HAZARD IDENTIFICATION RISK ASSESMENT RISK CONTROL (HIRARC) PAGE 1 of 11

CADANGAN PEMBINAAN BANGUNAN BAHARU MAJLIS PERBANDARAN KLUANG (MPK), HIRARC NO 01


KLUANG DARUL TA’ZIM UNTUK MAJLIS PERBANDARAN KLUANG (REKA & BINA) REV 00
Prepared by: Reviewed by:
Company / Department Selengara Maju Trading
Signature Signature
Mobilization of Machinery, Name Abdul Rahman Name Lim Choon Heng
Process / Activity Tools, Equipment and
Designation Safety & Health Officer Designation Project Manager
Manpower

RISK
HAZARD IDENTIFICATION RECOMMENDED CONTROL MEASURE
EVALUATION

Likelihood

Risk Level
No

Severity
Hazard
. Work Possible Injury / Existing Control Recommended Control Status/Person In-
Potential
Activity Ill Health Measure Measures Charge

1. Transporting Manual lifting of Musculoskeletal pain Reduce the weight of the load
/unloading of heavy load in
materials Assign additional worker to help
awkward posture
Implement job rotation Site Engineer ,
2 2 4 Site Supervisor,
Provide training on proper lifting SHO / SSS,
and posture Sub-Con
Use mechanical aids for heavy
materials

Manual lifting of Fatigue Reduce the weight of the load


heavy load in
Implement job rotation
awkward posture Site Engineer ,
Provide training on proper lifting 2 2 4 Site Supervisor,
and posture SHO / SSS,
Sub-Con
Use mechanical aids for heavy
materials
HAZARD IDENTIFICATION RISK ASSESMENT RISK CONTROL (HIRARC) PAGE 2 of 11

CADANGAN PEMBINAAN BANGUNAN BAHARU MAJLIS PERBANDARAN KLUANG (MPK), HIRARC NO 01


KLUANG DARUL TA’ZIM UNTUK MAJLIS PERBANDARAN KLUANG (REKA & BINA) REV 00
RISK
HAZARD IDENTIFICATION RECOMMENDED CONTROL MEASURE
EVALUATION

Likelihood

Risk Level
No

Severity
Hazard
. Work Possible Injury / Existing Control Recommended Control Status/Person In-
Potential
Activity Ill Health Measure Measures Charge

1. Overloading in Caused tripping over Check trailer capacity Site Engineer ,


Con vehicle and collapsing of 3 1 3 Site Supervisor,
vehicle Practice good planning for the
SHO / SSS,
amount of materials required.
Sub-Con
Improper unloading Dropping of loads Employ qualified crews to unload Site Engineer ,
3 1 3 Site Supervisor,
Regular inspection by supervisor SHO / SSS,
Sub-Con
Major Injury Employ qualified crews to unload Site Engineer ,
3 1 3 Site Supervisor,
Regular inspection by supervisor SHO / SSS,
Sub-Con
Falling of materials Major injury Lorry driver to ensure loads are
from vehicle and hit properly stacked and secured on
person the lorry bed before driving the
lorry away.
Ensure that vehicle is parked on
Site Engineer ,
firm and level ground.
3 2 6 Site Supervisor,
Materials not to be placed near SHO / SSS,
edge of platform Sub-Con

Trained rigger man, cordon of


work area.
Inspect lifting equipment
HAZARD IDENTIFICATION RISK ASSESMENT RISK CONTROL (HIRARC) PAGE 3 of 11

CADANGAN PEMBINAAN BANGUNAN BAHARU MAJLIS PERBANDARAN KLUANG (MPK), HIRARC NO 01


KLUANG DARUL TA’ZIM UNTUK MAJLIS PERBANDARAN KLUANG (REKA & BINA) REV 00
RISK
HAZARD IDENTIFICATION RECOMMENDED CONTROL MEASURE
EVALUATION

Likelihood

Risk Level
No

Severity
Hazard
. Work Possible Injury / Existing Control Recommended Control Status/Person In-
Potential
Activity Ill Health Measure Measures Charge

1. Fatality Lorry driver to ensure loads are


Con properly stacked and secured on
the lorry bed before driving the
lorry away.
Ensure that vehicle is parked on
Site Engineer ,
firm and level ground.
4 2 8 Site Supervisor,
Materials not to be placed near SHO / SSS,
edge of platform Sub-Con

Trained rigger man, cordon of


work area.
Inspect lifting equipment

Obstruction on drive Major Injury Driver at proper speed and right 3 2 6 Site Engineer ,
way direction Site Supervisor,
SHO / SSS,
Passage to be kept clear Sub-Con
Proper housekeeping
Keep a good lookout when
approaching corner or blind spot
HAZARD IDENTIFICATION RISK ASSESMENT RISK CONTROL (HIRARC) PAGE 4 of 11

CADANGAN PEMBINAAN BANGUNAN BAHARU MAJLIS PERBANDARAN KLUANG (MPK), HIRARC NO 01


KLUANG DARUL TA’ZIM UNTUK MAJLIS PERBANDARAN KLUANG (REKA & BINA) REV 00
RISK
HAZARD IDENTIFICATION RECOMMENDED CONTROL MEASURE
EVALUATION

Likelihood

Risk Level
No

Severity
Hazard
. Work Possible Injury / Existing Control Recommended Control Status/Person In-
Potential
Activity Ill Health Measure Measures Charge

1 Fatality Driver at proper speed and right


Con direction
Passage to be kept clear Site Engineer ,
4 2 8 Site Supervisor,
Proper housekeeping SHO / SSS,
Sub-Con
Keep a good lookout when
approaching corner or blind spot

2. Manual Handling Handling /lifting of Musculoskeletal pain Shift works/wearing PPE(gloves)


Site Engineer ,
heavy loads
Decrease weight at acceptable 2 2 4 Site Supervisor,
level SHO / SSS,
Sub-Con
Fatigue Shift works/wearing PPE(gloves) Site Engineer ,
2 2 4 Site Supervisor,
Decrease weight at acceptable
SHO / SSS,
level.
Sub-Con
Repetitive labors Musculoskeletal pain Shift works/ taking rest as Site Engineer ,
necessary 2 2 4 Site Supervisor,
SHO / SSS,
Implement buddy system.
Sub-Con
Fatigue Shift works/ taking rest as 2 2 4 Site Engineer ,
necessary Site Supervisor,
SHO / SSS,
Implement buddy system. Sub-Con
HAZARD IDENTIFICATION RISK ASSESMENT RISK CONTROL (HIRARC) PAGE 5 of 11

CADANGAN PEMBINAAN BANGUNAN BAHARU MAJLIS PERBANDARAN KLUANG (MPK), HIRARC NO 01


KLUANG DARUL TA’ZIM UNTUK MAJLIS PERBANDARAN KLUANG (REKA & BINA) REV 00
RISK
HAZARD IDENTIFICATION RECOMMENDED CONTROL MEASURE
EVALUATION

Likelihood

Risk Level
No

Severity
Hazard
. Work Possible Injury / Existing Control Recommended Control Status/Person In-
Potential
Activity Ill Health Measure Measures Charge

2. Awkward posture in Musculoskeletal pain Proper posture Site Engineer ,


Con handling 2 2 4 Site Supervisor,
Proper/ frequent training to worker
SHO / SSS,
for manual handling techniques
Sub-Con
Fatigue Proper posture Site Engineer ,
3 2 6 Site Supervisor,
Proper/ frequent training to worker
SHO / SSS,
for manual handling techniques
Sub-Con
Contact with Respiratory problem Wearing proper PPE include mask Site Engineer ,
hazardous 2 2 4 Site Supervisor,
materials SHO / SSS,
Sub-Con
Eye/skin irritation Wearing proper PPE (gloves, Site Engineer ,
safety goggle) 3 2 6 Site Supervisor,
SHO / SSS,
Sub-Con
Working at height Fatality To demark the work area with
barricades and proper signage.
Site Engineer ,
Only designated personnel are Site Supervisor,
4 2 8
allowed to enter the work area. SHO / SSS,
Lifting crew to conduct initial hoist Sub-Con
before any operational hoisting.
HAZARD IDENTIFICATION RISK ASSESMENT RISK CONTROL (HIRARC) PAGE 6 of 11

CADANGAN PEMBINAAN BANGUNAN BAHARU MAJLIS PERBANDARAN KLUANG (MPK), HIRARC NO 01


KLUANG DARUL TA’ZIM UNTUK MAJLIS PERBANDARAN KLUANG (REKA & BINA) REV 00
RISK
HAZARD IDENTIFICATION RECOMMENDED CONTROL MEASURE
EVALUATION

Likelihood

Risk Level
No

Severity
Hazard
. Work Possible Injury / Existing Control Recommended Control Status/Person In-
Potential
Activity Ill Health Measure Measures Charge

2. Caught in between Finger crushed Site supervisor to ensure only


Con trained persons are allowed to Site Engineer ,
handle with the machine. 3 2 6 Site Supervisor,
SHO / SSS,
Proper PPE(Hand glove) Sub-Con

Hand/finger injuries Site supervisor to ensure only


trained persons are allowed to Site Engineer ,
handle with the machine. 2 2 4 Site Supervisor,
SHO / SSS,
Proper PPE(Hand glove) Sub-Con

3. Loading and Unsafe and Major Injury Adequate segregation of 3 2 6 Site Engineer ,
unloading using unsound ground pedestrians and vehicular traffic Site Supervisor,
crane condition. will be maintained at all times. SHO / SSS,
Reversing of vehicles and plant Sub-Con
will be minimized at all times.
To check ground condition before
confirming and positioning the
crane.
Competent/ trained lifting crew
such as crane operator with valid
Competency certificate and rigger
and signal man with sufficient
training certificate.
HAZARD IDENTIFICATION RISK ASSESMENT RISK CONTROL (HIRARC) PAGE 7 of 11

CADANGAN PEMBINAAN BANGUNAN BAHARU MAJLIS PERBANDARAN KLUANG (MPK), HIRARC NO 01


KLUANG DARUL TA’ZIM UNTUK MAJLIS PERBANDARAN KLUANG (REKA & BINA) REV 00
RISK
HAZARD IDENTIFICATION RECOMMENDED CONTROL MEASURE
EVALUATION

Likelihood

Risk Level
No

Severity
Hazard
. Work Possible Injury / Existing Control Recommended Control Status/Person In-
Potential
Activity Ill Health Measure Measures Charge

3 Ensure parking ground is been


Con surveyed and is sufficient for
parking of crane slewing
movement

Toppling of crane Fatality Competent/ trained lifting crew


(overweight) such as crane operator with valid
competency certificate and rigger
and signal man with sufficient
training certificate.
Ensure parking ground is been
surveyed and is sufficient for Site Engineer ,
parking of crane slewing 4 2 8 Site Supervisor,
movement SHO / SSS,
Sub-Con
Ensure sufficient counter weight
are loaded and fixed onto the
crane before commencement of
work.
Make sure outrigger of the crane
fully extended.
3. Toppling of crane Major Injury Competent/ trained lifting crew 3 2 6 Site Engineer ,
Con (overweight) such as crane operator with valid Site Supervisor,
competency certificate and rigger SHO / SSS,
and signal man with sufficient Sub-Con
training certificate.
HAZARD IDENTIFICATION RISK ASSESMENT RISK CONTROL (HIRARC) PAGE 8 of 11

CADANGAN PEMBINAAN BANGUNAN BAHARU MAJLIS PERBANDARAN KLUANG (MPK), HIRARC NO 01


KLUANG DARUL TA’ZIM UNTUK MAJLIS PERBANDARAN KLUANG (REKA & BINA) REV 00
RISK
HAZARD IDENTIFICATION RECOMMENDED CONTROL MEASURE
EVALUATION

Likelihood

Risk Level
No

Severity
Hazard
. Work Possible Injury / Existing Control Recommended Control Status/Person In-
Potential
Activity Ill Health Measure Measures Charge

Ensure parking ground is been


surveyed and is sufficient for
parking of crane slewing
movement
Ensure sufficient counter weight
are loaded and fixed onto the
crane before commencement of
work.
Make sure outrigger of the crane
fully extended.

Tripping and falling Major Injury Works is to be maintained clear


(poor and free from any obstruction
housekeeping)
Protentional tripping to be Site Engineer ,
identified and barricaded properly 3 1 3 Site Supervisor,
SHO / SSS,
During toolbox talk make involved Sub-Con
work crew to identify protentional
tripping hazard.

3. Falling of crane Fatality All lifting machine should have 4 2 8 Site Engineer ,
Con (overweight) valid PMA certificate. Site Supervisor,
SHO / SSS,
Crane operator should have valid Sub-Con
certificate
HAZARD IDENTIFICATION RISK ASSESMENT RISK CONTROL (HIRARC) PAGE 9 of 11

CADANGAN PEMBINAAN BANGUNAN BAHARU MAJLIS PERBANDARAN KLUANG (MPK), HIRARC NO 01


KLUANG DARUL TA’ZIM UNTUK MAJLIS PERBANDARAN KLUANG (REKA & BINA) REV 00
RISK
HAZARD IDENTIFICATION RECOMMENDED CONTROL MEASURE
EVALUATION

Likelihood

Risk Level
No

Severity
Hazard
. Work Possible Injury / Existing Control Recommended Control Status/Person In-
Potential
Activity Ill Health Measure Measures Charge

All safety devices on crane, safety


latch on crane hook and lifting
appliances are in good working
condition.

Lifting supervisor conduct


additional check on the entire
lifting machine to be operational
readiness before crane
mobilization.
Verified by site safety personnel
on actual operation.

Falling of crane Major Injury All lifting machine should have


(overweight) valid PMA certificate.
Crane operator should have valid
certificate
3. All safety devices on crane, safety
Con latch on crane hook and lifting
appliances are in good working
condition. Site Engineer ,
3 2 6 Site Supervisor,
Lifting supervisor conduct
SHO / SSS,
additional check on the entire Sub-Con
HAZARD IDENTIFICATION RISK ASSESMENT RISK CONTROL (HIRARC) PAGE 10 of 11

CADANGAN PEMBINAAN BANGUNAN BAHARU MAJLIS PERBANDARAN KLUANG (MPK), HIRARC NO 01


KLUANG DARUL TA’ZIM UNTUK MAJLIS PERBANDARAN KLUANG (REKA & BINA) REV 00
RISK
HAZARD IDENTIFICATION RECOMMENDED CONTROL MEASURE
EVALUATION

Likelihood

Risk Level
No

Severity
Hazard
. Work Possible Injury / Existing Control Recommended Control Status/Person In-
Potential
Activity Ill Health Measure Measures Charge

lifting machine to be operational


readiness before crane
mobilization.
Verified by site safety personnel
on actual operation.

Failure of lifting Major Injury All lifting gear must be inspected


gear prior to lifting ensure that there is
no defect found Site Engineer ,
3 2 6 Site Supervisor,
Ensure lifting supervisor conduct a
SHO / SSS,
daily check on all lifting gear and
Sub-Con
lifting machine are valid certificate,
safe and good working condition.

4.. Storage of Materials fall into Minor Injury Provide proper barricade around 2 3 6 Site Engineer ,
Materials same level materials storage on site with Site Supervisor,
storage are signage SHO / SSS,
Sub-Con
Store materials slightly above
ground with timer or pallet place
4. underneath.
Con
All materials to be stored away
from emergency or common
access.
Materials not stored above 2M
HAZARD IDENTIFICATION RISK ASSESMENT RISK CONTROL (HIRARC) PAGE 11 of 11

CADANGAN PEMBINAAN BANGUNAN BAHARU MAJLIS PERBANDARAN KLUANG (MPK), HIRARC NO 01


KLUANG DARUL TA’ZIM UNTUK MAJLIS PERBANDARAN KLUANG (REKA & BINA) REV 00
RISK
HAZARD IDENTIFICATION RECOMMENDED CONTROL MEASURE
EVALUATION

Likelihood

Risk Level
No

Severity
Hazard
. Work Possible Injury / Existing Control Recommended Control Status/Person In-
Potential
Activity Ill Health Measure Measures Charge

height
All materials not stock near to
edges

Materials fall into Bodily Injured Provide proper barricade around


same level materials storage on site with
storage are signage
Store materials slightly above
ground with timer or pallet place
underneath.
All materials to be stored away
Site Engineer ,
from emergency or common Site Supervisor,
access. SHO / SSS,
Materials not stored above 2M Sub-Con
height
All materials not stock near to 3
edges 3 9
HAZARD IDENTIFICATION RISK ASSESMENT RISK CONTROL (HIRARC) PAGE 12 of 11

CADANGAN PEMBINAAN BANGUNAN BAHARU MAJLIS PERBANDARAN KLUANG (MPK), HIRARC NO 01


KLUANG DARUL TA’ZIM UNTUK MAJLIS PERBANDARAN KLUANG (REKA & BINA) REV 00
RISK
HAZARD IDENTIFICATION RECOMMENDED CONTROL MEASURE
EVALUATION

Likelihood

Risk Level
No

Severity
Hazard
. Work Possible Injury / Existing Control Recommended Control Status/Person In-
Potential
Activity Ill Health Measure Measures Charge

5. Traffic Major Traffic Fatality Provide flagman to control traffic


Management Accident
Advance warning sign in place
along the public road
Site Engineer ,
Implement Traffic management at Site Supervisor,
4 3 12
site SHO / SSS,
Conduct training to flagman Sub-Con

All delivery of materials avoids


using public road

Major Traffic Major Injury Provide flagman to control traffic


Accident
Advance warning sign in place
along the public road
Site Engineer ,
Implement Traffic management at Site Supervisor,
3 2 6
site SHO / SSS,
Conduct training to flagman Sub-Con

All delivery of materials avoids


using public road