RAJASTHAN.
Client -
Document - Date 22-Aug-22
Bolt Required per Structure
Sr.No Total Bolt
str. Quantity
A
1 40 ɸ 16 No's 15 240
B
2 CVT 16 ɸ 9 0
3 M-CVT 16 ɸ 3 0
4 LA 16 ɸ 9 0
5 TANDOM ISOLATOR 16 ɸ 48 No's 3 144
6 3-PH ISOLATOR ONE SWITCH 16 ɸ 48 No's 8 384
7 CT 16 ɸ 8 No's 12 96
8 M-CT 16 ɸ 8 No's 3 24
9 WT 16 ɸ 24 No's 2 48
10 BPI 8 No's 29 232
11 PARKING SHED 40 No's 1 40
1 40 ɸ 1425 0 Kg
2 25 ɸ 750 0 Kg
3 16 ɸ 650 696 2.81 1955 Kg
Total 696 Total 1955 Kg
1.96 Mt.
Note -
1 Input data for Foundation Bolts of LCLM is not available.
Project - Establishing 400KV Substation for 600MW Wind Farm
Project at Kudligi, Karnataka
Client - JSW
Document - MFC_Foundation Bolt
Reference : Electrical Layout Drg Date 9-Aug-21
Foundation Bolt Drg Rev. R0