Appendix B

BE Form 01

Republic of the Philippines


Department of Education
Region 02
Division of Cagayan
BAGGAO NATIONAL SCHOOL OF ARTS AND TRADES
SY 2016 - 2017

BRIGADA ESKWELA
PHYSICAL FACILITIES REPAIR AND MAINTENANCE NEEDS ASSESSMENT FORM
(To be accomplished by the School Physical Facilities Coordinator)
Instruction: Conduct an occular inspection of the school physical facilities listed below. Then provide the neede information to facilitate the improvement to be done on these identified
facilities. (If needed, you may use separate forms for each classroom or school facility.)

Condition Nature of Improvement needed Manpower Needed


Remarks Material Resources needed (Indicate quantity and
FACILITIES (Check One) (e.g. repair, repainting,
(Indicate kind and quantity) Nature of labor services
Satisfactory Unsatisfactory If Unsatisfactory, describe the problem replacement, etc.)
needed)

Lumber ___bd ft.


GI sheets 40 pcs.
GI Nails 10 kls 2 skilled
● School Canteen Unfinished walls, roof, windows and door for completion CW Nails 3kls 3 semi skilled
and flooring Cement 50 bags 2 laborers
sand 4 loads
hollow blocks 800pcs
volcaseal ___

Lumber ___ bd. ft.


GI sheets 64 pcs
GI Nails 6kls
Umbrella Nails 19 kls
2 skilled
Cement ___
1 semi skilled
● Mini Social Hall Left Wing unfinished roof for completion CW nails 5 kls
1 laborers
gravel & sand ___
German Nails 2 kls
volcaseal ___
Rod 37 pcs
tie wire 3 kls
Cement 20 bags
corr. Steel bar ___ 1 skilled
gravel & sand 2 loads 5 laborers
● School Perimeter Fence Unfinished completion
tie wire 2 kls unskilled
rod 20 pcs Apple Green
Paint 4 pales

● Roofs / gutters Rushing Painting Paint (Green) 3 pales 5


● Ceilings
● Walls paints are fading Repainting Apple Green Paint 3 pales 10
● Blackboards paints are fading Repainting 5 galoons 4
● Chairs/desks tables destroyed arm chair and some missing parts replacement of arms and other
parts to be repaired Lumber - (100 board feet) 10
● destroyed faucets repair of PVC line and 5
Water facilities/ Drainage System replacement of faucets PVC pipe / solvent faucets
Paints 2 pales
● Signages old & fading repainting or repair Wood slabs ____
3
tall grasses have grown and plants are dried Assorted packages of
● weeding
School Garden due to the dry seasons vegetable seeds _____ 30

wires 2 boxes outlets


● Lighting 10 pcs electrical tape 3 2 skilled
rolls Switch 10 pcs
receptacle 5 pcs PVC
Clamp 50 pcs mold flex
short circuit, no connection (LGU Building- repair and replacement of some 50m Junction Box 5 pcs
Upstairs) switches and outlets Utility box 5 pcs
Paints (primer) Red
5 students &
oxide ------ _____
● broken window glasses replacement of window glasses laborers
Window glasses of
different sizes ----- 100 pcs
Windows
● Doors paints are fading Repainting Apple Green Pain t4pales 5
● Comfort rooms Not Painted For painting Paint 1 pale 3
some part are low and easily flooded when it Sand & gravel ----- 5 loads
● Re - gravelling 1 loader & 1 dumptruck
School Grounds rains or more)
Tie wire 2 kls 1 skilled
● for completion Cement 20 bags Rod 1 semi skilled
Pathway with plant boxes unfinished Construction and Plastering 30 pcs 3 laborers
Prepared by:
VICTORIO A. TUMANENG APRIL 27, 2016
School Physical Facilities Coordinator Date of Inspection Noted:
ALBERTO T. MAGGAY
Principal I