Package CP104 Request for Quotation (Major Subcontractor)
Dear Sir,
We (the “Main Contractor”) are currently engaged in construction contract for the Main Contract Works
associated with the Metro Manila Subway Project Phase 1 – Package CP104 and invite you (the “Bidder”
or the “Subcontractor”) to submit your best / keenest price for the above-referenced works
(“Subcontract Works”) in accordance with the enclosed documents and the requirements as set out
below in this letter.
619527895.docx Page 1 of 36
Metro Manila Subway Project Phase 1 MMSP104-COM-PRO001-FM004 Rev.B
Package CP104 Request for Quotation (Major Subcontractor)
2) Number of copies of Quotation(s): Original: 1
Photocopy: 1
Electronic copy (CD): N/A
3) Other requirements: N/A
The Quotation(s), including all correspondence and documents exchanged between the Bidder and
ourselves shall be written in the English language. Supporting documents and printed literature,
brochures, etc. that are part of the Quotation(s) may be in another language provided they are
accompanied by an accurate translation of the document (or relevant part(s) of the document) into
English.
You should note that all documentation (including, without limitation, all designs, drawings and pricing
data) provided to or produced by yourselves as part of this process, is to be treated with the utmost
confidentiality and is not under any circumstances to be divulged to any unauthorized third parties.
Should you have any questions in relation to the attached documents, then these should be submitted
progressively to the undersigned at the address noted in item 1.2) above, and not later than five (5)
working days before the date for return of Quotation(s) set out in item 1.1) above.
You are requested to acknowledge receipt of this Request for Subcontract Quotation and enclosures
and confirm by return that you are able to submit a Quotation(s) in accordance with our requirements.
Yours faithfully,
Yasuyoshi Nomura
General Manager/Chief Representative
On behalf of Tokyu-Tobishima-Megawide Joint Venture
Cc:
Encl.
619527895.docx Page 2 of 36
Metro Manila Subway Project Phase 1 MMSP104-COM-PRO001-FM004 Rev.B
Package CP104 Request for Quotation (Major Subcontractor)
SUBCONTRACT DOCUMENTS
FOR
August 2022
619527895.docx Page 3 of 36
Metro Manila Subway Project Phase 1 MMSP104-COM-PRO001-FM004 Rev.B
Package CP104 Request for Quotation (Major Subcontractor)
CONTENTS
Section
A Relevant Particulars of Subcontract Works
B Relevant Particulars of Main Contract
Appendix 1: Quotation Format
1.1 Pre-qualification Proposal
1.1.1 Details of Completed Projects
1.1.2 Details of Current Projects
1.1.3 Plant, Equipment and Facilities
1.2 Technical Proposal
1.3 Price Proposal
1.3.1 Form of Quotation
1.3.2 Bill of Quantities
Appendix 2: Specifications
Appendix 3: Drawings
Appendix 4: Facilities, plant, equipment and other items
Appendix 5: Programmes
Appendix 6: Request for Clarification Format
619527895.docx Page 4 of 36
Metro Manila Subway Project Phase 1 MMSP104-COM-PRO001-FM004 Rev.B
Package CP104 Request for Quotation (Major Subcontractor)
619527895.docx Page 5 of 36
Metro Manila Subway Project Phase 1 MMSP104-COM-PRO001-FM004 Rev.B
Package CP104 Request for Quotation (Major Subcontractor)
A1 Description of Stone/Granite Works
Subcontract Works:
A2 Subcontract Quotation Unit Price Contract, subject to adjustment for changes in
Price: legislation and cost in accordance with the provisions of the
Main Contract
All other taxes, duties, levies, custom fees and charges, tests
report & certifications, relevant permits & approvals, etc., cost
related to Factory Acceptance Test (FAT) where necessary to be
included in the Quotation Price.
A7 Liquidated damages (LDs) Amount of LDs per 0.05% of the Subcontract Price per day,
for the delay: calendar day: in the currencies and proportions in
which the Subcontract Price is payable
619527895.docx Page 6 of 36
Metro Manila Subway Project Phase 1 MMSP104-COM-PRO001-FM004 Rev.B
Package CP104 Request for Quotation (Major Subcontractor)
Ruling language: English
Any special conditions that are relevant to the Subcontract are to be listed here:
SC1 N/A
619527895.docx Page 7 of 36
Metro Manila Subway Project Phase 1 MMSP104-COM-PRO001-FM004 Rev.B
Package CP104 Request for Quotation (Major Subcontractor)
B-I General
619527895.docx Page 8 of 36
Metro Manila Subway Project Phase 1 MMSP104-COM-PRO001-FM004 Rev.B
Package CP104 Request for Quotation (Major Subcontractor)
APPENDIX 1 QUOTATION FORMAT
1. COMPANY BACKGROUND
Company
Name:
Business Address:
Telephone No:
Facsimile No:
Technical:
Contact No:
Nature of Business:
Yes No
ISO 45001 (or OHSAS 18001) Occupational Health and Safety Management System ☐ ☐
619527895.docx Page 9 of 36
Metro Manila Subway Project Phase 1 MMSP104-COM-PRO001-FM004 Rev.B
Package CP104 Request for Quotation (Major Subcontractor)
3. FINANCIAL CAPABILITY
☐ Attached are copies of financial statements (balance sheets including all related notes, and income
statement) for the last five years, as indicated above, complying with the following conditions.
All such documents reflect the financial situation of the Bidder, and not sister or parent
companies
Historic financial statements must be audited by a certified accountant.
Historic financial statement must be complete, including all notes to the financial statements.
Historic financial statements must correspond to accounting periods already completed and
audited (no statements for partial periods shall be requested or accepted).
619527895.docx Page 10 of 36
Metro Manila Subway Project Phase 1 MMSP104-COM-PRO001-FM004 Rev.B
Package CP104 Request for Quotation (Major Subcontractor)
(thousands)
Average Annual Turnover (USD)
The information supplied should be the Annual Turnover of the Bidder in terms of the amounts billed to
clients for each year for work in progress or completed, converted to USD at the rate of exchange at the
end of the period reported.
Please provide particulars of relevant / similar projects undertaken and completed by your company as
a contractor (single entity, JV member, subcontractor or supplier) over the past 5 years in the attached
format (Appendix 1.1.1).
The below relevant / similar project experiences shall include the following key activities:
1) N/A
Please provide particulars of projects undertaken currently by your company in the attached format
(Appendix 1.1.2).
Please provide particulars of the plant, equipment and facilities considered to be necessary for
undertaking the project whether owned / hired by your company in the attached format (Appendix
1.1.3).
8. LABOUR FORCE
On the basis of the information provided in the prequalification documents, please indicate the likely
source of the labour force required to undertake the works.
9. DESIGN ABILITY
Please indicate your design ability for temporary and / or permanent works.
619527895.docx Page 11 of 36
Metro Manila Subway Project Phase 1 MMSP104-COM-PRO001-FM004 Rev.B
Package CP104 Request for Quotation (Major Subcontractor)
☐ In-house ☐ Subcontracted
List information about key personnel who will be committed to the contract for its duration and attach
their respective CV’s.
Please attach an organization chart showing the company structure including the positions of directors
and key personnel.
Is your company currently involved (or has been involved over the past 5 years) in any arbitration and /
or litigation in relation to claims and / or disputes?
☐ Yes ☐ No
If yes, please provide a brief description of the nature of the dispute, the amount under dispute and the
parties involved. (Please include disputes / claims which are pending arbitration / litigation.)
Is your company currently involved in any adjudication and / or litigation in relation to labour disputes?
☐ Yes ☐ No
If yes, please provide a brief description of the nature and the parties involved.
12. DEBARMENT
☐ I certify that our Company has NOT been debarred by the World Bank Group and / or local
regulatory authorities for more than one year since the date of issuance of this request.
619527895.docx Page 12 of 36
Metro Manila Subway Project Phase 1 MMSP104-COM-PRO001-FM004 Rev.B
Package CP104 Request for Quotation (Major Subcontractor)
☐ I certify that our Company has been debarred by the World Bank Group and / or local regulatory
authorities for a period more than one year BUT that on the date of issuance this request at least three
years had passed since the date of such debarment decision. Details of the debarment are as follows:
I am completing this document as an authorized agent of the company. All the above information are
accurate and correct at the time this form is submitted.
Name: Signature:
Designation: Date:
619527895.docx Page 13 of 36
Metro Manila Subway Project Phase 1 MMSP104-COM-PRO001-FM004 Rev.B
Package CP104 Request for Quotation (Major Subcontractor)
619527895.docx Page 14 of 36
Metro Manila Subway Project Phase 1 MMSP104-COM-PRO001-FM004 Rev.B
Package CP104 Request for Quotation (Major Subcontractor)
1.1.1 DETAILS OF COMPLETED PROJECTS
No. Name of Project Project Owner / Scope of Work / Location Start Date - Contract
Main Contractor Quantity of Supply Completion Value (USD)
Date
sample Tokyo MRT Project CP101 Tokyo MRT/ MEP works (AC, Tokyo, Japan 1/Jan/2021 – 50M USD
Tokyu Construction ventilation, 31/Dec/2022
plumbing)
619527895.docx Page 15 of
Metro Manila Subway Project Phase 1 MMSP104-COM-PRO001-FM004 Rev.B
Package CP104 Request for Quotation (Major Subcontractor)
1.1.2 DETAILS OF CURRENT PROJECTS
No. Name of Project Project Owner / Scope of Work / Location Start Date - Contract
Main Contractor Quantity of Supply Completion Date Value (USD)
<% completion>
sample Tokyo MRT Project CP101 Tokyo MRT/ Rebar supply / Tokyo, Japan 1/Jan/2021 – 10M USD
Tokyu Construction 14000 Tonnes 31/Dec/2022 < 60% >
619527895.docx Page 16 of
Metro Manila Subway Project Phase 1 MMSP104-COM-PRO001-FM004 Rev.B
Package CP104 Request for Quotation (Major Subcontractor)
No. Plant & Equipment Quantity Unit Owned / Hired Capacity Location Remarks
No. Facilities & Storage (Disposal) Yard Quantity Unit Owned / Hired Capacity Location Remarks
619527895.docx Page 17 of
Metro Manila Subway Project Phase 1 MMSP104-COM-PRO001-FM004 Rev.B
Package CP104 Request for Quotation (Major Subcontractor)
619527895.docx Page 18 of
Metro Manila Subway Project Phase 1 MMSP104-COM-PRO001-FM004 Re
Package CP104 Request for Quotation (Major Subcontract
1.2 TECHNICAL PROPOSAL
619527895.docx Page 19 of 36
Metro Manila Subway Project Phase 1 MMSP104-COM-PRO001-FM004 Re
Package CP104 Request for Quotation (Major Subcontract
1.3 PRICE PROPOSAL
619527895.docx Page 20 of 36
Metro Manila Subway Project Phase 1 MMSP104-COM-PRO001-FM004 Re
Package CP104 Request for Quotation (Major Subcontract
concurrent and sequential nature. The Subcontract Quotation Price shall be deemed to have
included adequate allowance for compliance with these obligations.
g) The Main Contractor reserves the right to accept or reject any Quotation received, to waive any
required formality in the Quotations received and to cancel the Quotation process and reject all
Quotations at any time prior to the signing of a Subcontract Agreement, without thereby incurring
any liability to any Bidders.
Bidders are solely responsible for all costs associated with the preparation and submission of their
Quotation. The Main Contractor shall not be liable for any of these costs, regardless of the conduct or
outcome of the Quotation process.
619527895.docx Page 21 of 36
Metro Manila Subway Project Phase 1 MMSP104-COM-PRO001-FM004 Re
Package CP104 Request for Quotation (Major Subcontract
PRICE PROPOSAL
QUOTATION
for
of
SUBCONTRACT WORKS
STONE/GRANITE WORKS
Date:
Reference:
Gentlemen:
(1) We have examined the Subcontract Documents, and Addenda Nos. [ ] for the above named
Subcontract Works. We have examined, understood and checked these documents and have
ascertained that they contain no error or other defects. We accordingly offer to design (to the
extent required), execute and complete the whole of the said Subcontract Works and remedy any
defects therein, in conformity with these Subcontract Documents and the aforementioned Addenda
for the following separate Prices:
(2) We agree to abide by this Quotation for the period of validity prescribed in the Subcontract
Documents, Section A, Item A2 and to extend same for a further period upon the same terms and
619527895.docx Page 22 of 36
Metro Manila Subway Project Phase 1 MMSP104-COM-PRO001-FM004 Re
Package CP104 Request for Quotation (Major Subcontract
conditions, if so called upon.
(3) If our Quotation is accepted, we will provide the Subcontract Performance Security, enter into a
Subcontract Agreement with Tokyu-Tobishima-Megawide Joint Venture (the Main Contractor),
commence and complete the Subcontract Works within the periods prescribed in the Subcontract
documents.
(4) We agree that in respect of the works, goods, materials or services included in the proposed
Quotation we shall undertake towards the Main Contractor such obligations and liabilities as will
enable the Main Contractor to discharge his own obligations and liabilities towards the Employer
under the terms of the Main Contract and we will save harmless and indemnify the Main Contractor
from and against the same and from all claims, proceedings, damages, costs, charges and expenses
whatsoever arising out of or in connection therewith, or arising out of or in connection with any
failure to perform such obligations or to fulfil such liabilities.
(5) Unless and until the formal Subcontract Agreement is prepared and executed, this Quotation
together with your Letter of Intent shall constitute a binding Subcontract between us.
(6) We understand that you have no obligation whatsoever to compensate or indemnify us for any
expense or loss incurred in the preparation of this Quotation and that you are not bound to accept
the lowest or any Quotation that you may receive.
Signature ____________________________________________
_________________________________________________________________________
Witness : ________________________________________________________________
Address : ________________________________________________________________
619527895.docx Page 23 of 36
Metro Manila Subway Project Phase 1 MMSP104-COM-PRO001-FM004 Re
Package CP104 Request for Quotation (Major Subcontract
619527895.docx Page 24 of 36
Metro Manila Subway Project Phase 1 MMSP104-COM-PRO001-FM004 Rev.B
Package CP104 Request for Quotation (Major Subcontractor)
1.3.2 BILL OF QUANTITIES
Please be informed that the attached BOQ (Bill of Quantities) is for reference only.
Please provide cost breakdown for the following BOQ item as part of your proposal.
BILL No.4A STATION ARCHITECTURE WORKS - ORTIGAS NORTH
Pay
No. Description UoM Qty Material Labour Equipment Unit Rate Total Price
Item no
Wall Finishes
1018 (3) Granite Stone Honed Finish –
1018 m2 1,934.25
a1 600x1200x30
1018 (3) Granite Stone Honed Finish –
1018 m2 472.68
a2 1200x150x30
1018 (3)
1018 Granite Stone Polished – 1200x600x30 m2 485.59
b1
1018 (3)
1018 Granite Stone Polished – 1200x150x30 m2 166.61
b2
1018 (3)
1018 Granite Stone Polished – 1200x800x30 m2 1,157.15
b3
Floor Finishes
1018 (3)
1018 Granite Stone Flamed - 600x600x25 m2 5,659.00
c1
1018 (3)
1018 Granite Stone Flamed - 600x300x25 m2 403.00
c2
1018 (3)
1018 Granite Stone Polished – 1200x80x25 m2 30.31
b4
1018 (3)
1018 Granite Stone Polished - 1200x150x25 m2 59.00
b5
1018 (3)
1018 Granite Stone Polished - 1200x600x25 m2 6.00
b7
619527895.docx Page 25 of
Metro Manila Subway Project Phase 1 MMSP104-COM-PRO001-FM004 Rev.B
Package CP104 Request for Quotation (Major Subcontractor)
1018 (3)
1018 Granite Stone Polished - 600x150x25 m2 176.10
b6
1018 (3) In-laid Granite Stone Directional Symbol
1018 m2 35.87
b11 and trim
1203 1203 (1) Granite Flooring; to Elevator m2 10.00
Baseboards, thresholds & Nosing Finish
1018 (3)
1018 Granite Stone Polished - 30mm thk lm 1,712.51
b9
1018 (3)
1018 Granite Stone Polished - 20mm thk lm 128.34
b10
1018 (3) Granite Stone Honed Finish - 200mm
1018 lm 30.20
a3 Threshold
Miscellaneous
1822 1822 (1) Quartz Countertop m2 18.59
1822 1822 (2) Quartz Ledge m2 23.62
619527895.docx Page 26 of
Metro Manila Subway Project Phase 1 MMSP104-COM-PRO001-FM004 Rev.B
Package CP104 Request for Quotation (Major Subcontractor)
1018 (3)
1018 Granite Stone Polished – 1200x150x30 m2 182.50
b2
1018 (3)
1018 Granite Stone Polished – 1200x800x30 m2 1,058.66
b3
Floor Finishes
1018 (3)
1018 Granite Stone Flamed - 600x600x25 m2 5,170.00
c1
1018 (3)
1018 Granite Stone Flamed - 600x300x25 m2 370.00
c2
1018 (3)
1018 Granite Stone Polished - 1200x80x25 m2 31.37
b4
1018 (3)
1018 Granite Stone Polished - 1200x150x25 m2 39.00
b5
1018 (3)
1018 Granite Stone Polished - 1200x600x25 m2 3.00
b7
1018 (3)
1018 Granite Stone Polished - 600x150x25 m2 146.85
b6
1018 (3) In-laid Granite Stone Directional Symbol
1018 m2 35.87
b11 and trim
1203 1203 (1) Granite Flooring; to elevator m2 10.00
Baseboards, thresholds & Nosings Finish
1018 (3)
1018 Granite Stone Polished - 30mm thk lm 1,134.83
b9
1018 (3)
1018 Granite Stone Polished - 20mm thk lm 137.73
b10
1018 (3) Granite Stone Honed Finish - 200mm
1018 lm 11.58
a3 Threshold
Miscellaneous
1822 1822 (1) Quartz Countertop m2 14.02
619527895.docx Page 27 of
Metro Manila Subway Project Phase 1 MMSP104-COM-PRO001-FM004 Rev.B
Package CP104 Request for Quotation (Major Subcontractor)
1822 1822 (2) Quartz Ledge m2 20.94
619527895.docx Page 28 of
Metro Manila Subway Project Phase 1 MMSP104-COM-PRO001-FM004 Rev.B
Package CP104 Request for Quotation (Major Subcontractor)
C70x600x20 mm Jetblack Granite Anti-slip
1018 (5)
1018 Chamfered Nosing, Flamed Finish - m2 231.11
c
Stair Nosing
SUB TOTAL BILL No. 7A (PHP)
619527895.docx Page 29 of
Metro Manila Subway Project Phase 1 MMSP104-COM-PRO001-FM004 Re
Package CP104 Request for Quotation (Major Subcontract
APPENDIX 2 SPECIFICATIONS
https://megawideph-my.sharepoint.com/:f:/g/personal/racalma_megawide_com_ph/
EjGFeMtHUktGkHR6TRWMYEcBkAVH43fikhV3zRKyASoYAw?e=9iWf9l
Notes:
1) If the link does not connect after clicking the web page address above, please try copying the
link and paste into your browser.
APPENDIX 3 DRAWINGS
619527895.docx Page 30 of 36
Metro Manila Subway Project Phase 1 MMSP104-COM-PRO001-FM004 Re
Package CP104 Request for Quotation (Major Subcontract
https://megawideph-my.sharepoint.com/:f:/g/personal/racalma_megawide_com_ph/En-
R7zTmvixBlWiJZDeGb5kBK0gGiLo8FcJveLga_VCv5w?e=OCcKM1
1. 8_CP104_P2_S(VI)_(WR)_6(ED)_21Aug2020_14_Arch_ON
2. 8_CP104_P2_S(VI)_(WR)_6(ED)_21Aug2020_15_Arch_OS
3. 8_CP104_P2_S(VI)_(WR)_6(ED)_8Apr2020_20_Ped_ON
4. 8_CP104_P2_S(VI)_(WR)_6(ED)_11Aug2020_21_SPL_ON
5. 8_CP104_P2_S(VI)_(WR)_6(ED)_11Aug2020_22_SPL_OS
6. 8_CP104_P2_S(VI)_(WR)_6(ED)_5Feb2021_14_Arch_ON_only revision extracted_r
7. 8_CP104_P2_S(VI)_(WR)_6(ED)_5Feb2021_15_Arch_OS_only revision extracted_r
Notes:
1) If the link does not connect after clicking the web page address above, please try copying the
link and paste into your browser.
619527895.docx Page 31 of 36
Metro Manila Subway Project Phase 1 MMSP104-COM-PRO001-FM004 Re
Package CP104 Request for Quotation (Major Subcontract
Facilities, plant, equipment and other items
a) The following facilities, plant, equipment and other items shall be provided to the Subcontractor
(SC) by the Main Contractor (MC) for the due performance of the Subcontract Works. These
facilities, etc. shall not be used for any other purpose other than the performance of the
Subcontract Works.
b) The facilities, etc. are not provided on an exclusive usage basis but in a manner that will support
the Main Contract Programme and the Subcontract programmes. For the effective and timely
usage of the facilities, etc. the Subcontractor will be proactive in the notification and planning of
such facilities with the Main Contractor, other subcontractors and other contractors.
Site Fencing ☐ ü ☐
Offices Construction / rental ☐ ü ☐ If necessary
Power supply ☐ ü ☐
Electricity
Power consumption ☐ ü ☐
Cabling and main panel ☐ ü ☐
Subcontractor's
Office Sub-cabling and phone
Telephone ☐ ü ☐
sets
Consumption ☐ ü ☐
Main piping ☐ ☐
Water
Consumption ☐ ☐
Labour Camp: ☐ ☐ If necessary
Main cabling & main
☐ ☐
distribution board
Temporary
electricity for small Secondary
tools panel/distribution ☐ ☐
boards
Consumption ☐ ☐
General safety/access ☐ ☐
Temporary lighting
Working area/task ☐ ☐
Working Site Main water piping ☐ ☐
Water storage tanks ☐ ☐
Temporary water Secondary water piping ☐ ☐
Secondary pump ☐ ☐
Consumption ☐ ☐
Provide site toilets ☐ ☐ ☐
Toilets Maintain & clean
☐ ☐
toilets
Lifting equipment ☐ ☐ If necessary
619527895.docx Page 32 of 36
Metro Manila Subway Project Phase 1 MMSP104-COM-PRO001-FM004 Re
Package CP104 Request for Quotation (Major Subcontract
Main access to the
☐ ☐
working site
Temporary road
Access within the
☐ ☐
working area
Working area ☐ ☐
Rubbish & Cleaning
Subcontractor's offices ☐ ☐
waste control
Disposal To off-Site ☐ ☐
Main gate ☐ ☐
Security guards Around Subcontractor's
Security ☐ ☐
facilities
Gate pass Issuing ☐ ☐
Main access ☐ ☐
Safety Working area ☐
First Aid & nurse ☐ ☐
MC to provide
Monthly fossil fuel Reporting monthly the
☐ ü ☐ the template
consumption report usage of fossil fuel for the report
Soil Quality Monitoring ☐ ☐ ☐
Ground level
☐ ☐ ☐
Environment monitoring
Environmental Water quality
☐ ☐ ☐
monitoring monitoring
Air quality monitoring ☐ ☐ ☐
Noise level monitoring ☐ ☐ ☐
Vibration monitoring ☐ ☐ ☐
Method statements ☐ ☐
Inspection and test
☐ ☐
plan
Documentation Manufacturing plans ☐ ☐
Management plans ☐ ☐
Material approvals ☐ ☐
Sample submissions ☐ ☐
Test and Testing ☐ ☐
Inspection Inspection ☐ ☐
Factory
Transportation,
Acceptance Test Cost related to FAT ☐ ☐ ☐
Accommodation, etc.
(FAT)
Design drawings ☐ ☐
Drawings
Structural drawings ☐ ☐
619527895.docx Page 33 of 36
Metro Manila Subway Project Phase 1 MMSP104-COM-PRO001-FM004 Re
Package CP104 Request for Quotation (Major Subcontract
Shop drawings ☐ ☐
As-built drawings ☐ ☐
Construction All Risk
☐ ☐ ☐
(CAR) Insurance
Workmen's
Compensation ☐ ☐ ☐
Insurance
Vehicles Insurance
for Physical Damage
☐ ☐ ☐
& Third Party
Insurances Liability
Main Contractors’
Plant, Machinery &
☐ ☐ ☐
Equipment
Insurance
Marine Cargo
☐ ☐ ☐
Insurance
Professional
☐ ☐ ☐
Indemnity lnsurance
APPENDIX 5 PROGRAMMES
5.1 Main Contractor’s Preliminary Programme
619527895.docx Page 34 of 36
Metro Manila Subway Project Phase 1 MMSP104-COM-PRO001-FM004 Re
Package CP104 Request for Quotation (Major Subcontract
N/A
619527895.docx Page 35 of 36
Metro Manila Subway Project Phase 1 MMSP104-COM-PRO001-FM004 Rev.B
Package CP104 Request for Quotation (Major Subcontractor)
APPENDIX 6 REQUEST FOR CLARIFICATION FORMAT
Sr. Vol Sec Clause Description Bidder’s Question Main Contractor’s Answer
No.