Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

bala143341@gmail.

com +91 9591882839, +91 8328315926


Name: Balakrushna Boodida
Designation: Associate Manager-OS&E
Date of Birth:05.07.1988
Status: Married
Address: H No-13-1-1, Putchala Street,Rajam-532127

Carrier Objective:
To effectively utilize my skills, experience and qualifications to contribute significantly to an
organization that provides a stimulating and competitive environment, as well as long-term growth.
Education Background
Year Of
Qualification University/College Percentage
Passing
M.Tech GIST College, Vatsavai 70%
2018
(Thermal Engg) Jawaharlal Nehru Technological University. (First Class with Distinction)
B Tech GMRIT College, Rajam 71%
2009
(Mech. Engg) Jawaharlal Nehru Technological University. (First Class with Distinction)
Board Of
SARDA Jr. College, Srikakulam 2005 93.60%
Intermediate
SSC ZPH School, Mandavakurity 2003 84.83%
Work Experience Background (11+ Yrs)
Total
Name of the company Location Designation Duration
Experience
GMR Kamalanga Energy Associate Manager Sep’19 to till
Kamalanga-Odisha -
Ltd(3*350MW) (OS&E) Date
The KCP Ltd. Dy. Manager Dec’14 to 4 years 8
Muktyala, Krishna-AP
CPU-II (Mech. Dept.) Sep’19 Months
SPM instruments India 2 years 3
Hyderabad-Telangana Senior Engineer Apr’11 to July’13
Pvt Ltd Months
Mechanical Aug’09 to 1 Year 7
JK Paper Mill Ltd JKPur, Rayagada, Odisha
Engineer Mar’11 Months
Trainings & Achievements:
Training on Project Management Professional by PMI (Project Management Institute-35 Hrs. PDU).
Certified Lead Internal Auditor for Asset Management System(AMS).
Six sigma Green Belt Training by KPMG India.
Training & certificate of achievement of Machine Lubricant Analyst-I (MLA-I) By International Council
for Machinery Lubrication(ICML).
Training on Internal Auditor for IMS (Integrated Management System) (By RTQMS,
Visakhapatnam) @ Training center, THE KCP LTD.
Training & certificate of achievement of ISO Level II and ASNT Level II Vibration Analyst (By Mobius
Institute, Australia)
National Award for Environmental Best Practices 2021 by CII (Confederation of Indian Industries).
Group level CIP award for Lubricant Optimization through construction of Central Lubricant Store at
GKEL.
Group level 5’s award for Central Lubricant Store through LPD.
Certified 5’s Practitioner through 5”s championship Programme by Corporate BE team.

Page 1 of 4
Planner Responsibilities:
Responsible for all aspects of schedule activities, setup and maintenance of all scheduling tools, processes
and procedures.
 Preparing and analyzing schedule reports and schedule variance
 Effectively monitor cost and resources in the project schedules.
 Material Tracking and updating the same in review meetings.
 Conducting review meeting and circulating the minutes for the same.
 Monitoring the ATR sheet with targets against the actual completion.
 Coordinating with cross functional departments for job progress data collection.
 Creating Work Breakdown Structure (WBS), input project activities, determining activity durations for
plant shutdown activities during Capital Overhauling’s and short shutdowns.
 Tracking the task competition status by individual departments.
 Preparing weekly and monthly project progress for CFT projects.
 Planning, scheduling and estimating project activity times, sequencing those activities from concept to
completion.
 Monitoring actual progress, compare to baseline and report progress against schedule.
 Effectively managing work order and change management
 Creating milestones to identify the start of work including activities that required constraints.
 Maintaining and assigning baseline schedules for the project.
 Monitoring and updating project progress on a routine basis against established scope, schedules and
budgets.
 Identifying critical activities and schedule variances that will put key milestone dates at risk and
proposed remedial action plans.
 Communicating project status report to Project Management Team (PMT).
 Inspection and material received at inward store.
 Monitoring & control of drawings released for good for construction.
CBM Responsibilities:
Condition Monitoring (CM): Using various CM techniques to monitor equipment well-being by analyzing data
and recommending an appropriate preventive and corrective actions.
 Conducting Root Cause Analysis (RCA) of process plant forced outages and near misses for effective
brainstorming, analysis and recommendations,
 Perform data analysis through condition monitoring and recommend appropriate preventive and
corrective actions.
 Gather facts and analyze circumstances in accordance with established RCA methodology. Coordinate
and lead investigation, troubleshooting in resolving plant issues (along with Electrical & Mechanical lead
engineers).
 Jointly undertake studies (with Maintenance team) on various maintenance strategies like BM, PM and
PdM and how each can be used for which asset
 Preventive Maintenance Evaluation: Collate information on condition of equipment to supplement
evaluation and optimization of existing PM.
 Assist Cluster Lead in coordinating activities including communicating technical bulletins to various
stakeholders and tracking of action items till closure.
 Independently plans and coordinates activities within the Maintenance Team.
 Uses metrics such as MTBF & MTTR to drive Asset improvements with Maintenance Engineers
Leads and manage projects related to reliability centered maintenance program for the site.
 Facilitates the competency training program in collaboration with Training Department Participates
in monthly maintenance discussions with sister plants and leverages the best practices Develops and
executes reliability studies and evaluation of equipment robustness.
 Input RCA recommendation into CMMS; Tracking of the implementation status of the recommended
corrective and preventive action using CMMS to ensure compliance.
Page 2 of 4
Roles & Responsibilities
Being a member of OS&E Team looking after Maintenance Planning and Condition Based
maintenances in front line of charge.
 Develop Level 3 project schedules for all short and long term maintenance activities using
Project Management Software with resource allocation.
 Coordinate with contractors and maintenance teams for completion of daily targets,
resource deployment and any other related issues effect the progress.
 Conducting the daily review meeting and tracking the schedule vs actual progress.
 Preparation and compilation of Notification Compliance summary and circulating the
respective departments for timely closing of the same.
 Planning Unit shut down activities through SAP schedule.
 Preparation of PM Compliance Report in each sections there by tracking the SAP task
completion status to present the management.
GMR
 Timely preparation of CAPA reports to the equipment failures under CBM.
Kamalanga
 Scheduling the Condition based Maintenance activities like vibration analysis, oil
Energy Ltd-
analysis, thermography, motor current signature analysis etc.
Odisha
 Timely tracking of ATR points in daily meetings through conducting DPM from OS&E
(Associate team side. Preparation of reports related to Safety permits tracking for timely
Manager- closing of notifications.
OS&E)  Preparation & evaluation of Repetitive/similar mode of failures monthly.
 Preparation of IMS documents related to Maintenance Planning & CBM like HIRA, SAI,
L#3 documents etc.
 Active Participation in 5-S based activities & meeting its theme based requirements
monthly. Active participation in raising the SIP’s and part of CIP’s.
 Co-ordinating the AMC agencies for delivering the tasks in time there by daily CBM
activities will be in smooth way of operation’s.
 Looking after Integrated Management system (ISO 140001, OHSAS 450001 & ISO 500001)
activities and certified as a lead internal auditor.
In charge for Planning & Condition monitoring Cell
 Successfully completed commissioning of 5000 TPD Cement plant at M/s KCP cement Ltd ,
Muktyala, AP.
 Responsible for tracking the tasks being carried out at work place against the plan.
 Working in MM & PM Module of SAP for superior monitoring of Status of PR &
maintenance schedule respectively.
 Identifying critical issues in time and addressing them well ahead without affecting the
schedule.
 Monitoring each for the schedule, quality and financial parameters and take necessary
THE KCP proactive corrective steps.
LTD, CPU-  Daily morning meeting among Operation team, Maintenance team for appropriate review
II- of work with proper planning for the next day working schedule.
Muktyala  Review and monitoring of short Shut down activities.
(Dy.Manager)  Planning and monitoring of Annual Overhauling and Capital Overhauling.
 Monitoring of Spare and AMC cost w.r.t AOP Vs actual and analyse the variance.
 Follow up with maintenance team, store and CPD for updating of commissioning, warranty
and O&M Spare parts to get the critical spares in time.
 Significant Experience in the areas of improving machine reliability and uptime,
Assessment of the machinery health condition for getting trouble free operation and
maintenance strategy.
 Imparting training on practical approach to condition monitoring & corrective
maintenance, technology up gradation, and mechanical Services.
 Implementation of Preventive maintenance & predictive maintenance activities under
the technical cell team.
 Imparting training to maintenance team regarding reliability maintenance & check list
Page 3 of 4
feedback entries.
 Responsible for preparation commissioning reports & maintenance protocols.
 Carry out root cause failure analysis for break downs & increasing the machine
availability.
 Submission of consolidated check points report to the immediate manager.
 Entering the site visit observation into the SAP to generate the plant maintenance orders.
 Preparation of shut down jobs list & planning for major replacement activities.
 Collection of oil samples and sending to lab for Wear particle analysis and report
distribution to respective departments.
 Responsible on site mechanical maintenance activities at M/s West Coast paper mill,
Dandeli site under AMC contract by SPM.
 Responsible for submitting the monthly & weekly action plan of preventive & predictive
maintenance tasks.
 Execution of shut down jobs as per the check list feedback the front line engineers.
 Inspection of all paper machine parameters like bearing temperatures, pumps check lists;
SPM gear box oil seals leakages etc.
instruments  Responsible for maintenance of paper machines and implementing the action plan for
India Pvt Ltd production requirements.
Senior Submission of vibration report to the customers & taking corrective actions as per the
Engineer, recommendations.
Mechano  Responsible for site safety compliances & ensuring safety management term & conditions
Maintenanc to create safe working platform.
e Service  Expertise in vibration diagnosing of Rotary Machines- Electrical/Mechanical equipment’s
Dept. having experience in Paper machine analysis.
 Carrying out In-situ dynamic balancing, Laser Alignment, Ultrasonic flaw detection &
thickness measurement and Ferrography Oil analysis.
 Responsible for day to day shift duty activities for paper machine mechanical
department.
 Handling the shift manpower & engaging the team as per task.
 The day-to-day maintenance tasks during all shifts.
 Ensuring preventive maintenance of equipment as per laid down guidelines and
JK Paper Mill schedules of maintenance based on manual instructions.
Ltd  Inspection & troubleshooting of mechanical equipment’s like pumps gear boxes, rolls,
Mechanical vacuum pumps.
Engineer,  Preventive, predictive maintenance of PAPER MACHINES & E.C.H WILLS CUTTER.
Paper  Overhauling of different pumps, rolls, refiners, blowers, vacuum pumps, gear boxes etc.
Machine  Daily through checking of machine properly & to detect abnormality.
 Maintenance of all hydraulic systems.
 Periodic maintenance of stores, lubrication chart & shift schedule checks list of PAPER
MACHINES & WILLS CUTTER.
 Material management & looking after the TPM activities.
 Looking after the maintenance of paper machines including PF plant.
 Periodical training to fitters regarding their working culture.

Declaration:

I assure that all the above information declared by me is true to the best of my knowledge. I am much
interested to take up my career in your reputed organization.

Date: Place: Rajam, AP, India (Balakrushna. Boodida)

Page 4 of 4

You might also like