Calculation Sheet

Project Title: Al Hayat Island Calc. By OK


Calculations Title: Trench Soakaway 01 Checked By IT

Impermeable Catchment Area /CA (m2): 9,395


Infiltration Rate at Soakaway (m/s): 5.00E-06
Ground Water Level (m) 0.50
Outfall Invert Level (m) 3.47
Trench width 3.00
Trench length 96
Trench effective depth 2.00
Trench exfiltration depth 1.00
as50 = 2 x W x L x D/2 198
void ratio of granular fill 95%

Storm Duration 10 Year Intensities Precipitation Inflow Outflow Storage


min hr i m (m3) (m3) (m3)
1 0.02 188.22 0.0031 29.47 0.06 29.41
5 0.08 139.56 0.0116 109.26 0.30 108.97
10 0.17 98.90 0.0165 154.86 0.59 154.27
15 0.25 76.30 0.0191 179.21 0.89 178.32
20 0.33 62.18 0.0207 194.73 1.19 193.54
30 0.50 45.64 0.0228 214.39 1.78 212.61
45 0.75 34.33 0.0257 241.90 2.67 239.22
60 1.00 26.99 0.0270 253.57 3.56 250.01
90 1.50 19.26 0.0289 271.42 5.35 266.08
120 2.00 15.39 0.0308 289.18 7.13 282.05
180 3.00 11.54 0.0346 325.25 10.69 314.56
240 4.00 9.27 0.0371 348.37 14.26 334.11
300 5.00 7.81 0.0391 366.87 17.82 349.05
360 6.00 6.95 0.0417 391.77 21.38 370.39
720 12.00 4.73 0.0568 533.26 42.77 490.49
1440 24.00 2.78 0.0667 626.83 85.54 541.30

Storage Required (m3) 541.30


Storage Provided (m3) 547.20

Difference (m3) -6

Design Criteria
-BRE Digest 365 t50 = (S x 0.5) / (f x A50)
t50 = 273383 s
-Time of emptying half the storage 75.94 hrs
Calculation Sheet
Project Title: Al Hayat Island Calc. By OK
Calculations Title: Trench Soakaway 02 Checked By IT

Impermeable Catchment Area /CA (m2): 5,237


Infiltration Rate at Soakaway (m/s): 5.00E-06
Ground Water Level (m) 0.50
Outfall Invert Level (m) 3.68
Trench width 2.00
Trench length 12
Trench effective depth 2.00
Trench exfiltration depth 1.00
as50 = 2 x W x L x D/2 28
void ratio of granular fill 95%

Storm Duration 10 Year Intensities Precipitation Inflow Outflow Storage


min hr i m (m3) (m3) (m3)
1 0.02 188.22 0.0031 16.43 0.01 16.42
5 0.08 139.56 0.0116 60.91 0.04 60.86
10 0.17 98.90 0.0165 86.32 0.08 86.24
15 0.25 76.30 0.0191 99.90 0.13 99.77
20 0.33 62.18 0.0207 108.55 0.17 108.38
30 0.50 45.64 0.0228 119.51 0.25 119.26
45 0.75 34.33 0.0257 134.84 0.38 134.46
60 1.00 26.99 0.0270 141.35 0.50 140.84
90 1.50 19.26 0.0289 151.30 0.76 150.54
120 2.00 15.39 0.0308 161.19 1.01 160.19
180 3.00 11.54 0.0346 181.30 1.51 179.79
240 4.00 9.27 0.0371 194.19 2.02 192.17
300 5.00 7.81 0.0391 204.50 2.52 201.98
360 6.00 6.95 0.0417 218.38 3.02 215.36
720 12.00 4.73 0.0568 297.25 6.05 291.20
1440 24.00 2.78 0.0667 349.41 12.10 337.32

Storage Required (m3) 337.32


Storage Provided (m3) 45.60

Difference (m3) 292

Design Criteria
-BRE Digest 365 t50 = (S x 0.5) / (f x A50)
t50 = 1204702 s
-Time of emptying half the storage 334.6 hrs
Calculation Sheet
Project Title: Al Hayat Island Calc. By OK
Calculations Title: Trench Soakaway 03 Checked By IT

Impermeable Catchment Area /CA (m2): 12,312


Infiltration Rate at Soakaway (m/s): 2.40E-06
Ground Water Level (m) 0.50
Outfall Invert Level (m) 3.13
Trench width 3.00
Trench length 125
Trench effective depth 2.00
Trench exfiltration depth 1.00
as50 = 2 x W x L x D/2 256
void ratio of granular fill 95%

Storm Duration 10 Year Intensities Precipitation Inflow Outflow Storage


min hr i m (m3) (m3) (m3)
1 0.02 188.22 0.0031 38.62 0.04 38.59
5 0.08 139.56 0.0116 143.19 0.18 143.00
10 0.17 98.90 0.0165 202.94 0.37 202.57
15 0.25 76.30 0.0191 234.85 0.55 234.30
20 0.33 62.18 0.0207 255.19 0.74 254.45
30 0.50 45.64 0.0228 280.96 1.11 279.85
45 0.75 34.33 0.0257 317.00 1.66 315.34
60 1.00 26.99 0.0270 332.30 2.21 330.09
90 1.50 19.26 0.0289 355.69 3.32 352.38
120 2.00 15.39 0.0308 378.96 4.42 374.54
180 3.00 11.54 0.0346 426.24 6.64 419.61
240 4.00 9.27 0.0371 456.53 8.85 447.68
300 5.00 7.81 0.0391 480.78 11.06 469.72
360 6.00 6.95 0.0417 513.41 13.27 500.14
720 12.00 4.73 0.0568 698.83 26.54 672.29
1440 24.00 2.78 0.0667 821.46 53.08 768.37

Storage Required (m3) 768.37


Storage Provided (m3) 712.50

Difference (m3) 56

Design Criteria
-BRE Digest 365 t50 = (S x 0.5) / (f x A50)
t50 = 625303 s
-Time of emptying half the storage 173.7 hrs
Calculation Sheet
Project Title: Al Hayat Island Calc. By OK
Calculations Title: Trench Soakaway 04 Checked By IT

Impermeable Catchment Area /CA (m2): 6,118


Infiltration Rate at Soakaway (m/s): 5.00E-06
Ground Water Level (m) 0.50
Outfall Invert Level (m) 3.32
Trench width 3.00
Trench length 62
Trench effective depth 2.00
Trench exfiltration depth 1.00
as50 = 2 x W x L x D/2 130
void ratio of granular fill 95%

Storm Duration 10 Year Intensities Precipitation Inflow Outflow Storage


min hr i m (m3) (m3) (m3)
1 0.02 188.22 0.0031 19.19 0.04 19.15
5 0.08 139.56 0.0116 71.15 0.20 70.96
10 0.17 98.90 0.0165 100.85 0.39 100.46
15 0.25 76.30 0.0191 116.70 0.59 116.12
20 0.33 62.18 0.0207 126.81 0.78 126.03
30 0.50 45.64 0.0228 139.61 1.17 138.44
45 0.75 34.33 0.0257 157.52 1.76 155.77
60 1.00 26.99 0.0270 165.12 2.34 162.78
90 1.50 19.26 0.0289 176.75 3.51 173.24
120 2.00 15.39 0.0308 188.31 4.68 183.63
180 3.00 11.54 0.0346 211.81 7.02 204.79
240 4.00 9.27 0.0371 226.86 9.36 217.50
300 5.00 7.81 0.0391 238.91 11.70 227.21
360 6.00 6.95 0.0417 255.12 14.04 241.08
720 12.00 4.73 0.0568 347.26 28.08 319.18
1440 24.00 2.78 0.0667 408.19 56.16 352.03

Storage Required (m3) 352.03


Storage Provided (m3) 353.40

Difference (m3) -1

Design Criteria
-BRE Digest 365 t50 = (S x 0.5) / (f x A50)
t50 = 270795 s
-Time of emptying half the storage 75.2 hrs
Calculation Sheet
Project Title: Al Hayat Island Calc. By OK
Calculations Title: Trench Soakaway 05 Checked By IT

Impermeable Catchment Area /CA (m2): 5,854


Infiltration Rate at Soakaway (m/s): 5.00E-06
Ground Water Level (m) 0.50
Outfall Invert Level (m) 3.26
Trench width 3.00
Trench length 60
Trench effective depth 2.00
Trench exfiltration depth 1.00
as50 = 2 x W x L x D/2 126
void ratio of granular fill 95%

Storm Duration 10 Year Intensities Precipitation Inflow Outflow Storage


min hr i m (m3) (m3) (m3)
1 0.02 188.22 0.0031 18.36 0.04 18.33
5 0.08 139.56 0.0116 68.08 0.19 67.89
10 0.17 98.90 0.0165 96.49 0.38 96.12
15 0.25 76.30 0.0191 111.67 0.57 111.10
20 0.33 62.18 0.0207 121.33 0.76 120.58
30 0.50 45.64 0.0228 133.59 1.13 132.45
45 0.75 34.33 0.0257 150.73 1.70 149.02
60 1.00 26.99 0.0270 158.00 2.27 155.73
90 1.50 19.26 0.0289 169.12 3.40 165.72
120 2.00 15.39 0.0308 180.19 4.54 175.65
180 3.00 11.54 0.0346 202.67 6.80 195.86
240 4.00 9.27 0.0371 217.07 9.07 207.99
300 5.00 7.81 0.0391 228.60 11.34 217.26
360 6.00 6.95 0.0417 244.11 13.61 230.50
720 12.00 4.73 0.0568 332.27 27.22 305.06
1440 24.00 2.78 0.0667 390.58 54.43 336.15

Storage Required (m3) 336.15


Storage Provided (m3) 342.00

Difference (m3) -6

Design Criteria
-BRE Digest 365 t50 = (S x 0.5) / (f x A50)
t50 = 266783 s
-Time of emptying half the storage 74.1 hrs
Calculation Sheet
Project Title: Al Hayat Island Calc. By OK
Calculations Title: Trench Soakaway 06 Checked By IT

Impermeable Catchment Area /CA (m2): 5,866


Infiltration Rate at Soakaway (m/s): 5.00E-06
Ground Water Level (m) 0.50
Outfall Invert Level (m) 3.13
Trench width 3.00
Trench length 60
Trench effective depth 2.00
Trench exfiltration depth 1.00
as50 = 2 x W x L x D/2 126
void ratio of granular fill 95%

Storm Duration 10 Year Intensities Precipitation Inflow Outflow Storage


min hr i m (m3) (m3) (m3)
1 0.02 188.22 0.0031 18.40 0.04 18.36
5 0.08 139.56 0.0116 68.22 0.19 68.03
10 0.17 98.90 0.0165 96.69 0.38 96.31
15 0.25 76.30 0.0191 111.89 0.57 111.33
20 0.33 62.18 0.0207 121.58 0.76 120.83
30 0.50 45.64 0.0228 133.86 1.13 132.73
45 0.75 34.33 0.0257 151.03 1.70 149.33
60 1.00 26.99 0.0270 158.32 2.27 156.06
90 1.50 19.26 0.0289 169.47 3.40 166.07
120 2.00 15.39 0.0308 180.56 4.54 176.02
180 3.00 11.54 0.0346 203.08 6.80 196.28
240 4.00 9.27 0.0371 217.51 9.07 208.44
300 5.00 7.81 0.0391 229.07 11.34 217.73
360 6.00 6.95 0.0417 244.61 13.61 231.00
720 12.00 4.73 0.0568 332.95 27.22 305.74
1440 24.00 2.78 0.0667 391.38 54.43 336.95

Storage Required (m3) 336.95


Storage Provided (m3) 342.00

Difference (m3) -5

Design Criteria
-BRE Digest 365 t50 = (S x 0.5) / (f x A50)
t50 = 267419 s
-Time of emptying half the storage 74.3 hrs
Calculation Sheet
Project Title: Al Hayat Island Calc. By OK
Calculations Title: Trench Soakaway 07 Checked By IT

Impermeable Catchment Area /CA (m2): 6,577


Infiltration Rate at Soakaway (m/s): 5.00E-06
Ground Water Level (m) 0.50
Outfall Invert Level (m) 3.54
Trench width 3.00
Trench length 67
Trench effective depth 2.00
Trench exfiltration depth 1.00
as50 = 2 x W x L x D/2 140
void ratio of granular fill 95%

Storm Duration 10 Year Intensities Precipitation Inflow Outflow Storage


min hr i m (m3) (m3) (m3)
1 0.02 188.22 0.0031 20.63 0.04 20.59
5 0.08 139.56 0.0116 76.49 0.21 76.28
10 0.17 98.90 0.0165 108.41 0.42 107.99
15 0.25 76.30 0.0191 125.46 0.63 124.83
20 0.33 62.18 0.0207 136.32 0.84 135.48
30 0.50 45.64 0.0228 150.09 1.26 148.83
45 0.75 34.33 0.0257 169.34 1.89 167.45
60 1.00 26.99 0.0270 177.51 2.52 174.99
90 1.50 19.26 0.0289 190.01 3.78 186.23
120 2.00 15.39 0.0308 202.44 5.04 197.40
180 3.00 11.54 0.0346 227.70 7.56 220.14
240 4.00 9.27 0.0371 243.88 10.08 233.80
300 5.00 7.81 0.0391 256.83 12.60 244.23
360 6.00 6.95 0.0417 274.26 15.12 259.14
720 12.00 4.73 0.0568 373.31 30.24 343.07
1440 24.00 2.78 0.0667 438.82 60.48 378.34

Storage Required (m3) 378.34


Storage Provided (m3) 381.90

Difference (m3) -4

Design Criteria
-BRE Digest 365 t50 = (S x 0.5) / (f x A50)
t50 = 270241 s
-Time of emptying half the storage 75.1 hrs
Calculation Sheet
Project Title: Al Hayat Island Calc. By OK
Calculations Title: Trench Soakaway 08 Checked By IT

Impermeable Catchment Area /CA (m2): 11,737


Infiltration Rate at Soakaway (m/s): 5.00E-06
Ground Water Level (m) 0.50
Outfall Invert Level (m) 2.97
Trench width 3.00
Trench length 119
Trench effective depth 2.00
Trench exfiltration depth 1.00
as50 = 2 x W x L x D/2 244
void ratio of granular fill 95%

Storm Duration 10 Year Intensities Precipitation Inflow Outflow Storage


min hr i m (m3) (m3) (m3)
1 0.02 188.22 0.0031 36.82 0.07 36.75
5 0.08 139.56 0.0116 136.50 0.37 136.14
10 0.17 98.90 0.0165 193.46 0.73 192.73
15 0.25 76.30 0.0191 223.88 1.10 222.79
20 0.33 62.18 0.0207 243.27 1.46 241.80
30 0.50 45.64 0.0228 267.84 2.20 265.64
45 0.75 34.33 0.0257 302.20 3.29 298.90
60 1.00 26.99 0.0270 316.78 4.39 312.39
90 1.50 19.26 0.0289 339.08 6.59 332.49
120 2.00 15.39 0.0308 361.26 8.78 352.48
180 3.00 11.54 0.0346 406.33 13.18 393.16
240 4.00 9.27 0.0371 435.21 17.57 417.64
300 5.00 7.81 0.0391 458.33 21.96 436.37
360 6.00 6.95 0.0417 489.43 26.35 463.08
720 12.00 4.73 0.0568 666.19 52.70 613.49
1440 24.00 2.78 0.0667 783.09 105.41 677.68

Storage Required (m3) 677.68


Storage Provided (m3) 678.30

Difference (m3) -1

Design Criteria
-BRE Digest 365 t50 = (S x 0.5) / (f x A50)
t50 = 277740 s
-Time of emptying half the storage 77.1 hrs
Calculation Sheet
Project Title: Al Hayat Island Calc. By OK
Calculations Title: Trench Soakaway 09 Checked By IT

Impermeable Catchment Area /CA (m2): 16,796


Infiltration Rate at Soakaway (m/s): 5.00E-06
Ground Water Level (m) 0.50
Outfall Invert Level (m) 2.15
Trench width 3.00
Trench length 171
Trench effective depth 2.00
Trench exfiltration depth 1.00
as50 = 2 x W x L x D/2 348
void ratio of granular fill 95%

Storm Duration 10 Year Intensities Precipitation Inflow Outflow Storage


min hr i m (m3) (m3) (m3)
1 0.02 188.22 0.0031 52.69 0.10 52.58
5 0.08 139.56 0.0116 195.34 0.52 194.82
10 0.17 98.90 0.0165 276.85 1.04 275.81
15 0.25 76.30 0.0191 320.38 1.57 318.82
20 0.33 62.18 0.0207 348.13 2.09 346.04
30 0.50 45.64 0.0228 383.28 3.13 380.15
45 0.75 34.33 0.0257 432.46 4.70 427.76
60 1.00 26.99 0.0270 453.32 6.26 447.06
90 1.50 19.26 0.0289 485.24 9.40 475.84
120 2.00 15.39 0.0308 516.98 12.53 504.45
180 3.00 11.54 0.0346 581.48 18.79 562.69
240 4.00 9.27 0.0371 622.80 25.06 597.74
300 5.00 7.81 0.0391 655.88 31.32 624.56
360 6.00 6.95 0.0417 700.39 37.58 662.81
720 12.00 4.73 0.0568 953.34 75.17 878.17
1440 24.00 2.78 0.0667 1120.63 150.34 970.29

Storage Required (m3) 970.29


Storage Provided (m3) 974.70

Difference (m3) -4

Design Criteria
-BRE Digest 365 t50 = (S x 0.5) / (f x A50)
t50 = 278820 s
-Time of emptying half the storage 77.4 hrs
Calculation Sheet
Project Title: Al Hayat Island Calc. By OK
Calculations Title: Trench Soakaway 10 Checked By IT

Impermeable Catchment Area /CA (m2): 333


Infiltration Rate at Soakaway (m/s): 1.00E-04
Ground Water Level (m)
Outfall Invert Level (m) 1.20
Trench width 1.00
Trench length 10
Trench effective depth 0.80
Trench exfiltration depth 0.40
as50 = 2 x W x L x D/2 9
void ratio of granular fill 95%

Storm Duration 10 Year Intensities Precipitation Inflow Outflow Storage


min hr i m (m3) (m3) (m3)
1 0.02 188.22 0.0031 1.04 0.05 0.99
5 0.08 139.56 0.0116 3.87 0.26 3.61
10 0.17 98.90 0.0165 5.49 0.53 4.96
15 0.25 76.30 0.0191 6.35 0.79 5.56
20 0.33 62.18 0.0207 6.90 1.06 5.85
30 0.50 45.64 0.0228 7.60 1.58 6.02
45 0.75 34.33 0.0257 8.57 2.38 6.20
60 1.00 26.99 0.0270 8.99 3.17 5.82
90 1.50 19.26 0.0289 9.62 4.75 4.87
120 2.00 15.39 0.0308 10.25 6.34 3.91
180 3.00 11.54 0.0346 11.53 9.50 2.02
240 4.00 9.27 0.0371 12.35 12.67 -0.32
300 5.00 7.81 0.0391 13.00 15.84 -2.84
360 6.00 6.95 0.0417 13.89 19.01 -5.12
720 12.00 4.73 0.0568 18.90 38.02 -19.11
1440 24.00 2.78 0.0667 22.22 76.03 -53.81

Storage Required (m3) 6.20


Storage Provided (m3) 7.60

Difference (m3) -1

Design Criteria
-BRE Digest 365 t50 = (S x 0.5) / (f x A50)
t50 = 3522 s
-Time of emptying half the storage 1 hrs
Soakaway Trench 1 125 3.00 2.00