Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

High number of employees

Type : Enterprise Data center

Growing number of incoming calls : 1250K (2012) -> 4250K Electrical rooms
(2015)
Technical area

Air conditioning/ventilation rooms Safety/security rooms

Enhance the high availability Surface Outdoor area


Phone Call Center DataCenter production equipment

Provide a backup solution. Equipment delivery and storage

Logistic area
Operating teams offices
Ensure the data and service security.
Objectifs
Computer rooms

Provide scalability.
Computer area
Network and operator rooms

Centralization
Location

High speed internet and multi-operator access


Safety and Security
Enfidha
all critical utilities
Located 100 km from Tunis, (99.9 km (50 min) from ben Arous,
Decision
within 1 hour by car 111 km (1 h) from charguia ) and 51 km from sousse
from all the 3 sites.
Criteria
High speed network Easy access to the highway, presence of a railway station and
an airport
Climate Conditions
selected according to seismic risk maps
Avoid hazardous areas

You might also like