PREFACE
IDAX CONSULTING & RESEARCH PVT. LTD. is pleased to submit the
geotechnical investigation report for BH-01 at ESR-16, DALKI, KUARMUNDA,
SUNDERGARH for VOLTAS LIMITED. The objective of this investigation is to
ascertain the characteristics of Sub-soil to present necessary information for sub-
surface. It was endeavored to study in detail the sub-surface conditions at the project
site.
The general soil profiles and the geological stratification have been determined.
The field and laboratory works have been conducted as per relevant IS Codes.
This is to certify that the samples are collected from the proposed site for the Bore
Hole 01 at ESR-16, DALKI, KUARMUNDA, SUNDERGARH For Project of VOLTAS
LIMITED by IDAX CONSULTING & RESEARCH PVT.LTD., VSS NAGAR,
BHUBANESWAR-751007. The laboratory tests have been performed under the
supervision of qualified personal, as per the Indian standards and this report is
prepared on the basis of these tests results and experts experience.
CONTENTS
Sl. No. PARTICULARS PAGES
01. INTRODUCTION 03
08. LIMITATION 08
09. CLOSURE 09
➢ RECORD OF BORING
➢ FIELD PHOTOGRAPHS
1. INTRODUCTION
Intending to provide a safe, sound and economical foundation system for the Sub - Soil
Exploration work for BH- 01 AT ESR-16, DALKI, KUARMUNDA, SUNDERGARH for
VOLTAS LIMITED and the work for conducting detailed soil investigation work has been
awarded by VOLTAS LIMITED, to IDAX CONSULTING & RESEARCH PVT. LTD., VSS
Nagar, Bhubaneswar-751007.
i. Objectives of Sub-soil Exploration
The objective of this Geo-technical investigation is to optimize the Foundation system for
proposed Project within the safe bearing capacity of the soil and allowable settlement, it
consists of the following.
• Determination of type, size and depth of foundation- system by analyzing the soil
properties
2. SCOPE OF WORK
The scope of work comprises of conducting detail soil investigation, laboratory testing,
conducting and estimation of safe bearing capacity for the above proposed work on drilled
borehole as shown by the Engineer-in charge.
🖙 Location of One number of bore holes with due consultation with the authority.
🖙 Study of site condition and surroundings with regards to the need of the Project.
🖙 Transportation of all soil samples to laboratory for analysis with proper care.
The Laboratory tests for the sample collected are given below
one Bore-holes was selected by the Engineer in charge in order to obtain comprehensive
sub-soil data for this site with a provision of boring up to 10.0m depth as required as per
IS:1892 - 1979. For detailed laboratory investigation SPT is conducted @ 1.50 m intervals or
at change of soil Strata in different Boreholes and S.P.T soil samples were collected for
laboratory analysis. Disturbed representative, soil samples from all the Boreholes were
collected at 1.5 m. interval for different tests.
ii. Boring:
It is the main part of sub soil investigation work as the soil samples were collected for
different tests at different levels. The sub-soil exploration work at the proposed site was
carried out manually / mechanically using 150 mm diameter shell and auger manual
equipment in soft strata and power operated Mechanical boring in hard strata using diamond
cutter , as per IS : 1892 – 1979.
Standard penetration test plays a major role in sub soil investigation termination of safe
bearing capacity of soil in non cohesive type soil, particularly in non-cohesive granular sandy
soil and where the UDS could not be collected either due to high liquidity or non cohesive
nature of soil .The SPT tests were conducted as per IS: 2131-1981 respectively, in different
levels of the bore holes in a continuous manner using spilt-spoon samplers at locations
decided by Engineer-in-charge. The SPT sampler was lower inside the borehole after drilling
the required level and is driven by a 63.50 kg Rammer with a free fall of 750 mm. driving 450
mm in One stages 150 mm each and the number of blows for each 150mm penetration for
2nd & 3rd 150 mm drive recorded as “N”. Refusal was considered for N>100. The details of
location of test and SPT value [N] are presented in bore log data annexed separately.
During exploration work of the Location, 24hours observation it is found that the water table
1.50m in BH-01 within the Boring depth from the existing ground level depending on the
location of boring. The water table may be fluctuating due to change of season.
4. LABORATORY TESTS
The laboratory-tests were conducted on selected representative disturbed / undisturbed soil
samples collected from different Borehole drilled at the proposed site. The tests include
Grain size analysis, Natural moisture content, D.F.S, Specific Gravity and Liquid limit, Plastic
limit, Plasticity index, Shear test, and Particles size distribution tests on representative soil
sample were also carried out. All the tests conducted confirming to the requirements of I.S
specification. The results of all these tests have been annexed separately.
The grain size analysis of different soil samples were done as per the requirement of IS:
2720 (Pt-IV) 1985 – method of test for soil, Grain size analysis. The details of the test results
are shown test result sheet separately. The results of grain size analysis are used to classify
the soil in various depths of boreholes. The results of all these tests have been annexed
separately.
The natural moisture content was determined from different undisturbed samples of different
Boreholes at different depths, as per IS: 2720(Pt-II)-1973: Method of test for soil,
determination of Water content. It is used for determining specific gravity, optimum moisture
content, S.B.C, settlement of foundation system. The results of all these tests have been
annexed separately.
The specific gravity of the UDS / DS samples have been determined at different levels as
per IS: 2720 (Pt-III) - 1980. It is used for determining void ratio, porosity, saturated density,
S.B.C, settlement of foundation system. The results of all these tests have been annexed
separately.
The void-ratio of the UDS / DS samples has been determined at different levels and the
results are shown separately. It is used for determining specific gravity, optimum moisture
content, S.B.C, settlement of foundation system. The results of all these tests have been
annexed separately.
The liquid and plastic limits of soils were other index properties of soil have also been
determined as per the relevant as per IS: 2720(Pt-v)-1985 Code of practice. The liquid and
plastic limits of soil samples have been determined in the laboratory and it is used for
determining S.B.C, settlement of foundation system etc. The results of all these tests have
been annexed separately.
Dalki BH-01
4.50 square ( 4.50 X 4.50) M 86.58
Based on our field and laboratory investigation, the following recommendations are made:
ii. The water table if encountered in the boreholes is also indicated in the soil profile
sheets.
iii. The depth of foundation shall be decided based on bearing capacity and uplift
resistance required.
iv. As per site condition which, visual observations of soil samples at site, field bore log
record, local geology of the area, type of sample received, laboratory classification of
soil samples and based on the experience of our Geo-technical Expert, it is
recommended to provide open foundation.
v. The recommended safe bearing capacity for the footing is computed based on
footing size as specified for suggested foundations are given below. It is feasible to
provide open foundations. Open foundations can be placed at a minimum depth of
1.80m below the existing ground level. However for heavily loaded structures the
foundation depth can be increased as per the design load.
9. LIMITATION
The geotechnical investigation has been carried out at the location chosen by the client.
Recommendations made in the report are hence valid only for these tests locations.
However if there is any change in subsoil conditions and properties at places beyond chosen
test locations, the consultants be contacted for further guidance.
10. CLOSURE
We appreciate the opportunity given to us to submit this draft report. This presented report is
based on observations and tests on samples collected from the boreholes as decided by the
client. In case any difference is noticed in the field subsoil strata and reported subsoil strata
during excavation please contact us before proceeding with further construction.
NB:
• The above test reports are based on the sample received by our laboratory.
• The report shall not be reproduced except in full without the approval of the testing
laboratory.
1 50 >100 SPT
SAMPLE
3 14% NIL
BOULDER
PIECES
4 26% NIL
5 PIECES NIL
6 23% NIL
7 29% 10%
8 35% 25%
ROCK
PIECES
9 43% 28%
10 43% 33%
Project Code: 202006006_GI
Classification of Soil
Sampling Depth (m)
(.075mm Passing)
(20mm - 4.75mm)
(2mm - .425mm)
Natural Moisture
Angle of internal
Plastic Limit (%)
Liquid Limit (%)
Type of sample
%(0.425 mm to
Specific gravity
Cohesion ( C )
SPT Value (N)
Bulk density in
Dry density in
Fine sand in
Type of Test
D.F.S. In %
friction(φ) in
Gravel in %
content(%)
0.75mm)
Degree
Kg/cm2
gm/cc.
gm/cc.
0.00 DS --- 55.21 7.51 6.27 18.06 12.95 0.00 19.00 NP NP GM 10.14 2.65
1.00 SPT 50 57.46 6.74 7.01 16.05 12.74 0.00 20.00 NP NP GM 10.29 2.66
Correction of
mm settlement in
mm settlement in
mm settlement in
Final Corrected Settlement in mm
SPT values
SPT Conducted at Depth in mtr.
(IS:2131-1981)
Corrected SPT value due
to over burden pressure
T/m2.
T/m2.
T/m2.
Width of Footing in M.
Field SPT Value (N)
IS:8009 (Part-I) Cw
per Dilatancy (N")
(Part-I), Fig-12 Cd
25
40
75
S=SixCdxCr/Cw
(Assumed)
ABP for
ABP for
ABP for
(N')
(Si)
N Value >3
1.00 50 2 50.00 32.50 7.40 0.63 0.85 8.05 31.04 49.66 93.12
C ALC U LATIO N O F SAFE B EAR IN G C APAC ITY (SB C )B ased on SPT "N " Value
Project Name: GEOTECHNICAL INVESTIGATION FOR WATER SUPPLY SCHEME FOR RWSS PROJECT.
Location: ESR-16, DALKI, KUARMUNDA, SUNDERGARH Project Code: 202006006-GI
Bore Hole No.: 1 Depth of Sample: 1.00 mtrs Water Table: 1.50 mtrs
References Calculations
Input Data
Field SPT Value N = 50
Depth of Foundation Df = 1.00 mtr.
IS:2131, Fig-1 Corrected SPT value after over burden pressure N' = 80.000
Corrected SPT value after Dilatancy N" = 47.500
IS:6403, Fig-1 Angle of internal friction based on SPT "N" Value Ф = 40.2 Degrees
tan-1 ( 0.67 tanФ ) Ф' = 30 Degrees
Submersible density (Assumed) γs = 1.000 gm/cc
Width / Diameter of Footing (Assumed) B = 2 mtr.
Length of Footing (Assumed) L = 2mtr.
Type of Footing = Square Footing
IS:6403, Fig-1 Condition of Soil = Dense
Overburden Pressure
q = (Df x γs) / 1000 = 0.100 Kg/cm 2 Bγ =( B x γs) / 1000 = 0.200 Kg/cm 2
IS:6403, Table -2 Shape Factors For Square Footing Water Table Effect
Sc = 1.3 Sq = 1.2 Sγ = 0.8 W' = 0.5
C ALC U LATIO N O F SAFE B EAR IN G C APAC ITY (SB C )B ased on SPT "N " Value
Project Name: GEOTECHNICAL INVESTIGATION FOR WATER SUPPLY SCHEME FOR RWSS PROJECT.
Location: ESR-16, DALKI, KUARMUNDA, SUNDERGARH Project Code: 202006006-GI
Bore Hole No.: 1 Depth of Sample: 1.00 mtrs Water Table: 1.50 mtrs
References Calculations
Input Data
Field SPT Value N = 50
Depth of Foundation Df = 1.00 mtr.
IS:2131, Fig-1 Corrected SPT value after over burden pressure N' = 80.000
Corrected SPT value after Dilatancy N" = 47.500
IS:6403, Fig-1 Angle of internal friction based on SPT "N" Value Ф = 40.2 Degrees
tan-1 ( 0.67 tanФ ) Ф' = 30 Degrees
Submersible density (Assumed) γs = 1.000 gm/cc
Width / Diameter of Footing (Assumed) B = 2 mtr.
Length of Footing (Assumed) L = 3 mtr.
Type of Footing = Rectangular Footing
IS:6403, Fig-1 Condition of Soil = Dense
Overburden Pressure
q = (Df x γs) / 1000 = 0.100 Kg/cm 2 Bγ =( B x γs) / 1000 = 0.200 Kg/cm 2
IS:6403, Table -2 Shape Factors For Rectangular Footing Water Table Effect
Sc = 1.1 Sq = 1.1 Sγ = 0.7 W' = 0.5
C ALC U LATIO N O F SAFE B EAR IN G C APAC ITY (SB C )B ased on SPT "N " Value
Project Name: GEOTECHNICAL INVESTIGATION FOR WATER SUPPLY SCHEME FOR RWSS PROJECT.
Location: ESR-16, DALKI, KUARMUNDA, SUNDERGARH Project Code: 202006006-GI
Bore Hole No.: 1 Depth of Sample: 1.00 mtrs Water Table: 1.50 mtrs
References Calculations
Input Data
Field SPT Value N = 50
Depth of Foundation Df = 1.00 mtr.
IS:2131, Fig-1 Corrected SPT value after over burden pressure N' = 80.000
Corrected SPT value after Dilatancy N" = 47.500
IS:6403, Fig-1 Angle of internal friction based on SPT "N" Value Ф = 40.2 Degrees
tan-1 ( 0.67 tanФ ) Ф' = 30 Degrees
Submersible density (Assumed) γs = 1.000 gm/cc
Width / Diameter of Footing (Assumed) B = 2 mtr.
Length of Footing (Assumed) L = 2mtr.
Type of Footing = Continuous Strip Footing
IS:6403, Fig-1 Condition of Soil = Dense
Overburden Pressure
q = (Df x γs) / 1000 = 0.100 Kg/cm 2 Bγ =( B x γs) / 1000 = 0.200 Kg/cm 2
IS:6403, Table -2 Shape Factors For Continuous Strip Footing Water Table Effect
Sc = 1.0 Sq = 1.0 Sγ = 1.0 W' = 0.5
Compute the allowable bearing pressure using Terzaghi equation for the footing and soil parameters shown in
Figure 1.
1.0 Find the bearing capacity. Note that this value is usually the result of geotechnical investigation.
Since:
Ø = 30 deg
Therefore from Table 4-2: From Table 4-1
Nc = 37.2 sc = 1.3
Nq = 22.5 sγ = 0.8
Nγ = 19.7
q = 57 =D
*γ
SF = 3 Factor of Safety
Compute the allowable bearing pressure using Terzaghi equation for the footing and soil parameters shown in
Figure 1.
1.0 Find the bearing capacity. Note that this value is usually the result of geotechnical investigation.
Since:
Ø = 30 deg
Therefore from Table 4-2: From Table 4-1
Nc = 37.2 sc = 1.3
Nq = 22.5 sγ = 0.8
Nγ = 19.7
q = 85.5 =D
*γ
SF = 3 Factor of Safety
Compute the allowable bearing pressure using Terzaghi equation for the footing and soil parameters shown in
Figure 1.
1.0 Find the bearing capacity. Note that this value is usually the result of geotechnical investigation.
Since:
Ø = 30 deg
Therefore from Table 4-2: From Table 4-1
Nc = 37.2 sc = 1.3
Nq = 22.5 sγ = 0.6
Nγ = 19.7
q = 114 =D
*γ
SF = 3 Factor of Safety
(Unsoaked / Soaked)
Water Absorption(%)
Considering Factor of
Test Condition
Crushing Strength
IRC:78-2014
Area (cm2)
RQD (%)
Sl. No.
(Kg/cm2)
(Ton/m2)
Safety
(Mpa)
Load
UCS
(Ton)
Load
(KN)
1 6.0m to 7.0m Soaked 5.4 5.4 29% 10% 2.32 22.9 12.05 1.205 52.62 65.78 5.26
2 7.0m to 8.0m Soaked 5.4 5.4 35% 25% 2.21 22.9 13.41 1.341 58.56 73.20 5.86
MODERATLY WEAK
3 8.0m to 9.0m Soaked 5.4 10.8 43% 28% 2.19 22.9 14.54 1.454 63.49 79.37 6.35
4 9.0m to 10.0m Soaked 5.4 10.8 43% 33% 2.22 22.9 15.21 1.521 66.42 83.02 6.64
Page 18 of 22
IDAX CONSULTING & RESEARCH PVT.LTD.
FIELD PHOTOGRAPHS