Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 3

Project - 220kV SWITCHYARD FOR 180MW SOLAR POWER PROJECT, AT DEVIKOT, FATEHGARH

RAJASTHAN.

Client - ADANI GREEN ENGERY LTD


Document - PR_Foundation Bolt Rev. R0 Date 22-Aug-22
Bolt Required per Structure
Sr.No Description Bolt Dia Total Bolt
str. Quantity
A 220 kV Gantry Tower
1 Tower 40 ɸ 16 No's 15 240

B 220kV Equipment Structure


2 CVT 25 ɸ 4 No's 9 36
3 M-CVT 25 ɸ 4 No's 3 12
4 LA 25 ɸ 4 No's 9 36
5 TANDOM ISOLATOR 25 ɸ 24 No's 3 72
6 3-PH ISOLATOR ONE SWITCH 25 ɸ 24 No's 8 192
7 CT 25 ɸ 4 No's 12 48
8 M-CT 25 ɸ 4 No's 3 12
9 WT 25 ɸ 12 No's 2 24
10 BPI 25 ɸ 4 No's 29 116
11 PARKING SHED 25 ɸ 40 No's 1 40

7 LCLM Data Not Available

Foundation Bolt Summary


Foundation Bolt Size Length of Bolt Total Bolts
Sr. No. Approximate Wt. Total Wt.
'mm' 'mm' No's
1 40 ɸ 1425 240 18.87 4530 Kg
2 25 ɸ 750 588 5.38 3165 Kg
3 20 ɸ 750 0 3.62 0 Kg
Total 828 Total 7694 Kg
7.69 Mt.
Note -
1 Input data for Foundation Bolts of LCLM is not available.
Project -

Client -
Document - Date 22-Aug-22
Bolt Required per Structure
Sr.No Total Bolt
str. Quantity
A
1 40 ɸ 16 No's 15 240

B
2 CVT 16 ɸ 9 0
3 M-CVT 16 ɸ 3 0
4 LA 16 ɸ 9 0
5 TANDOM ISOLATOR 16 ɸ 48 No's 3 144
6 3-PH ISOLATOR ONE SWITCH 16 ɸ 48 No's 8 384
7 CT 16 ɸ 8 No's 12 96
8 M-CT 16 ɸ 8 No's 3 24
9 WT 16 ɸ 24 No's 2 48
10 BPI 8 No's 29 232
11 PARKING SHED 40 No's 1 40

7 LCLM Data Not Available

Foundation Bolt Summary


Sr. No. Total Wt.

1 40 ɸ 1425 0 Kg
2 25 ɸ 750 0 Kg
3 16 ɸ 650 696 2.81 1955 Kg
Total 696 Total 1955 Kg
1.96 Mt.
Note -
1 Input data for Foundation Bolts of LCLM is not available.
Project - Establishing 400KV Substation for 600MW Wind Farm
Project at Kudligi, Karnataka
Client - JSW
Document - MFC_Foundation Bolt
Reference : Electrical Layout Drg Date 9-Aug-21
Foundation Bolt Drg Rev. R0

Sr.No Description Structure Unit Wt. of Str. as Remark


Quantity Per Design "Mt."
A 400 kV Gantry Tower
1 T1 4 3.6
2 T2 2 7.3
3 T3 3 7.2
4 T4 2 7.3
as per design
5 T5 2 7.0
6 B1 4 3.9
7 B2 4 3.8
8 B3 2 5.0
Total Wt. of Gantry Str. (A) 119.898
Total Str 23 107.9082
Supply Cost As Per BOQ 9700000
Av. Cost Per Str. 421739
Current Material Rate 81000 Rs/Mt.
Max. Av. Wt. of Str. Can be 5.21 Mt.
Total Wt. of gantry Str. Lot (B) 119.8 Mt. (A) wt. Should be less than (B) wt