layer of compaction
3
as per specification/BOQ?
Is the Compaction ensured where the compacting equipment cannot
4
be accessed?
5 Compaction test done on every layer of back filling and recorded?
Is the number of core cut taken for compaction test is as per
6
specification?
C After Backfilling
Compaction test conducted (prior placing next layer) and the results
1
observed above 95 % of Maximum Dry Density.
Earth filled compacted in layers not more than 300 mm with optimum
2
water content or as recommended in contract specification.
3 Check level of backfilling is as per required drawing.

Observations:
Whether the above points checked and in order? YES NO
Corrective Action Proposed and Enclosures

Checked by: Contractor Witnessed by: PMC Reviewed by: AFS

Sign:

Issue Date: 01/05/2022 Page 1 of 1