Line Pack Calculation

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 6

Operating Temperature 20

Operating Pressure 55
Gas Molecular Weight 16.776
Gas Compessibility 0.8742
Nominal Pipe Size 450
Pipe Schedule XS
Pipe diameter 431.8
Pipeline Length 107000
Pipeline Volume 15668.9

Moles of gas in Pipeline@ 41192.6


Operating Condition

No of Moles @ 55 barg 41192.6


No of Moles @ 10 barg 7276.1
Change in No of Moles 33916.5
Packed Volume 28.31
Withdrawal Rate 25.00
Depletion Time 1.13
Depletion Time 27.18

No of Moles @ 55 barg 41192.6


Change in No of Moles 41192.6
Line Pack Volume @ 55 barg 34.39

No of Moles @ 10 barg 7276.1


Change in No of Moles 7276.1
Line Pack Volume @ 10 barg 6.07
Change in Volume 28.31
Withdrawal Rate 25.00
Depletion Time 1.13
Depletion Time 27.18
Line Packing Calculation

°C Operating Temperature 20 °C
barg Operating Pressure 10 barg
Gas Molecular Weight 16.776
Gas Compessibility 0.9731
mm Nominal Pipe Size 450 mm
Pipe Schedule XS
mm Pipe diameter 431.8 mm
m Pipeline Length 107000 m
m3 Pipeline Volume 15668.9 m3

kmol Moles of gas in Pipeline@ 7276.1 kmol


Operating Condition

kmol
kmol
kmol
MMscf
MMscfd
days
hours

kmol
kmol
MMscf

kmol
kmol
MMscf
MMscf
MMscfd
days
hours
Pipeline Packing
No of No of
Packed Volume
Size Length Moles @ Moles @ 10
Pipeline @ 55 barg
(inch) (km) 55 barg barg
(MMSCF)
(Kmol) (Kmol)

Pipeline Section 18 107 41192.6 7276.1 34.4


ng
Packed Volume Depletion
Depletion
@ 10 barg Rate
time (hours)
(MMSCF) (MMscfd)

6.1 25.0 27.2

You might also like