Bolt Required per Structure
Sr.No Bolt Dia Total Bolt
str. Quantity
A
1 15 0
B
2 CVT 8 No's 9 72
3 M-CVT 8 No's 3 24
4 LA 8 No's 9 72
5 TANDOM ISOLATOR 48 No's 3 144
6 3-PH ISOLATOR ONE SWITCH 48 No's 8 384
7 CT 16 ɸ 8 No's 12 96
8 M-CT 16 ɸ 8 No's 3 24
9 WT 16 ɸ 24 No's 2 48
10 BPI 16 ɸ 8 No's 29 232
11 PARKING SHED 16 ɸ 40 No's 1 40
1 40 ɸ 1425 0 18.87 0 Kg
2 25 ɸ 750 0 5.38 0 Kg
3 16 ɸ 650 440 2.81 1236 Kg
Total 440 Total 1236 Kg
1.24 Mt.
Note -
1 Input data for Foundation Bolts of LCLM is not available.
Project - Establishing 400KV Substation for 600MW Wind Farm
Project at Kudligi, Karnataka
Client - JSW
Document - MFC_Foundation Bolt
Reference : Electrical Layout Drg Date 9-Aug-21
Foundation Bolt Drg Rev. R0