Difference (m3) -6
Design Criteria
-BRE Digest 365 t50 = (S x 0.5) / (f x A50)
t50 = 273383 s
-Time of emptying half the storage 75.94 hrs
Calculation Sheet
Project Title: Al Hayat Island Calc. By OK
Calculations Title: Trench Soakaway 02 Checked By IT
Design Criteria
-BRE Digest 365 t50 = (S x 0.5) / (f x A50)
t50 = 1204702 s
-Time of emptying half the storage 334.6 hrs
Calculation Sheet
Project Title: Al Hayat Island Calc. By OK
Calculations Title: Trench Soakaway 03 Checked By IT
Difference (m3) 56
Design Criteria
-BRE Digest 365 t50 = (S x 0.5) / (f x A50)
t50 = 625303 s
-Time of emptying half the storage 173.7 hrs
Calculation Sheet
Project Title: Al Hayat Island Calc. By OK
Calculations Title: Trench Soakaway 04 Checked By IT
Difference (m3) -1
Design Criteria
-BRE Digest 365 t50 = (S x 0.5) / (f x A50)
t50 = 270795 s
-Time of emptying half the storage 75.2 hrs
Calculation Sheet
Project Title: Al Hayat Island Calc. By OK
Calculations Title: Trench Soakaway 05 Checked By IT
Difference (m3) -6
Design Criteria
-BRE Digest 365 t50 = (S x 0.5) / (f x A50)
t50 = 266783 s
-Time of emptying half the storage 74.1 hrs
Calculation Sheet
Project Title: Al Hayat Island Calc. By OK
Calculations Title: Trench Soakaway 06 Checked By IT
Difference (m3) -5
Design Criteria
-BRE Digest 365 t50 = (S x 0.5) / (f x A50)
t50 = 267419 s
-Time of emptying half the storage 74.3 hrs
Calculation Sheet
Project Title: Al Hayat Island Calc. By OK
Calculations Title: Trench Soakaway 07 Checked By IT
Difference (m3) -4
Design Criteria
-BRE Digest 365 t50 = (S x 0.5) / (f x A50)
t50 = 270241 s
-Time of emptying half the storage 75.1 hrs
Calculation Sheet
Project Title: Al Hayat Island Calc. By OK
Calculations Title: Trench Soakaway 08 Checked By IT
Difference (m3) -1
Design Criteria
-BRE Digest 365 t50 = (S x 0.5) / (f x A50)
t50 = 277740 s
-Time of emptying half the storage 77.1 hrs
Calculation Sheet
Project Title: Al Hayat Island Calc. By OK
Calculations Title: Trench Soakaway 09 Checked By IT
Difference (m3) -4
Design Criteria
-BRE Digest 365 t50 = (S x 0.5) / (f x A50)
t50 = 278820 s
-Time of emptying half the storage 77.4 hrs
Calculation Sheet
Project Title: Al Hayat Island Calc. By OK
Calculations Title: Trench Soakaway 10 Checked By IT
Difference (m3) -1
Design Criteria
-BRE Digest 365 t50 = (S x 0.5) / (f x A50)
t50 = 3522 s
-Time of emptying half the storage 1 hrs
Soakaway Trench 1 125 3.00 2.00