DAFTAR HARGA SATUAN MATERIAL DAN JUMLAH MATERIAL YANG DIBUTUHKAN

JUMLAH
NO NAMA MATERIAL SATUAN HARGA MATERIAL KET.
MATERIAL

A BAHAN LOKAL
1 Pasir pasang M3 216.666,67 26,00
2 Tanah Urug M3 50.000,00 3,00
3 Batu kali 15/20 M3 250.000,00 4,00
4 Kerikil batu pecah 2/3 M3 833.333,33 21,00
5 Kayu Usuk Reng 3x4 cm M3 3.500.000,00 4,00
6 Bata Merah Bh 1.500,00 8.260,00
7 Batu Roster (12x11x24) Bh 12.500,00 1.667,00

B BAHAN NON LOKAL

1 Semen 3 Roda pc @ 40 kg Zak 61.000,00 289,00


2 Semen pc @ 40 kg Kg 2.000,00
3 Besi beton 16 mm SNI Btg 240.000,00 106,00
4 Besi beton 12 mm SNI Btg 133.000,00 32,00
5 Besi beton 10 mm SNI Btg 95.000,00 22,00
6 Besi beton 8 mm SNI Btg 65.000,00 129,00
7 Besi beton 6 mm SNI Btg 37.500,00 5,00
8 Besi beton 16 mm SNI Kg 12.631,58 41,00
9 Besi beton 12 mm SNI Kg 12.429,91 4,00
10 Besi beton 10 mm SNI Kg 12.837,84 4,00
11 Besi beton 8 mm SNI Kg 13.713,08 4,00
12 Besi beton 6 mm SNI Kg 14.097,74 3,00
13 Kawat beton Kg 29.000,00 41,00
14 Paku biasa 12 cm Kg 23.000,00 4,00
15 Paku biasa 10 cm Kg 23.000,00 4,00
16 Paku biasa 5 cm Kg 23.000,00 4,00
17 Tripleks 9 mm Lbr 115.000,00 3,00
18 Sealer 5400 (cat dasar) Kg 32.000,00 2,00
19 Cat penutup v-gloos Kg 43.000,00 4,00
20 kuas cat Bh 6.000,00 3,00
21 Fitting lampu bH 18.000,00 3,00
22 lampu 5 watt hanoch Bh 29.000,00 3,00
23 saklar ganda Bh 27.000,00 1,00
24 inbow doos Bh 3.000,00 1,00
25 kabel eterna 2x1,5 mm Meter 12.000,00 50,00
26 pipa conduct btg/3m 14.000,00 8,00
27 knee pipa pconduct Bh 6.000,00 5,00
28 klem Bh 3.000,00 50,00
29 t doos 3 way Bh 6.000,00 3,00
JUMLAH
NO NAMA MATERIAL SATUAN HARGA MATERIAL KET.
MATERIAL
C UPAH
1 Pekerja OH 53.125,00
2 Tukang OH 62.500,00 5 JAM
3 Kepala Tukang OH 62.500,00 KERJA
4 Mandor OH 62.500,00