Professional Documents
Culture Documents
Sizing
Sizing
Sizing
§ Codes & Standards. IEEE Std. 485 IEEE Recommended Practice for Sizing Lead Acid
Batteries for Stationary Applications.
PROJECT DATA
System : Un-grounded
SYSTEM DESCRIPTION
§ DC supply system is envisaged for feeding the Loads of complete 33kV Feeders(16No.)+33kV
Bussection(3No.)+80MVA TFR(4No.)+220kV Feeders(2No.)+220kV Buscoupler(1No.) in an
220/33kV Substation.
§ Plant 220V DC System consists of Valve Regulated Lead Acid (VRLA) Battery with 2Set
Float ,2Set Float cum Boost Charger With DCDB.
§ The battery and battery charger combinations shall be such as to ensure continuity of D.C
supply at load terminals without even momentary interruption.
§ The batteries & charger shall be so designed that the maximum fault level on DCDB is limited
to 10 KA as per battery capacity.
§ DCDB shall have nominal system Voltage of 220V with +10% to (-) 10% variation.
§ Ageing Factor of 25% for Valve Regulated Lead Acid Battery as per Manufacturer
Recommendation.
§ End voltage of cell shall not be less than 1.85 Volt /cell during any time of the duty cycle.
§ Battery shall be capable to become fully charged from complete discharge state by 10 hour
(C10). Battery capacity is designed for Three (3) Hours back up.
§ Temp Correction Factor =1+R [(27-t) / 100], where R=0.9 for 10 hrs discharge as per table-2 of
IS: 1652, t= Min Electrolyte temp = 8˚C. Hence Temp Correction Factor = 1.198
CALCULATION
Input Parameters considered as per standard design values of any reputed manufacturers
DETERMINATION OF NUMBER OF CELLS PER BATTERY BANK & END CELL VOLTAGE/C
= 108.5202 = 110Nos
= 1.8245451077311
= 1.8245
33/220kV SAS
UNIT WATTS TOTAL WATTS
Sl no. Item Qty Continuous Momentary Continuous Momentary
(W) (W) (W) (W)
1 Ethernet S/W 8 32 256 0
2 Small lighting Distribution Boad 1 150 150
3 Misc 1 100 100
4 Inverter (3KVA) 2 2000 4000 0
Total 4506 0
Battery Load Cycle Details
Load Duty Cycle of Battery
Duration 0-119Min 119-120Min 120-121Min 121-239Min 239-240 Min
Cycle A1 A2 A3 A4 A5
Load Current (A) 18.60 46.21 32.34 18.60 46.21
50.00
45.00
40.00
35.00
30.00
0-119
25.00
119-120
120-121
20.00
121-239
239-240
15.00
10.00
5.00
0.00
Load Calculation of 220V DC distribution Board - Unit -I & Unit -II of Axis Wind Farms PSS
2 220kV Transformer Protection Panel 2 137.8 18.6 0.80 1.00 0.80 0.00 1.00 0.00 0.80 0.00 1.00 0.00 0.80 0.00 1.00
3 220kV Bus coupler Protection Panel 1 81.8 6.6 0.80 0.30 0.80 0.00 0.30 0.00 0.80 0.00 0.30 0.00 0.80 0.00 0.30
4 220kV Double Busbar Protection Panel 1 156.0 26.4 0.80 0.57 0.80 0.00 0.57 0.00 0.80 1.00 0.57 0.12 0.80 0.00 0.57
4 220kV Single Busbar Protection Panel 1 56.0 26.4 0.80 0.20 0.80 0.00 0.20 0.00 0.80 0.00 0.20 0.00 0.80 0.00 0.20
5 220kV Tie breaker Protection Panel 1 81.8 6.6 0.80 0.30 0.80 0.00 0.30 0.00 0.80 0.00 0.30 0.00 0.80 0.00 0.30
6 33kV Transformer Protection Panel 2 124.6 18.6 0.80 0.91 0.80 0.00 0.91 0.00 0.80 0.00 0.91 0.00 0.80 0.00 0.91
7 33kV feeder Protection Panel 10 68.6 6.6 0.80 2.49 0.80 0.00 2.49 0.00 0.80 0.00 2.49 0.00 0.80 0.00 2.49
8 33kV Bus section Protection Panel 0 68.6 6.6 0.80 0.00 0.80 0.00 0.00 0.00 0.80 0.00 0.00 0.00 0.80 0.00 0.00
33/220kV SAS 4506.0 0.0 0.50 10.24 0.50 0.00 10.24 0.00 0.50 0.00 10.24 0.00 0.50 0.00 10.24
9 1
10 220kV Single Pole Breaker Tripping 21 8.0 400.0 1.00 0.76 1.00 0.00 0.76 0.00 1.00 0.72 0.76 27.49 1.00 0.00 0.76
11 33kV Three Pole Breaker Tripping 12 10.0 400.0 1.00 0.55 1.00 0.00 0.55 0.00 1.00 0.00 0.55 0.00 1.00 0.00 0.55
12 220kV Single Pole Breaker Closing 21 0.0 200.0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.72 0.00
13 33kV Three Pole Breaker Closing 12 0.0 200.0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18.60 46.21
Battery Calculation
Required Section Size
(6) (3)/(6A) = Positive Plates
(3) (4)
(1) (2) (5) Capacity atT min rate
Changes in Duration of period
Period Load (Amperes) Time to end of section (Minutes) (6A) amps/Pos (Rt) Pos. value Neg. value
load (Amperes) (Minutes)
(or) (6B) K factor (Kt)
Section1 - First period
1 A1= 18.60 A1-0= 18.60 M1= 119.00 T=M1= 119.00 3.06 56.92
Section 1 56.92
Section2 - First two periods only
1 A1= 18.60 A1-0= 18.60 M1= 119.00 T=M1+M2= 120.00 3.07 57.10
2 A2= 46.21 A2-A1= 27.70 M2= 1.00 T=M2= 1.00 0.50 13.85
Sub total 70.95 0.00
Section 2 Total 71.00
Section3 - First three periods only
1 A1= 18.60 A1-0= 18.60 M1= 119.00 T=M1+M2+M3= 121.00 3.08 57.29
2 A2= 46.21 A2-A1= 27.70 M2= 1.00 T=M2+M3= 2.00 0.60 16.62
3 A3= 32.34 A3-A2= -13.90 M3= 1.00 T=M3= 1.00 0.50 -6.95
Sub total 73.91 -6.95
Section 3 66.96
Section4 - First four periods only
1 A1= 18.60 A1-0= 18.60 M1= 119.00 T=M1+M2+M3+M4= 179.00 4.05 75.33
2 A2= 46.21 A2-A1= 27.70 M2= 1.00 T=M2+M3+M4= 60.00 1.88 52.08
3 A3= 32.34 A3-A2= -13.90 M3= 1.00 T=M3+M4= 59.00 1.86 -25.85
4 A4= 18.60 A4-A3= -13.80 M4= 58.00 T=M4= 58.00 1.83 -25.25
Sub total 127.41 -51.11
Section 4 Total 76.30
Battery Uncorrected size Required = max section size of section 1 to 5 + Random equipment load 94.3 AH
Battery size Required = Uncorrected Size X Temp correction factor(1.198) X Aging factor (1.25) X Design Margin (15%) 162.3 AH
2 Duty cycle
4 Sizing
100AH
Load classification
Non-Continous Momentary
Pumps ISO
Motors CB
Fire protection
etc.,
Machine
Tem.p forrect
design
aging factor