RENCANA KERJA HARIAN (RKH)

SHIFT REPORT

PT. Bakti Pertiwi Nusantara Site Sepo PT. Djava Berkah Mineral
SHIFT 2 (Night Shift) 09/10/2022
SHIFT 1 PRODUCTION REPORT HEAVY EQUIPMENT & MANPOWER
ACTIVITY PLAN EXISTING UNIT ACH. (%) Model EQ Class Populasi RFU BD MP Deviasi
OB Removal (Bcm) 2,882 1,267 44 Exca 300 Loader 5 3 2 2 -3
Ore Getting (Ton) 2,880 2,174 75 Exca 200 Loader 7 5 2 5 -2
Hauling ETO- EFO (Ton) 2,765 1,113 40 DT 20 Ton Hauler 26 26 0 18 -8
Barging (Ton) 7,875 7,875 100 Dozer 85 SS Unit Support 2 2 0 1 -1
Breaker Unit Support 1 1 0 1 0
REVIEW SHIFT 1 PRODUCTION REPORT Grader Unit Support 2 1 1 1 0
ACTIVITY PLAN ACTUAL ACH. (%) Vibro Case Unit Support 2 2 0 1 -1
OB Removal (Bcm) 2,882 0 0 Fuel Truck Unit Support 2 2 0 1 -1
Ore Getting (Ton) 2,880 456 16 Water Truck Unit Support 1 1 0 1 0
Hauling ETO- EFO (Ton) 2,765 219 8
Barging (Ton) 5,250 0 0
Remarks : Update 9 Oktober (Shift 1)

REVIEW MONTHLY 1 PRODUCTION REPORT RAIN & SLIPPERY


ACTIVITY PLAN MTD ACTUAL MTD ACH. (%) ACTIVITY SHIFT 1 SHIFT 2 REMARK
OB Removal (Bcm) 50,548 8126 16 RAIN
Ore Getting (Ton) 60,279 6713 11 SLIPPERY
Hauling ETO- EFO (Ton) 28,537 2909 10 LOST TIME 10.27 - 18.00 Empty Fuel
Barging (Ton) 31,500 0 0 REFUELING
Remarks : Update 9 Oktober (Shift 1) Remarks : Update 9 Oktober (Shift 1)

SHIFT 2 (Night Shift) 09/10/2022


ACTIVITY PIT_ID FLEET PLAN LOADER HAULER SUPPORT Note :
OB Removal Pit_Timur 1 1 DX300 3 DT BREAKER *Priority Expose Ore in PIT
Ore Getting Pit_Timur 1 1 DX300 7 DT 2 PC200 *OB removal, (Fuso)
Hauling ETO-EFO ETO 1 1 DX300 8 DT *Production, DT (42,43,44,45,11,12,15)
Barging *Selective Ore, Optional Production
Supporting GRADER VIBRO WT *Optional Hauling,DT (Mercy)
Piling Waste Dump 1 PC200 Dozer *Optional Maintanance Hauling Road
Piling ETO 1 PC200 * Pengawas (PIT : Faisal, ETO EFO : Rully)
Piling EFO
Prepare Barging
General Area #CONDITIONAL