1. INSTALL 1 X 750kVA GROUND MOUNT TRANSFORMER WITH CFC SWITCHGEAR AND DISTRIBUTION BOARD WITHIN THE KIOSK BUILDING (KIOSK TO BE CONSTRUCTED BY
THE DEVELOPER, REFER TO 'DETAIL A' AND 'DETAIL B' FOR TRENCH LAYOUT).
2. CUT EXISTING HV CABLE TO MAKE JOINT AT LOCATION MARKED J1.
3. LAY AND TERMINATE 300MM² 3C AL HV XLPE U/G CABLE BETWEEN JOINT J1 TO PROPOSED CFC SWITCHGEAR, PROPOSED CFC SWITCHGEAR TO CFC SWITCHGEAR
INSTALLED WITHIN KIOSK SUBSTATION T3017 AND PROPOSED 750KVA TRANSFORMER AND CFC SWITCHGEAR.
4. LAY AND TERMINATE 240MM² 4 X 1C PER PHASE ALU XLPE LV UNDERGROUND CABLE FROM PROPOSED 750KVA TRANSFORMER TO DISTRIBUTION BOARD.
5. INSTALL HV AND LV EARTHING WITHIN THE PROPOSED EARTHING TRENCH.
Name: TIVAM
Client: Project Title: ELECTRICITY SUPPLY TO CHARAN KATONIVERE Scheme No: G19-22
MR. CHARAN JEET SINGH HOLDINGS PTE LTD'S COMMERCIAL DEVELOPMENT
0 Original Issue TTK
No Revision Date By energising our nation AT LOT 3, YASAWA STREET IN LAUTOKA Scale:
Name: TIVAM
Client: Project Title: ELECTRICITY SUPPLY TO CHARAN KATONIVERE Scheme No: G19-22
MR. CHARAN JEET SINGH HOLDINGS PTE LTDS COMMERCIAL DEVELOPMENT
0 Original Issue TTK
No Revision Date By energising our nation AT LOT 3, YASAWA STREET IN LAUTOKA Scale:
Energy Fiji Limited
Customer Name: Charan Jeet Singh Scheme Name: Electricity Supply to Charan Jeet Singh Group at L
Remarks:
___________
End of Quote
1 2 3 4 5 6 7 8
42700
A
10 10 10
Managers 1
Cosmetic X
Office Lift Stairs
10 1 A10
Railings
16
Canopy Roof
5655
17
10
EFL
Planter
2
transformer Trolley
Location
RL=0.380
B
1900
1 d Y
a Supermarket A11
Cargo Lift 751 sqm 1
Entry
Ramp UP.
5545
Railings
3000 2060
Counter (6)
Ratio 1:8 1 RL=0.000
C
1 c
refer enlarge 8 8
detail (A21)
22400
d
Storage 1 Butcher
5465
Exit
7 1
RL=0.380
2 1
1
9 7
D 4
Canopy Roof
6 5 5 5 6
RL=0.380
15
e 12
5735
d
PROPOSED GROUND FLOOR PLAN
SCALE 1: 150
NOTE: KEY FOR WALL REFERENCE KEY FOR FLOOR FINISHES REFERENCE LEGEND
1. confirm all dimensions on site existing conc. blockwall to remain, Selected 600 x 600 Ceramic a new lift to be installed as per manufactures 1 Check-out counter (double)- 2400 x 7 Butcher Display Freezer- 1875 x 13 Mixed Veges (3 door) - 3750 x 940 x
prior to construction allow to protect from damages specification 2000mm (6 units) 1181x 1151mm (2 - units) 2030mm (1 unit)
floor tiles to be supplied by
during construction 1 2 Counter with bulkhead above- 600mm 8 Butcher Display Freezer- 1250 x 14 Mixed Veges (2 door) - 2500 x 940 x
2. Whole of interior (fitout area) to client, Contractor to b new cooler room to be installed as per
be painted as per Designers new gib board wall painted as install including adhesive 3 Liqour Freezer - 2600 x 745 x 1181 x 1151mm (2 - units) 2030mm (1 unit)
manufactures specification
instruction per Building Designers instruction, refer (Ardex - X56) & grout. 1900mm (1 unit) 9 Butcher meat slicer 15 Juice Freezer - 2500 x 745 x 1900mm
wall sections for details c selected ceramic wall tiles to be supplied by (1 unit)
3. All floor tiles/ carpet to be laid 4 Ice Cream Freezer - 2580 x 1042 x 10 Potatoe, Garlic, Onion Shelves- 1300
client, contractor to install including adhesive.
as per Designers instruction new 200mm conc. wall painted as per 1024mm (1 unit) x 1000mm (4) 16 Dairy choclate Freezer - 1975 x 754 x
Existing concrete floor with (ardex - x56) & grout.
building consultants instruction, refer 5 Crest Freezer - 3750 x 1830 x 1900mm (1 unit)
4. Existing walls, allow to make 2 Steel trowel & soft broom d 40mm dia ss pipe, refer detail 11 Fruits, Veges, Dairy & Frozen - 3750 x
wall sections for details 1016mm (3 units) 17 Flour, small shelf - 1300 x 1000mm (2)
good & paint as per Designers finish 940 x 2030mm (3 units)
new 150mm conc. wall painted as per e replaster any damage columns & paint apply 6 Small wings Freezer - 1830 x 1100 x
instruction 12 Roast chicken Oven - 1300 x 1200mm 18 Liqour cool room- 2300 x 2400mm (1)
building consultants instruction, refer wall putty and sand before painting. remove 1000mm (2 units)
wall sections for details any electrical fixtures and wires, refer enlarge
NOTES: THE CONTRACTOR MUST VERIFY ALL DIMENSIONS ON THE PROJECT: DRAWING TITLE: SCALE: DATE : SHEET NO:
Architectural Studio
A3
DRAWING BEFORE THE EXECUTION OF WORK OR SHOP DRAWINGS. THE
CONTRACTOR SHALL NOTIFY THE PROJECT CONSULTANT OF ANY Building Designer | Building Consultant
CHARAN KATONIVERE HOLDINGS LIMITED PROPOSED GROUND As Shown 30. 05. 2022
DISCREPANCIES. FIGURED DIMENSIONS SHALL TAKE PREFERENCE OVER 9027 451 | 3411 329 PROPOSED COMMERCIAL BUILDING FLOOR LAYOUT REVISION #: DESIGNED BY:
SCALED DIMENSIONS .THIS DRAWING IS COPYRIGHT AND THE PROPERTY
M. Ahmed
P.O.Box 8444, Nakasi LOT 3, YASAWA STREET,
OF THE AUTHOR AND MUST NOT BE RETAINED, COPIED OR USED arcstudio@outlook.com.au R3 DRAWN BY: PROJECT:
WITHOUT THE AUTHORITY OF ARCHITECTURAL STUDIO. LAUTOKA M. Ahmed 2021 - arcstd26
1 2
6185
wc
UP.
2240
Stairs
whb
Contractor to relocate
600 x 600mm
duct shown dotted to
Duct over
5655
Grid line D
3510
4800 1380
Lockers
2920
Exact
4700
Transformer
Location
1000
B
700
600 x 600mm
Duct over
3990
3100
Cargo Lift
Contractor to relocate
duct shown dotted to
Grid line D
ENLARGE GROUND FLOOR PLAN
SCALE 1: 50
NOTES: THE CONTRACTOR MUST VERIFY ALL DIMENSIONS ON THE PROJECT: DRAWING TITLE: SCALE: DATE : SHEET NO:
Architectural Studio
A3a
DRAWING BEFORE THE EXECUTION OF WORK OR SHOP DRAWINGS. THE
CONTRACTOR SHALL NOTIFY THE PROJECT CONSULTANT OF ANY Building Designer | Building Consultant
CHARAN KATONIVERE HOLDINGS LIMITED PROPOSED GROUND As Shown 30. 05. 2022
DISCREPANCIES. FIGURED DIMENSIONS SHALL TAKE PREFERENCE OVER 9027 451 | 3411 329 PROPOSED COMMERCIAL BUILDING FLOOR LAYOUT REVISION #: DESIGNED BY:
SCALED DIMENSIONS .THIS DRAWING IS COPYRIGHT AND THE PROPERTY
M. Ahmed
P.O.Box 8444, Nakasi LOT 3, YASAWA STREET,
OF THE AUTHOR AND MUST NOT BE RETAINED, COPIED OR USED arcstudio@outlook.com.au R3 DRAWN BY: PROJECT:
WITHOUT THE AUTHORITY OF ARCHITECTURAL STUDIO. LAUTOKA M. Ahmed 2021 - arcstd26
TYPICAL TRENCH DETAILS ACROSS ROADWAYS, DRIVEWAYS & FOOTPATHS
33kV + 11kV + FIBRE TRENCH 33kV + 11kV + LV/MV + FIBRE TRENCH 33kV + 11kV + LV/MV TRENCH 33kV + 11kV TRENCH
70 70
11kV(OR 6.6kV) CABLE 150 11kV(OR 6.6kV) CABLE 150
(150mm CONDUIT) (150mm CONDUIT)
11kV(OR 6.6kV) CABLE 150 11kV(OR 6.6kV) CABLE 150
(150mm CONDUIT) (150mm CONDUIT)
70 70
500 500
33kV + FIBRE TRENCH 33kV + LV/MV TRENCH 33kV + LV/MV + FIBRE TRENCH 11kV+FIBRE TRENCH
70 70
MECHANICAL PROTECTION/ MECHANICAL PROTECTION/
HARD-COVER (INSTALL BY 2) LV/MV CABLE LV/MV CABLE HARD-COVER
150 150
100 (150mm CONDUIT) (150mm CONDUIT) 100
MECHANICAL PROTECTION/
LV/MV CABLE LV/MV CABLE LV/MV CABLE HARD-COVER (INSTALL BY 2)
150 150 150
(150mm CONDUIT) (150mm CONDUIT) (150mm CONDUIT) 100
150 150
MARKER/ HEP MARKER/ HEP
TAPE TAPE
BACKFILL MATERIALS TO BE IN
ACCORDANCE TO EFL REQUIREMENTS
BACKFILL MATERIALS TO BE IN 360
510 (REFER TO NOTE # 5)
ACCORDANCE TO EFL REQUIREMENTS
(REFER TO NOTE # 5) 830
MECHANICAL PROTECTION/
HARD-COVER LV/MV CABLE 150
100 (150mm CONDUIT)
SAND 70
11kV(OR 6.6kV) CABLE 150
(150mm CONDUIT)
SAND 500
70
500
33kV + 11kV + FIBRE TRENCH 33kV + 11kV + LV/MV + FIBRE TRENCH 33kV + 11kV + LV/MV TRENCH 33kV + 11kV TRENCH
BACKFILL MATERIALS TO BE IN
BACKFILL MATERIALS TO BE IN 240
ACCORDANCE TO EFL REQUIREMENTS
ACCORDANCE TO EFL REQUIREMENTS 330 (REFER TO NOTE # 5)
(REFER TO NOTE # 5) 420
BACKFILL MATERIALS TO BE IN
MECHANICAL PROTECTION/ BACKFILL MATERIALS TO BE IN
ACCORDANCE TO EFL REQUIREMENTS 510
HARD-COVER ACCORDANCE TO EFL REQUIREMENTS
(REFER TO NOTE # 5)
100 (REFER TO NOTE # 5)
MECHANICAL PROTECTION/
HARD-COVER
100 U/G OPTICAL FIBRE CABLE D
1020 1060 MECHANICAL PROTECTION/ 1060 1020
70
D MECHANICAL PROTECTION/ HARD-COVER (INSTALL BY 2)
U/G OPTICAL FIBRE CABLE 100
HARD-COVER (INSTALL BY 2) MECHANICAL PROTECTION/
70 100
MECHANICAL PROTECTION/ HARD-COVER (INSTALL BY 2)
HARD-COVER (INSTALL BY 2) LV/MV CABLE D 100
100 LV/MV CABLE D
70 11kV(OR 6.6kV) CABLE
D
70
11kV(OR 6.6kV) CABLE D
11kV(OR 6.6kV) CABLE D
70
D
70 11kV(OR 6.6kV) CABLE
70 33kV CABLE D
D 70
33kV CABLE 50
33kV CABLE D SAND
SAND 50 33kV CABLE D
SAND 50
SAND 50
500
500
500
500
33kV + FIBRE TRENCH 33kV + LV/MV TRENCH 33kV + LV/MV + FIBRE TRENCH 11kV+FIBRE TRENCH
500
500 500
500
SHEET 2 OF 3
TYPICAL TRENCH DETAILS FOR DIRECT BURIED CABLES
11kV TRENCH 11kV + LV/MV + FIBRE TRENCH 11kV + LV/MV TRENCH 33kV TRENCH
BACKFILL MATERIALS TO BE IN
ACCORDANCE TO EFL REQUIREMENTS 240
(REFER TO NOTE # 5) BACKFILL MATERIALS TO BE IN
ACCORDANCE TO EFL REQUIREMENTS 420
BACKFILL MATERIALS TO BE IN (REFER TO NOTE # 5)
510 MECHANICAL PROTECTION/
ACCORDANCE TO EFL REQUIREMENTS BACKFILL MATERIALS TO BE IN
(REFER TO NOTE # 5) HARD-COVER ACCORDANCE TO EFL REQUIREMENTS 540
950 100
900
U/G OPTICAL FIBRE CABLE D 950
950
MECHANICAL PROTECTION/
MECHANICAL PROTECTION/ 70 HARD-COVER
MECHANICAL PROTECTION/ HARD-COVER 100
HARD-COVER 100
MECHANICAL PROTECTION/
100 LV/MV CABLE D HARD-COVER (INSTALL BY 2)
LV/MV CABLE D 100
11kV(OR 6.6kV) CABLE D 70
70 33kV CABLE D
SAND 70 11kV(OR 6.6kV) CABLE D
11kV(OR 6.6kV) CABLE SAND 50
D
SAND 70
SAND 70
500 500
500
500