Kannan 1

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

MIMIS - Print Quotation https://tnhorticulture.tn.gov.in:8080/Print/PrintQuotation/H-DGL-vd...

GOVERNMENT OF TAMILNADU
Tamil Nadu Horticulture Development Agency (TANHODA - Implementing Agency)

Department Of Horticulture

Dams Agri Private Limited - Quotation

Application Basic Detail Quotation Date: 12-10-2022 02:01:49 PM

MI ID H-DGL- Farmer Name Kannan


vdmr-3378740766-2022-23

Fittings & Accessories 0.00% Mi Reference No 003

Farmer Type SF / MF MI Type Sprinkler

Mi Area 0.800 Total Area 0.82

District Dindigul Block Vadamadurai

Village Padiyur Farmer Mobile 9698914365

Sprinkler Type Portable Sprinkler Sprinkler Spacing 63mm Coupler

Survey Number Sub-Division No Total Area(Ha) MI Area(Ha)

1735 2A2 0.06 0.06

1746 2A2 0.23 0.22

1772 2 0.28 0.28

1774 1A 0.25 0.24

Crop Name MI Area Spacing Pro Rata Spacing

Vegetables 0.80 6m*6m 6m*6m

S.No Component Name Unit Price / Actual Total


Unit Qty Price
(Rs.) (No's) (Rs)

1 HDPE Pipes with Quick coupled (Pipe of Class 2 3.2 kg - cm2 IS 14151 Part II 63 Mr 503.00 26 13078.00
mm diameter)

2 GI Riser Pipe 3/4 diameter x 75 cm long No 97.00 4 388.00

3 Quick coupled HDPE End Plug (63 mm) No 86.00 1 86.00

4 Quick coupled HDPE Tee with Coupler (63mm) No 302.00 1 302.00

5 Quick Coupled HDPE Pump Connecting Nipple 63mm IS:14151 Part 2 No 270.00 1 270.00

6 Quick coupled HDPE 63mm Foot batten Assembly - Plastic/Metal No 346.00 4 1384.00

7 Sprinkler Nozzles (1.7 to 2.8 Kg/cm2) : IS12232 Part 1 (Brass) No 367.00 4 1468.00

8 Quick Coupled HDPE Bend with Coupler 90 Degree (63mm) IS:14151 Part 2 No 227.00 1 227.00

Total Material 42 17203.00

Fittings & Accessories 0.00

Total Amount taken for Subsidy Calculation (A) 17203.00

Eligible Government Subsidy (100% of Total Amount (A) with 12.00% GST) 19267.36

Farmer Contribution (0.00% of Total Amount) 0.00

Extra Cost to be paid by Farmer for Replace components not covered under subsidy 0.00

Extra Cost to be paid by Farmer for Additional components not covered under subsidy 0.00

Difference Cost to be paid by Farmer in excess of Subsidy 0.00

12.00% GST for (Additional components Cost + Replace components Cost + Difference Cost) 0.00

Amount to be paid by Farmer to company (0.00% contribution + Additional components Cost + Replace components Cost + 0.00
Difference Cost)

Final Estimate Value for Farmer(inclusive of Additional component cost if any) 19267.36

1 of 1 12-10-2022, 14:02

You might also like