Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 5

Engr.

SHAHID SHABBIR
Bungalow #. R-21, sector Z-6, Gulshan-e-Maymar Karachi E-MAIL: shahid2upk@hotmail.com Shahid2upk@yahoo.com 0345-2107986,03333298727 Registered Engr. (PEC):ELECTRO/7627 Passport Number:AF5135682

Objective:
To obtain a challenging career in professional working environment to secure a promising position that offers both a challenge and good opportunity for groth. Able to work as a team leader as well as part of the team.

Qualification:
Degree/ Certificate M.E(Communication System&Network) B.E (ELECTRONIC) (4 Years degree) D.A.E. (ELECTRONICS) MATRIC Year 2011 2003 1996 Board/ University M.U.E.T M.U.E.T S.B.T.E Division 1ST 1st 1st

1992

S.S.C

1st

PROFESSIONAL MEMBERSHIPS:
Profetessional Membership with Pakistan Engineering Council. Registered Engineer : Electro/7627

Skills:
- Expert in Windows 9X/2000/XP. - Command on Internet usage. - Proficiency in MS Office amd Advance Operating Systems.

Experience: (08 YEARS) AS Telecommunication & SCADA ENGINEER.


APRAIL 2008 TO TILL DATE AT 500 KV GRID STATION OF NKI 500/220 KV GRID STATION KARACHI.. Working as Assistant Manager at 500kV Grid Station Jamshoro as well as extra charge of NKI 500/220 KV grid station Karachi as Resident Engineer (Telecommunication) for the Operation and Maintenance of the a)Remote Terminal Units (R.T.U) COLLECTOR-400 b)Teleprotection (NSD-550 ,NSD-50, NSD-61,NSD-60) c)Power Line Carrier (ETL-540,ETL-81,ETI-101,ETI-21,ETI-22,ZAP-51,ZAP01,SPT) d)Microwave stations e)Battery Charger and Battery Bank. f)Exchanges (DCX-600, ECSFX) Duties as Maintenance Engineer Ensure the smooth running and proper maintenance of Telecommunication Equipments: Routine Maintenance, Testing and Re-commissioning of Power Line Carriers such as ETL-540,ETL-81, ETI-101, ZA-51, ZAP-01. Routine Maintenance, Testing and Re-commissioning of Tele Protection System. Routine Testing and Maintenance of Power Rectifiers 220/48Vdc Routine Testing and Maintenance of Radio Link NL126 Routine Testing and Maintenance of Digital Exchanges

Duties as Field Engineer Work to improve the efficiency of a running Telecommunication System and Trouble Shooting, to suggest modification in operating procedures, to hand over the equipment for operation in a safe condition and coordinate between various

Power Grid Stations to Communicate each other for smooth Load Dispatch System. SEPTEMBER-2006 TO APRAIL-2008 AT 500 KV GRID STATION DADU. Worked at NTDC WAPDA 500 KV grid station Dadu as Resident Engineer (Telecommunication) for the Operation and Maintenance of the Complex Telecom System . a)Remote Terminal Units (R.T.U) COLLECTOR-400 b)Teleprotection (NSD-61) c)Power Line Carrier (ETI-101,ETI-21,ETI-22,ZAP-51,ZAP-01,SPT) d)Microwave stations (NL-126) e)Battery Charger and Battery Bank. f)Exchange (DCX-600) JUNE-2003 TO AUGUST 2006 IN PAKISTAN TELECOMMUNICATION COMPANY Ltd(PTCL) Worked as Assistant Divisional Engineer Optical Fiber for the operation and maintenance of optical fiber system (PDH, SDH) and Cable. Did trainings and involve in project of optical fiber cable laying and commissioning of optical system. OPTICAL FIBER CABLE: I did work on the following cables 1-Fujikora (JAPAN) 2-Hesfibel 3-CTI (SIEMENS) 4-LTE 5-BLT OPTICAL SYSTEM: Huawei optical system(Did Project and took training regarding optical system) OPTIX 2500 and 10 G Equipment

FOREIGN VISIT: Visited China for type test of Optical fiber cable (OPGW) from 11th Oct-2010 to 24th Oct-2010. Personal Information Fathers Name Date of Birth NIC Nationality Marital Status Languages: Shabbir Hussain February 22-1975 42401-1793568-7 Pakistani MARRIED Fluent in spoken and written English, Urdu and Punjabi

Engineer Training Certifications:


Training Course Conduct By MANAGEMENT INDUCTION COURSE Huawei Technologies Pakistan (Pvt.) Ltd Zhongxing Telecom Pakistan (Pvt.) Ltd (Z.T.E) Training Course Contents WAPDA STAFF COLLEGE ISLAMABAD SDH Optix 2500+ & 10G Equipment Maintenance 1) 2) 3) 4) G.S.M Technology C.D.M.A Technology Signal & Signaling System Operation And Maintenance Center(O.M.C) 5) Access Network 6) Telecommunication Power Supply Optical Fiber S.D.H D.W.D.M P.D.H Satellite Communication Switching Digital Transmission Computer Network Power Plant

Pakistan Telecommunication Company Ltd.(PTCL)

Computer Training & Testing

Interconnecting Cisco Network Devices

Center(Pvt.) Ltd

You might also like