ONSITE SERVICES REPORT

London

XXXX

Invasive fitting survey

Report Date:XX/XX/19
VENDOR:

SWAGELOK London

CLIENT:

XXX

PURCHASE ORDER NO.: DOCUMENT NO.: PROJECT NO.:


FAB1419-[[[[
FAB[[[[

Onsite Inspection Services at


PROJECT TITLE: –;;;;;;
Reference ;;;

DOCUMENT TITLE: Invasive fitting inspection

INITIAL DATE
WRITTEN BY MDW 23/10/19
CLIENT RECEIVED ;;; ;;/;;/19

3
CONTENTS

Executive Summary 5

Introduction 6

Field Engineer Biography 7

Issues By Tag ID 8

Inspection Statistics - Detail 66

Inspection Summary 68

4
UTIVE SUMMARY

This report is a summary of the 1-day invasive fitting survey at XXX


of the XXX Unit-XXX. We conducted an onsite inspection on
the XXrd of XXX 2019.

The scope of work for the inspection was to provide a report on the installation of the
fittings surveyed to ensure the correct installation procedure had been followed.
20% of the overall fittings were inspected.

During the onsite inspection we identified no issues with the installation of the fittings
surveyed.

INSPECTION POINTS Quantity Quantity Surveyed % RATE


Tube fittings 280 57 20

IMPORTANT NOTICE. Swagelok provides this report for general information only, and it is based in part on a 
variety of facts and assumptions (some of which are variable and subject to change), as well as information 
supplied by the recipient and third parties. While Swagelok believes the information and conclusions in this report 
are accurate, Swagelok does not provide any warranty or guarantee regarding the accuracy or completeness of 
the information and conclusions in the report. Swagelok does not have the same level of knowledge and 
information as the recipient about the recipient’s applications, products, designs, and conditions of use, and the 
recipient bears responsibility for determining the suitability of Swagelok’s products and recommendations for the 
recipient’s own situation and application. This report is CONFIDENTIAL information of Swagelok and may not be 
copied, shared or given to any other third parties except as otherwise stated in the report or by Swagelok in 
writing. 5
INTRODUCTION

The process of performing a system engineering service begins with a dedicated Swagelok Field
Engineer working with your Instrument team. The capabilities of this IOXLGV\VWHP
expert encompass the following:-

• System problem solving


• Information on industry best practices
• Knowledge of Swagelok small bore tubing training
• Swagelok custom solution assemblies

The skill set demonstrated is applicable to both analysis of system components and the
assessment of a complete system.

Swagelok Personnel

Mark Welch
Swagelok London Field Engineer
+44 (0) 7717 875003
mark.welch@Swagelok.com

Thank you for allowing Swagelok onsite inspection services to be of assistance to you.

Please do not hesitate to contact us if you require additional information or clarification on any item
contained in this report.

6
ISSUES BY TAG ID

8
London Fluid System Technologies Ltd
Swagelok London

Tag ID : 04101 Category : 1


Plant Area: Fittings Part Material: 316 Stainless Steel

Customer Tag ID: MV 02/2 Connection Type: Tube Fitting

Location: Connection Size 1/4 in

GPS Location:

Part Description: Stainless Steel Swagelok Tube Fitting, Male Connector, 1/4 in. Tube OD x 1/2 in. Male NPT

Process Fluid: N/A Type of Part: Fittings

Pressure: 0 bar Manufacturer: Swagelok

Temperature: 0C Part Number: SS-400-1-8

Issue: None. Equiv Swagelok Part:

Description:

Other Findings:

Possible Solution: None. Correct installation.

Ultrasound dB: n/a

Ultrasound ID: n/a

IMPORTANT: Always depressurize the system before working on, disassembling or assembling a fluid system. Safe
Product Selection: When selecting a product, the total system design must be considered to ensure safe, trouble-free
performance. Function, material compatibility, adequate ratings, proper installation, operation, and maintenance are
the responsibilities of the system designer and user.
NOTE: Where the Part Number is followed by " * ", it should be confirmed before placing an order.

https://london.swagelok.com
INSPECTION STATISTICS
London Fluid System Technologies Ltd
Swagelok London

Issue Category Summary Issue Type Summary


Category Total Issue Type Total
Category: 1 57 No Issue 57
Total 57 Total 57

Surveyed Connection Stats Summary


Connection Type Surveyed Issues %
Tube Fitting 57 0 n/a
Total 57 0

Issues by Part Type


Part Type Issue Type Qty

Fittings None. 57
Total 57

IMPORTANT: Always depressurize the system before working on, disassembling or assembling a fluid system. Safe
Product Selection: When selecting a product, the total system design must be considered to ensure safe, trouble-free
performance. Function, material compatibility, adequate ratings, proper installation, operation, and maintenance are
the responsibilities of the system designer and user.

Report Generated : 14-Nov-2019 15:31


Appendix F : Page1
INSPECTION SUMMARY

After conducting an inspection on 57 random fittings on the XXX


skid I found no defects or issues with the assembly of the swaged connections.

All connections surveyed were made correctly at the time of review and met the typical
installation instructions.

All fittings were re-made prior to the pressure test by the customer.
London

SWAGELOK London
AUTHORISED SALES & SERVICE CENTRE
T. +44 (0)1923 272 000
E. info@London.Swagelok.com
W. WWW.SWAGELOK.COM/London

OFFICE:
Kingley Park
Station Road
Kings Langley
Hertfordshire
England WD4 8GW

Swagelok n is a trading name of London Fluid System Technologies Ltd.

You might also like